Commissioning Engineer
Doosan Heavy industries & construction
Total years of experience :15 years, 8 Months
Commissioning of 700*4 power plant
➢ Testing & Commissioning of Power Transformers up to 180MVA & HT Motors
➢ Testing & Commissioning of Protection Relays (Numerical, Electromagnetic & Micro Processor Based Protection Relays)
➢ Worked in Power Plant, Steel plant and Sub-Stations.
.
➢ Differential & REF Stability Tests for Transformer up to 180MVA.
➢ Differential Stability Tests for HT Motors
From Mar 2013 to Present:
Company Name: Doosan Heavy Industries & Construction
(Rabigh Power Plant Project #2, Saudi Arabia)
Client: Saudi Electricity Company
Project: 700*4 Power Plant
Destination: Commissioning Engineer.
From Sep 2008 to Feb 2013:
Company Name: TECHNOSYS ENGINEERS & CONSULTANTS
(CHENNAI) PRIVATE LIMITED, CHENNAI.
DETAILS OF EXPERIENCE:
Organization: Larsen & Toubro Hazira. Gujarat
Project: LTSSHF
Client: Larsen & Toubro Limited (ECC Division)
Duties & Responsiibilities: Testing & Commissioning of 220kv switchwards, 33KV Switchboards, 6.6KV Switchboards with auto changeover scheme (L&T), 415V Switchboards (L&T), Power Transformers (Upto 100MVA), HT Motors, LT Motors, HT and LT Power Cables, Prepare Control Cable Shcedule and As Build Drawings, Overcurrent & Earthfault, Under & Overvoltage, Differential Protection relays.
Organization: Bhushan Steel
Project: Steel Plant
Client: Larsen & Toubro Limited (ECC Division)
Duties & Responsiibilities: Testing & Commissioning of 33KV Switchboards, 6.6KV Switchboards, Transformers, Transformer auxiliary protections, Differential and REFStability test and 415v switchboards
Organization: Adani Power Ltd.
Project: Power Plant 4620 MW
Client: SepcoIII
Duties & Responsiibilities: Testing & Commissioning of 400/11KV, GT&UAT Bay, Power Transformer, Transformer auxiliary protections, Differential and REFStability test.
Organization: Adani Power Ltd.
Project: Power Plant 4620 MW
Client: ABB
Duties & Responsiibilities: Testing & Commissioning of 220KV, Sectionaliser Bay, Line Bay, B/C bay, auxiliary protections, Differential Stability test & Busbar Panel.
Organization: SAIL
Project: Steel Plant
Client: Larsen & Toubro Limited (ECC Division)
Duties & Responsiibilities: Testing & Commissioning of 33KV Switchboards, 6.6KV Switchboards, Transformers, Transformer auxiliary protections, Differential and REFStability test and 415v switchboards
Organization: MPL.
Project: Power Plant 1050MW.
Client: Voltas
Duties & Responsiibilities: Testing & Commissioning of 11KV Switchboard, 415V Switchboards (L&T), 11KV/433V Distribution Transformers (315KVA), LT Motors, HT and LT Power Cables, Prepare Control Cable Shcedule, As Build Drawings, Protection Relays-Overcurrent & Earthfault, Under & Overvoltage.
Organization: Cairn Energy India Pvt. Ltd. (671 KM, Barmer to
Saliya pipe line project), Gujarat.
Project: Oil & Gas Pipeline Project
Client: Larsen & Toubro Limited (ECC Division)
Duties and Responsibilities: Testing & Commissioning of 6.6KV Switchboards (Siemens), 415V Switchboards (L&T and GE), Power Transformers - (500KVA), Scott- Tee transformer, CT, PT, Scheme Checks, Auxiliary Relays & HT Power Cables, Transformer Stability test, Preparation of Control Cable Schedule, As Build Drawings & Protection Relays-Overcurrent, Earthfault, Under & Overvoltage Protections.
I L.GANESH here by confirm that the information's given above am true to the best of my knowledge & belief.
Yours Truly,
Place: Date: (L.GANESH)
Testing & Commissioning of Electrical Switchgears
BE-Electrical & Electronics Engineering Computer Literacy: Hard ware & Networking