Genee Martin Lacsamana, SR. HSE ENGINNER

Genee Martin Lacsamana

SR. HSE ENGINNER

NPCC

Location
Philippines
Education
Diploma, Occupation Health & Safety
Experience
33 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :33 years, 7 Months

SR. HSE ENGINNER at NPCC
  • United Arab Emirates - Abu Dhabi
  • My current job since October 1990

 Supervises the day to day activities of operational HSE services to ensure that all personnel adhere to the Company’s HSE Rules and Regulations and safe work practices.
 Ensures implementation of safe systems of work by carrying out regular inspections in all operational areas. Highlights matters of concern with recommendations to the Management for corrective action. Follows up on implementation of recommendations.
 Carries out on-site HSE induction programmes for all Company and sub-contractor personnel to ensure awareness of HSE requirements and standards.
 Identifies and conducts various Fire and HSE Trainings while on work locations based on the Company’s approved HSE Training Matrix.
 Participates in all fire fighting and emergency incident activities in order to ensure that correct procedures are followed and risk to personnel and physical plant/equipment is minimized.
 Conducts and coordinates investigations of incidents and assist in investigation of major incidents. Respond to Operational related emergencies and giving advise as required.
 Ensures fire and emergency equipment is in place and maintained in optimum operating condition through regular servicing and maintenance schedules.
 Assists the Lead HSE Engineer in the implementation of the Company’s Health, Safety and Environmental Management System (HSEMS).
 Identifies work hazards, their effects and implements risk reduction measures in relation to his area of responsibility and implements Departmental objectives.
 Participates on HSE meetings on work location to discuss and resolve HSE issues prevailing on site.
 Participates on Risk Assessment meetings for mitigating critical activities and ensure that these are properly communicated to both supervision and work force for NPCC and sub-contractors.

Sr. HSE Engineer at National Petroleum Construction Company
  • United Arab Emirates
  • June 1997 to September 2012

June 1997 - To date National Petroleum Construction Company, PO Box 2058, Abu Dhabi, UAE.

Position Sr. HSE Engineer
02 Aug. 12 - todate ZADCO - Pipelaying & Riser installation works@SATAH FULL field Development project (DLB 750)

at Nos. Water Injection Lines
  • December 2011 to January 2012

19 Dec. 11 - 01 Jan. 12 ADMA-OPCO - Replacement of 20 Nos. Water Injection Lines in ZK and 4 Nos. in US Fields (Barge DLB 750)

at ADMA-OPCO - ZCSC Demothballing Project
  • January 2012 to January 2012

02 Jan. 12 - 16 Jan. 12 ADMA-OPCO - ZCSC Demothballing Project (Barge DLB 750)

Integrated Gas Development at ADMA-OPCO
  • United Arab Emirates
  • October 2011 to November 2011

01 Oct 11 - 26 Nov. 11 ADMA-OPCO - Integrated Gas Development (EPC) Ummshaif Wellhead Towers Project (Barge DLB 750)

at Integrated Gas Development Project Offshore Facilities
  • September 2011 to September 2011

04 Sep 11 - 30 Sep 11 Integrated Gas Development Project Offshore Facilities (IGD-HAP) (Barge DLB 750)

at ONGC
  • India
  • October 2010 to May 2011

03 Oct 10 - 14 May 11 ONGC - B22 Field Development Project & RS 12 Well Platform Project (Barge DLB 750)

at ADMA
  • United Arab Emirates
  • May 2010 to July 2010

18 May 10 - 25 Jul 10 ADMA-OPCO - WHT-US-251 Modifications & Associated Work - USGIF Project (Barge DLB-750)

at ADOC
  • March 2010 to May 2010

29 Mar. 10 - 17 May 10 ADOC - Installation of Pipelines in the Mubarraz Offshore Field (Barge DLB-750)

at ADMA-OPCO - Gas Processing Facilities (GPF) Project (Zakum West Complex)
  • February 2010 to March 2010

09 Feb. 10 - 28 Mar. 10 ADMA-OPCO - Gas Processing Facilities (GPF) Project (Zakum West Complex)

at USSC Shutdown Tie-In Works
  • October 2009 to November 2009

12 Oct. 09 - 24 Nov. 09 ADMA-OPCO - IGD-HAP Project - 2009 USSC Shutdown Tie-In Works (Barge SEP-350)

at Nos. Water Injection Lines
  • May 2009 to October 2009

12 May 09 - 11 Oct. 09 ADMA-OPCO - Replacement of 20 Nos. Water Injection Lines in ZK and 4 Nos. in US Fields (Barge SEP-350)

QatarGas II Development Project at Barge SEP
  • August 2008 to January 2009

21 Aug. 08 - 31 Jan. 09 QatarGas II Development Project (Barge SEP-350)

QatarGas II Development Project at Barge PLB
  • November 2007 to April 2008

15 Nov. 07 - 13 Apr. 08 QatarGas II Development Project (Barge PLB-648)

at USSC Tie-Ins Project
  • October 2007 to November 2007

23 Oct. 07 - 09 Nov. 07 ADMA-OPCO USGIF - USSC Tie-Ins Project (Kamikazi Barge)

Field Development Plan at MAERSK OIL QATAR AS BLOCK
  • May 2007 to August 2007

01 May 07 - 17 Aug. 07 MAERSK OIL QATAR AS BLOCK 5 Field Development Plan 2005 Package 9 - Wellhead Jackets for B & C Locations (HLS 2000 Ship)

at ONGC
  • India
  • February 2007 to April 2007

01 Feb. 07 - 30 Apr. 07 ONGC - B&S-Nh4 Well Platforms Project-2 (HLS 2000 Ship)

at Various Project at Mussafah Fabrication Yard
  • December 2006 to January 2007

19 Dec. 06 to 31 Jan. 07 Various Project at Mussafah Fabrication Yard.

at SAUDI ARAMCO
  • United Arab Emirates
  • September 2006 to October 2006

09 Sep. 06 to 12 Oct. 06 SAUDI ARAMCO - North Safaniya Artificial Lift Jackets, Decks, Pipelines and Cables (Barge SEP-350)

at Barge SEP
  • August 2006 to September 2006

07 Aug. 06 to 08 Sep. 06 Barge SEP-250 alongside Mussafah Fabrication Yard.

at Das Island
  • June 2006 to August 2006

20 June 06 to 06 Aug. 06 ADMA-OPCO - Construction Contract for New SPM Loading Facilities TB-3 at Das Island (Barge SEP-250)

at Nos. W.I. Lines
  • June 2006 to June 2006

01 June 06 to 19 June 06 ADMA-OPCO - Replacement of 6 Nos. W.I. Lines in ZK Field (Barge SEP-250)

at ADMA-OPCO - Boat Landing Replacement
  • April 2006 to May 2006

24 Apr. 06 to 11 May 06 ADMA-OPCO - Boat Landing Replacement at USSC (Barge SEP-250)

at ADGAS - Hire of Marine Barge Spread - Das Island
  • March 2006 to April 2006

30 Mar 06 to 23 Apr. 06 ADGAS - Hire of Marine Barge Spread - Das Island (Barge SEP-250)

Offshore Khuff Gas Development Project at ADMA-OPCO
  • United Arab Emirates
  • August 2005 to November 2005

16 Aug 05 to 30 Nov 05 ADMA-OPCO - Offshore Khuff Gas Development Project (Barge Kamikazi)

at Hyundai - Mut Project
  • India
  • January 2005 to May 2005

05 Jan 05 to 25 May 05 Hyundai - Mut Project - Pipe laying of 30", 26", 18", 16" & 14" in Mumbai High & Bassein Fields, India (Barge DLB 1000)

Offshore Khuff Gas Development Project at Adma Opco
  • United Arab Emirates
  • November 2004 to January 2005

24 Nov 04 to Jan 05 Adma Opco - Offshore Khuff Gas Development Project - Offshore Facilities and Pipelines. U.A.E.

Soroosh and Nowrooz Integrated Development Project, IRAN at Shell
  • United Arab Emirates
  • March 2004 to September 2004

02 Mar 04 to 21 Sept 04 Shell - Soroosh and Nowrooz Integrated Development Project, IRAN.

Soroosh and Nowrooz Integrated Development Project at Shell
  • France
  • February 2004 to February 2004

07 Feb 04 to 19 Feb 04 Shell - Soroosh and Nowrooz Integrated Development Project (Project 111) - Jacket Installation (SLQ, NPP2, NLQ) Project 111 - Topside Float over (SPP2), SLQ (Barges JWB-252, PLB-648, DMS Conquest, Big Orange - IV) IRAN.

Soroosh and Nowrooz Integrated Development Project at Shell
  • United Arab Emirates
  • September 2003 to December 2003

01 Sep 03 to 15 Dec 03 Shell - Soroosh and Nowrooz Integrated Development Project (Project 111) - Jacket Installation (SLQ, NPP2, NLQ) Project 111 - Topside Float over (SPP2), SLQ - Living QuarterHeavy Lift Ship 2000, IRAN.

Al Khaleej Northern Area Development Project
  • July 2003 to August 2003

20 July 03 to 28 Aug 03 Total Fina Elf - Al Khaleej Northern Area Development Project,
Project 2050 - Jacket Installation (DP4, PP1) Heavy Lift Ship, QATAR.

Soroosh and Nowrooz Integrated Development Project Project 111 at Shell
  • United Arab Emirates
  • May 2003 to July 2003

25 May 03 to 17 July 03 Shell - Soroosh and Nowrooz Integrated Development Project Project 111 - Jacket Installation (SPP1, SPP2, SLQ) 1ST Campaign, Heavy Lift Ship 2000, IRAN.

at ASRY
  • Bahrain
  • February 2003 to May 2003

28 Feb 03 to 15 May 03 ASRY
Dry dock
Derrick Laying Barge 1000, BAHRAIN

Block 5 Development Project - Phase 1 at Maersk Oil Qatar AS
  • July 2002 to November 2002

23 July 02 to 14 Nov 02 Maersk Oil Qatar AS - Block 5 Development Project - Phase 1. Project 2001 - Pipelines Campaign 111 Pipe Laying Barge 648, QATAR.

Offshore Khuff Gas Development Project Stability Trial Pit, NASHI Barge, U.A.E at ADMA
  • United Arab Emirates
  • June 2002 to July 2002

18 June 02 to 06 July 02 ADMA - OPCO - Offshore Khuff Gas Development Project Stability Trial Pit, NASHI Barge, U.A.E.

at Maersk Oil Qatar AS
  • April 2002 to June 2002

13 Apr 02 to 11 June 02 Maersk Oil Qatar AS - Block 5 Development Project - Phase 1 Project 2001 - Pipelines Derrick Laying Barge 750, QATAR.

at ONGCL
  • India
  • October 2001 to January 2002

30 Oct 01 to 15 Jan 02 ONGCL - Mumbai High South Field ZA Well Platform Project Hook up of Topside Pipe Laying Barge 648, INDIA.

Al Khaleej Field Development Project Cable Laying Pipe Laying Barge 648, QATAR at Elf Qatar
  • May 2001 to August 2001

18 May 01 to 27 Aug 01 Elf Qatar - Al Khaleej Field Development Project Cable Laying Pipe Laying Barge 648, QATAR.

at ADCO
  • United Arab Emirates
  • March 2001 to May 2001

10 Mar. 01 to 15 May 01 ADCO - Additional Manifolds at Buhasa Remote Degassing Station

at ADOC - Upgrading of Mubarraz Oil Field Demolition
  • September 2000 to November 2000

21 Sep 00 to 19 Nov 00 ADOC - Upgrading of Mubarraz Oil Field Demolition, and Modification of existing Platform, NAASHI Barge U.A.E.

at Das Island
  • United Kingdom
  • July 2000 to September 2000

19 July 00 to 19 Sep 00 ADMA - OPCO - Replacement of 30" MOL from Zakum to Das Island, Hook up, Self-Elevated Platform 250, U.A.E.

at ADMA - OPCO - Zakum Oil Field Gas Injection Project Hook Up
  • April 2000 to July 2000

20 Apr 00 to July 00 ADMA - OPCO - Zakum Oil Field Gas Injection Project Hook Up, Self-Elevated Platform 250, U.A.E.

at ADCO - Replacement of BCDS Produced Water Separation
  • September 1999 to April 2000

04 Sep 99 to 17 Apr 00 ADCO - Replacement of BCDS Produced Water Separation System at Bab Field

at ADCO
  • United Arab Emirates
  • November 1998 to July 1999

20 Nov 98 to 15 Jul 99 ADCO - Upgrade of Produced Water Separation System at Buhasa

at ADNOC
  • United Arab Emirates
  • September 1998 to November 1998

05 Sep 98 to 18 Nov 98 ADNOC - Ruwais Refinery Expansion (EUM) Project Storage Tanks

at ADNOC - Ruwais Refinery Expansion Project Spirical Tank LPG Blending Facility
  • January 1998 to June 1998

04 Jan 98 to 19 Jun 98 ADNOC - Ruwais Refinery Expansion Project Spirical Tank LPG Blending Facility

at ENRON - Combined Tapti
  • India
  • September 1997 to December 1997

22 Sep 97 to 15 Dec 97 ENRON - Combined Tapti / Panna Pipeline Project, Hook up - Derrick Laying Barge 750, INDIA

Shaheen Development Project - Package 2, Hook up, Derrick Laying Barge 750, QATAR at Maersk Qatar
  • United Kingdom
  • July 1997 to September 1997

19 July 97 to 15 Sep 97 Maersk Qatar - Al Shaheen Development Project - Package 2, Hook up, Derrick Laying Barge 750, QATAR

Senior Safety Officer at EEI Corporation
  • December 1996 to January 1997

Dec. 1996 - 1997 - June EEI Corporation (Project - MRT-3 EDSA Quezon City Project)

Position Senior Safety Officer
Job Description Responsible for monitoring EEI standard of road safety promulgated by MMDA/DOTC and preparation of vehicular accident reports & job safety evaluation/analysis reports. Reports directly to Safety Supervisor.

Senior Safety Officer at EEI Corporation
  • March 1996 to December 1996

Mar. 1996 - Dec. 1996 EEI Corporation (Project - 53 MW Geothermal Project Kidapawan, North Cotabato)

Position Senior Safety Officer
Job Description Responsible for conducting regular field project site inspections, monitoring compliance of Project with the loss control programme, instituting corrective measures, preparation of job safety analysis reports, maintaining good working relationship with Operation Managers and Line Supervision Subcontractors. Prepared Rigging Procedure. Report directly to Construction Manager.

Senior Safety Officer at EEI Corporation (Project - DUCC Expansion Project, Illang
  • Philippines
  • November 1994 to March 1996

Nov. 1994 - Mar. 1996 EEI Corporation (Project - DUCC Expansion Project, Illang, Davao City)

Position Senior Safety Officer
Job Description Responsible for preparation of Job Safety Analysis Reports, Job Safety bulletins, Toolbox Meeting subjects and auditing such meeting to ensure effectiveness, preparation of accident investigation reports and analysis, recommending penalties to safety violators and act as first aider when required. Reports directly to the Project Manager.

Senior Safety Officer at EEI Corporation
  • January 1994 to November 1994

Jan. 1994 - Nov. 1994 EEI Corporation (Project - Caltex Refinery)

Position Senior Safety Officer
Job Description Responsible for preparation of Job safety analysis reports, implementation of work permits, conducting accident investigation, analysing causes and formulates recommendations for corrective and preventive action, conducting safety indoctrination to all incoming personnel, preparation of toolbox meeting topics and implementation of existing safety rules and regulations in refinery. Reports directly to Construction Manager.

Senior Safety Officer at EEI Corporation
  • November 1992 to January 1994

Nov. 1992 - Jan. 1994 EEI Corporation (Project - Solid Cement Corporation, Antipolo Rizal)

Position Senior Safety Officer
Job Description Responsible for the preparation of job safety analysis reports, conducting daily survey of construction operations to ensure compliance with client's and government's safety standards and procedure, identifying safety defects and initiating corrective measures, preparing injury list reports, providing adequate documentation on safety inspections and occupational health monitoring activities and conducting safety orientation of new hires. Reports directly to Construction Manager.

Safety Officer at EEI Corporation
  • October 1990 to October 1992

Oct. 1990 - Oct. 1992 EEI Corporation (Project - National Steel Project)

Position Safety Officer
Job Description Responsible for monitoring Yard Keeping and Housekeeping activities and assisting job safety pre-planning of project proposals and all new equipment.

Education

Diploma, Occupation Health & Safety
  • May 2011

NEBOSH International Certificate in Occupation Health & Safety (Ecoman, Abu Dhabi, UAE, May 2011)

Bachelor's degree, Mechanical Engineering ( 4 years under graduate)
  • at Far Eastern University
  • January 1990

College - Bachelor of Science in Mechanical Engineering - Far Eastern University, 4 years under graduate

High school or equivalent, Management
  • at Sacred Heart Academy of Novaliches, Zabarte St
  • January 1984

High School - High School Diploma - Sacred Heart Academy of Novaliches, Zabarte St., Novaliches Quezon City, 1984. DUTIES & RESPONSIBILITIES * Supervises the day to day activities of operational HSE services to ensure that all personnel adhere to the Company's HSE Rules and Regulations and safe work practices. * Ensures implementation of safe systems of work by carrying out regular inspections in all operational areas. Highlights matters of concern with recommendations to the Management for corrective action. Follows up on implementation of recommendations. * Provides necessary advise and assistance in accordance to HSE Manual and other project specific requirements on all work locations to ensure work place safety to prevent accidents and loses. * Conducts daily routine inspection and highlights matters of concern with recommendations to the Management for corrective action. Follows-up on implementation of recommendations following Senior HSE Engineer's approval. * Assists in the development and implementation of fire and emergency prevention and management plans, policies and procedures in line with Corporate HSE Strategy. * Carries out on-site HSE induction programmes for all Company and sub-contractor personnel to ensure awareness of HSE requirements and standards. * Identifies and conducts various Fire and HSE Trainings while on work locations based on the Company's approved HSE Training Matrix. * Participates in all fire fighting and emergency incident activities in order to ensure that correct procedures are followed and risk to personnel and physical plant/equipment is minimized. * Conducts and coordinates investigations of incidents and assist in investigation of major incidents. Respond to Operational related emergencies and giving advise as required. * Ensures fire and emergency equipment is in place and maintained in optimum operating condition through regular servicing and maintenance schedules. * Assists the Lead HSE Engineer in the implementation of the Company's Health, Safety and Environmental Management System (HSEMS) * Identifies work hazards, their effects and implements risk reduction measures in relation to his area of responsibility and implements Departmental objectives. * Participates on HSE meetings on work location to discuss and resolve HSE issues prevailing on site. * Participates on Risk Assessment meetings for mitigating critical activities and ensure that these are properly communicated to both supervision and work force for NPCC and sub-contractors.

Specialties & Skills

Installation
DOCUMENTATION
ACCIDENT INVESTIGATION
AUDITING
ENGINEER
HOUSEKEEPING
INSPECTIONS
NEW HIRES
PROJECT MANAGER
PROPOSALS
SAFETY ANALYSIS

Languages

English
Expert

Memberships

WORL SAFETY ORGANIZATION
  • MEMBER
  • January 2005

Training and Certifications

NEBOSH CERTIFICATE (Certificate)
Date Attended:
May 2011
Valid Until:
June 2011