QA/QC Manager
Parsons International Ltd
مجموع سنوات الخبرة :17 years, 9 أشهر
Division Infrastructure
Project Title Construction of Duhail Intersection and Al Gharrafa Street
Project Cost USD 220 Million
Client ASHGHAL (Qatar PWA Department)
Key Aspects of the Project A depressed 3-phase, signalized junction at elevation -1 that will provide all left-turn movements between Al Shamal Road and Al Khafji Street / Al Gharrafa Street, and through movements along Al Khafji / Al Gharrafa Street.
Multi-spanned at-grade bridges that will provide uninterrupted through movement along Al Shamal Road.
Multi-spanned elevated bridges at +1 level along Al Khafji / Al Gharrafa Street that will provide uninterrupted through movement.
Braiding ramp at Al Shamal southbound that will provide an exit to the service road.
Various Stakeholder works including:
• Intelligent Transportation System (ITS), Water supply network, Storm water system, including firefighting network;
Division Infrastructure
Project Title Design and Construct New Orbital Highway & Truck Route (P023) - Contract 2: Salwa Road to North Relief Road
Project Cost USD 1.2 Billion
Client ASHGHAL (Qatar PWA Department)
Key Aspects of the Project 55 Km Road Length with 5 x 5 Lane Motor Way,
2 x 2 Lane Truck Route,
8 Interchanges with multi-spanned elevated bridges including a Cut & Cover Tunnel
High Performance concrete, Subgrade, Cement Bound Macadam, Base Course and Wearing Course with PMB
Various Stakeholder works including:
• Intelligent Transportation System (ITS), Water supply network, including firefighting network and Storm water network;
•Treated Sewerage Effluent (TSE) network;
• Extra High Voltage (EHV), High Voltage (HV), Medium Voltage (MV) and Low Voltage (LV) electricity networks;
• Installation of Structural lighting, luminaires, feeder pillars, LV cables and all the required accessories/ elements for the street lighting.
• Ooredoo, Vodafone and Qatar National Broadband Network;
• Qatar Armed Forces (QAF) network
Appreciations: Living AECOM Behaviors Certificate for “Be Impactful Execution and Results”
Division Infrastructure
Projects handled As a division Quality Manager, I was responsible for establishing, implementation and monitoring of QMS on the Projects.
JSPL Steel Plant @ Angul,
Power Plant Project @ Barmer,
Chenani - Nashri Road Tunnel Project @ Jammu
Project Cost INR 145 Crores
Client Vizag Port Trust
Key Aspects of the Project Underwater Piling, Berth expansion into the sea, Coal Stacker, Control Buildings and ground improvement works.
Appreciations: For outstanding Quality Implementation on underground piling work
Division Infrastructure
Project Title National Highway NS-43/TN/Madurai to Kanyakumari
Project Cost INR 244 Crores
Client National Highway Authority of India
Key Aspects of the Project 42 km. Length National Highway
Earthworks, Cement Bound Materials, Granular Sub-base, Dry Lean Concrete, Pavement Quality Concrete, Asphalt Base Course and Wearing Course
Key Aspects of the Project 30 km Length State Highway
Granular Sub-base, Wet Mix Macadam, Dense Bituminous Macadam, Semi-Dense Bituminous Concrete, Bituminous Macadam and Bituminous Concrete.
(B.GANESH RAJ RADHESHYAM)
in
in