جمال حجي, Electrical Engineering Group Supervisor

جمال حجي

Electrical Engineering Group Supervisor

PGESCO

البلد
مصر - القاهرة
التعليم
بكالوريوس, Electrical Engineering
الخبرات
18 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 3 أشهر

Electrical Engineering Group Supervisor في PGESCO
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يونيو 2021

Hayah Karima Project

• Review and approve Supplier’s design documents such as MV Switchgear, Kiosks, RMU, MV and LV cables, MV and LV Poles, and Lighting fixtures, etc. for accuracy and compliance with codes, standards, and specification requirements.
• Review and approve Bill of Quantities provided by Contractors for all villages.

Electrical Construction Manager في PGESCO
  • مصر - القاهرة
  • نوفمبر 2020 إلى يونيو 2021

TB2 Travellator Project

• Following up Electrical construction activities such as the installation works of MDBs, Low Voltage Cables, Earthing Systems, and lighting systems
• Following up Low Current construction activities such as the installation works Fire Alarm Systems, CCTV and Building Management System

Senior Electrical Construction Engineer في PGESCO
  • مصر - القاهرة
  • يوليو 2018 إلى نوفمبر 2018

Cairo West Supercritical Power Plant (650 MW)

•Following up testing and commissioning activities of 500kV and 200kV Switchyards’ control and protection panels
•Following up Electrical construction activities such as the installation works of Power Transformers, MV Switchgears, LV Switchgears, MCCs, DC and UPS panels, Transformer Protection panels, DCS panels and Buildings’/Areas’ groundings and lighting
•Following up the Testing of MV and LV motors and cables
•Following up the installation works of cable trays for various areas and buildings
•Following up the cable installation activities such as cable routing and termination in daily basis
•Reviewing Installation progress of Electrical Installation Contractor
•Attending weekly site meeting and Providing construction status for the cable installation activities (actual cable lengths and termination)
•Inspecting and providing materials receiving reports (MRR) for Electrical equipment
•Reviewing the Turn over Packages of different systems prior to energization.
•Providing construction power for all contractors
•Coordinating between contractors
•Implementing safety standards on site.

Senior Construction Engineer في PGESCO
  • مصر - القاهرة
  • فبراير 2018 إلى يونيو 2018

New Capital Power Plant (4800 MW Combined Cycle Power Plant)

•Following up Electrical construction activities
•Following up the closing of the punch list items
•Supporting the chemical cleaning and steam blow activities
•Attending daily site meeting.
•Implementing safety standards on site.

Electrical Engineering Group Supervisor في PGESCO
  • مصر - القاهرة
  • فبراير 2015 إلى فبراير 2018

Borg Al Arab Power Plant (6X10 MW Gas Engines)

•Prepare bid tabulations and bid evaluation report for Gas Engine, Transformers, MV & LV Switchgears and 66kV GIS contract packages
•Perform Power System Study Calculation using ETAP software
•Perform Transformer and Generator Breaker Sizing Calculation
•Participate in preparing project schedule (activities vs. hours)
•Follow up procurement process for electrical equipment.

Deputy Electrical Engineering Group Supervisor في PGESCO
  • مصر - القاهرة
  • أغسطس 2014 إلى يونيو 2016

Giza North Power Station (3X750 MW Combined Cycle Power Plant)

•Participate in preparing project schedule (activities vs. hours)
•Follow up procurement process for electrical equipment.
•Review and approve vendor design documents for accuracy and compliance with codes, standards and specification requirements.
•Coordinate between Project Owner and all contractors.

Electrical Engineering Group Supervisor في ACESCO
  • ليبيا - طرابلس
  • سبتمبر 2013 إلى أغسطس 2014

Arabian Consulting Engineering and Services Company (ACESCo) - Libya
•Provide technical supports for all substations and OHTLs projects
•Review and approve vendor design documents for accuracy and compliance with codes, standards and specification requirements.
•Provide progress reports
•Leading technical meetings with Owner and Contractors.
•Provide construction support

Deputy Electrical Engineering Group Supervisor في PGESCO
  • مصر - القاهرة
  • مارس 2010 إلى سبتمبر 2013

Giza North Power Station (3X750 MW Combined Cycle Power Plant)

•Prepare bid tabulations and bid evaluation report for Switchyard package (500kV and 220kV Gas Insulated Switchyard).
•Participate in all electrical packages evaluations (500kV and 200kV GIS Switchyard, Transformers, MV & LV Switchgears and Electrical Installation packages).
•Review and approve vendor design documents of GIS contractor such as 500kV and 220kV GIS single line diagram and schematic diagrams of control and protection circuits
•Review and approve vendor design documents of civil contractor for Administration, Main Control, Construction Management, Warehouse and Workshop Buildings for panel schedules and power circuits, HVAC system, fire alarm system, CCTV system, paging system, lighting (Indoor/outdoor), grounding and lightning protection drawings.
•Review and approve vendor design documents of schematic and logic diagram for MV and LV networks

Electrical Engineer Group Leader في PGESCO
  • مصر - القاهرة
  • يناير 2007 إلى مارس 2010

Sidi Krir and El-Atf Power Stations (2X750 MW Combined Cycle Power Plant)

•Develop electrical specifications and single line, relaying and metering diagrams.
•Develop Electrical Load List for all power plant systems
•Perform cable design activities such as cables sizing, routing and terminations
•Prepare bid tabulations and bid evaluation report.
•Prepare preliminary and detailed design for the balance of plant (BOP) of all electrical systems.
•Prepare and study technical drawings and specifications of electrical systems.
•Lead technical discussions with contractor in coordination meetings.
•Prepare technical reports related to specific design issues or contractors/clients clarifications.
•Participate in all electrical packages evaluations (switchgear, transformers, and generators).
•Perform calculation for Electrical Equipment Sizing (Transformers, DC, UPS, and Emergency Diesel Generator)

Electrical Engineer في PGESCO
  • مصر - القاهرة
  • مارس 2005 إلى ديسمبر 2006

Cairo North Power Station - Module II (750 MW Combined Cycle Power Plant)

•Prepare and study technical drawings and specifications of electrical systems.
•Review and approve vendor design documents for accuracy and compliance with codes, standards and specification requirements.
•Coordinate between Project Owner and all contractors.
•Perform cable design activities such as cables sizing, routing and terminations
•Issue cable pulling cards and terminations cards for construction.
•Update database with the actual cable length.
•Draw electrical schematic diagrams.

Electrical Construction Engineer في PGESCO
  • مصر - القاهرة
  • مارس 2004 إلى مارس 2005

Cairo North Power Station - Module I (750 MW Combined Cycle Power Plant)

•Issue cable pulling cards and terminations cards for construction.
•Update Setroute database with the actual cable length.
•Issue cable summary report periodically.
•Resolve construction problems with engineering department.
•Create and update Motor Control Center (MCC) punch list for Cairo North project.
•Study Request for Information (RFI's) received from contractors and provides solutions.
•Implementing safety standards on site.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Benha University
  • يناير 2022

Faculty of Engineering

Specialties & Skills

Bentley MicroStation
Construction & Property
Electrical Engineering
Power Engineering
CABLING
SPECIFICATION
LIGHTING
MEETING FACILITATION
ROUTERS
SCHEMATIC DIAGRAMS
BALANCE
CONSULTING

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

Project Management Institution (PMI)
  • Member
  • July 2022

التدريب و الشهادات

Project Management Skills for Leaders (تدريب)
معهد التدريب:
LinkedIn eLearning
تاريخ الدورة:
November 2022
المدة:
ساعة واحدة
Project Management Professional (PMP) (الشهادة)
تاريخ الدورة:
July 2022
صالحة لغاية:
July 2025

الهوايات

  • Soccer and Squash