جورج ANDRONE, MAINTENANCE ENGINEER

جورج ANDRONE

MAINTENANCE ENGINEER

VALEO GROUP

البلد
رومانيا
التعليم
بكالوريوس, Electromechanic Engineer
الخبرات
29 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :29 years, 0 أشهر

MAINTENANCE ENGINEER في VALEO GROUP
  • رومانيا
  • أشغل هذه الوظيفة منذ أبريل 2015

2015-present as Maintenance Engineer for Valeo Thermal Systems
• Carry out Planned Preventative Maintenance (PPM) and commissioning to plant and equipment.
• Take part in the out-of-hours on-call rotation, attend sites in accordance to the contract response times and ensure all work carried out is completed in a timely manner, efficiently and to the highest of standards.
• Safely operate, maintain and repair Mechanical and Electrical plant and equipment including water, heating, cooling and ventilation systems.
• Carry out mechanical, electrical and plumbing diagnostic fault finding to plant, equipment and sanitary ware to identify causes and implement resolutions quickly and efficiently.

ELECTROMECHANIC ENGINEER LEAD في Kellogg Brown & Root Limited (KBR UK)
  • أفغانستان
  • يوليو 2011 إلى يناير 2015

2011-present as ENGINEER LEAD (electric&hvac departments)
Maintenance and construction in KAIA KABUL AFGHANISTAN
Whit KBR ENGLAND
Complete reactive and emergency breakdown tasks and all related paperwork to a number of client properties on a mobile basis as assigned.
•Supervise physical execution of electrical work by contractors based on the contractual documents, and reports to the Sr. Electrical Engineer for corrective action, in case any defaults occur.
• Coordinate sub-contractors within my area, monitor their performance and report any concerns.
• Safely operate, maintain and repair Mechanical and Electrical plant and equipment including water, heating, cooling and ventilation systems.
• Checks and recommends on approval of electrical materials and electrical sub-contractors/suppliers of projects in coordination with Senior Project Engineers, and reports to Sr. Electrical Engineer.
• Carry out mechanical, electrical and plumbing diagnostic fault finding to plant, equipment and sanitary ware to identify causes and implement resolutions quickly and efficiently.
• Actively communicate with clients to ensure any concerns are dealt with or report to Management if out of your line of responsibility.
• Identify additional works of improvement and upgrades within contracts and report directly to Management.
• Maintain all relevant documentation to the highest standard - Work Record Sheets (WRS), Summary and Overtime Sheets, expense claims, purchase card and fuel card returns.
• Keep the helpdesk updated on all allocated reactive works - collate and return weekly PPM sheets, on-going call-out details, site contract listings, site addresses.
• Provide detailed written service reports, ensure maintenance log books are clear and legible, report any non-compliant issues, assist in corrective actions, report accidents and near misses.
• Build and maintain strong relationships with Management and colleagues, attend and contribute to staff appraisals, mentor less experienced colleagues, maintain all personal and vehicle records.
• Carry out Planned Preventative Maintenance (PPM) and commissioning to plant and equipment.
• Take part in the out-of-hours on-call rotation, attend sites in accordance to the contract response times and ensure all work carried out is completed in a timely manner, efficiently and to the highest of standards.
Hvac new projects, maintenance and repair for more then 2000 air conditioner equipment’s different type :
- AHU(CARRIER/TRANE/YORK/GOODMAN)
- CHILLERS(YORK)
- REFERS CONTAINERS(FOOD)(CARRIER TRANSICOLD)
- VRF SYSTEMS(MITSUBISHI/LG/FUJITSU/ARCELIK)
- SPLIT&STANDING TYPE
- ROOF TOP (LENNOX AND OTHERS)

Electromechanic Engineer في P.A.E Baghdad
  • العراق - بغداد
  • أغسطس 2010 إلى أبريل 2011

2010-may2011 as Electromechanics Engineer
Maintenance and construction in the embassy USA in Baghdad IRAQ
ELECTRICAL INSTALLATION, Chillers, VENTILATION & HEATING,
My daily duties:
- supervise the activities of the building planned maintenance team and to ensure that the planned preventative maintenance tasks are carried out to the required quality standards.
- identify and diagnose faults and to carry out repairs, adjustments and other maintenance works as appropriate.
- carry out the required routine servicing, repair or adjustment of plant or machinery in accordance with the planned maintenance schedule as tasked by the Building Control coordinator.
- adopt a flexible approach in respect of other skills or trades to ensure the most cost effective completion of all tasks.
- control, monitor and update the building planned maintenance/access control systems.
- assist the Building Manager in the preparation of, and implementation of, the planned maintenance schedules for the required maintenance of all plant and equipment and to monitor accordingly. - assist the Building Services Manager with the monitoring and supervision of all maintenance/engineering activities.

- ensure that all service areas, plant rooms, inspection cupboards etc. are maintained in pristine condition at all times.
- assist the Building Services Manager with the inspection and testing of the fire and life safety systems.
- prepare schedules of all defects on plant, services, building structure etc. and to progress the necessary remedial action in liaison with the Building Services Manager.
- assist with the preparation of specifications and recommendations for works or modifications to existing services, plant and equipment as requested from time to time.
- thoroughly familiar and comply with the Company's &quota;Health & Safety quota; policy and procedures and to assist the Building Services Manager with the requirement
-liaison with the Building Services Manager, to progress recommendations on service and maintenance matters in order to ensure that Tenants gain maximum benefit from the building facilities and that they experience minimum disruption.
- responsibly available outside normal working hours to cover for emergency situations.
- organize and make easily accessible all service manuals, drawings, certificates and other documentation/records etc. relating to the building equipment and systems.
- ensure the accurate and timely completion of staff time/task sheets in accordance with procedures.
- carry out other reasonable duties as requested by the Building Services Manager & Building Manager
-IOSH Managing Safely
Analyze health of Electrical system/Equipments by tools, alarm sequences to predict Electrical Machinery behavior using on line records / physical measurements and will help/ guide Production team in reaching conclusions.
Also all Hvac new projects, maintenance and repair air conditioner equipments different types

ELECTROMECHANIC ENGINEER في RTR Project TITU ROMANIA
  • رومانيا
  • يناير 2010 إلى سبتمبر 2010

2010 engaged in electromechanical engineering function to achieve About Zeus-conditioning, electrical and ventilation installations within: - RTR Project TITU ROMANIA
* read the project documentation and make the materials calculation for the sanitary project: pipes -sanitary objects- valves -pumps and other materials
* verify the instalation for the sanitary project
* read the project documentation and make the materials calculation for the air conditioneer project: pipes-units -tubing and isolation
* verify the instalation for the air conditineer project
* read the project documentation and make the materials calculation for the air treatment project: waterchilled pipe-units-tubing -automatics for this
* verify the instalation for the air treament
* verify the instalation for fresh air and exhaust system
* coordonate the electricals teams for this project
* analyse health of Electrical system/Equipments by tools, alarm sequences to predict Electrical Machinery behavior using on line records / physical measurements and will help/ guide Production team in reaching conclusions.

chief technical officer AEROFRESHCLIMA Pitesti في AEROFRESHCLIMA
  • رومانيا
  • يناير 2007 إلى يناير 2010

2007-2010 hired as chief technical officer AEROFRESHCLIMA Pitesti
electrical installation and ventilation and air conditioning: - HOTEL Yaki Pitesti -coordonate the instalation for air conditioneer in the hotel and verify the pipe to be well instal and conform to the plan
- calculated the materilas for the project and for the type of instalated units Multi V type and the ventilation make measurements for this
- executing and verify the mechanics part for this project
-verify the execution of electrical instalation
-make the reception documents and provide to the owner

- SKODA SHOWROOM - make the calculation for type of units to be instal
-verify the subcontractor for instal the waterchilled pipe and pumps and all materials for the chillers
- check the sanitar instalation for this project to be conform to the documents and in the right position

- Typography TIPARG -make the calculation for materials and other for instaling duct type
-instal and verify the duct type and ventilation for this
- Mega Store TRIVALE Pitesti - instal and mentenance for 3 units Multi V type and other duct systems
-ROMANO-AMERICANA BUCHAREST UNIVERSITY -calculation, instalation for 2 units Multi V and 3 units duct type and the ventilation
-Rafinery Pitesti
analyse health of Electrical system/Equipments by tools, alarm sequences to predict Electrical Machinery behavior using on line records / physical measurements and will help/ guide Production team in reaching conclusions.

achieve no down time due to Electical system/Equipments failures.
co-ordinate on day to day basis with Production Department regarding scheduled and unscheduled maintenance jobs and Plant priorities to ensure continuity of Plant Operations

Rafinery Pitesti- ELECTRICAL OFFICER في OIL & GAS
  • رومانيا
  • يناير 2007 إلى يناير 2010

OIL & GAS experience
-Rafinery Pitesti- ELECTRICAL OFFICER -2007-2010
analyse health of Electrical system/Equipments & HVAC by tools, alarm sequences to predict Electrical Machinery behavior using on line records / physical measurements and will help/ guide Production team in reaching conclusions.

achieve no down time due to Electical system/Equipments & HVAC failures.
co-ordinate on day to day basis with Production Department regarding scheduled and unscheduled maintenance jobs and Plant priorities to ensure continuity of Plant Operations

Team Leader في PIC HyperMarket
  • رومانيا
  • يناير 2002 إلى يناير 2007

2002-2007 employee in the position of electrician in the companny Selco Pitesti
Electrical installation and automatisation Team Leader within projects: 1. PIC HyperMarket: - read the electrical plans and working on automatisation for generators& automatic power reserve
- execute electric instalation for lighting and usual socket
- making the automatisation panel for the termal plant
- conected the transformer 250KVA&400kva
- coordonate the electricians teams for achivment of this project
2. MPOR-Pitesti
- read the electrical plans and working on automatisation for generators& automatic power reserve
- execute electric instalation for lighting and usual socket
- coordonate the electricians teams for achivment of this project
3. Shop Plus Pitesti -air conditioneer install
4. SHOWROOM Valcea Dacia-Renault
5.Petrochemical Plant Pitesti
-coordonate the electrical teams for pyrolysis departament

ELECTRICAL FOREMAN في SELCO PITESTI
  • رومانيا
  • يناير 2001 إلى يناير 2007

- Petrochemical Plant Pitesti-ELECTRICAL FOREMAN 2002-2007- -coordonate the electrical teams for pyrolysis departament for all new modernization in this sector

ELECTRICIAN في Pitesti Petrochemical Plant
  • رومانيا
  • يناير 2000 إلى يناير 2002

- Pitesti Petrochemical Plant - ELECTRICIAN -2000-2002
-working in ammonia departament for boilers modernization

ELECTRICIAN في ARGECOM SA
  • رومانيا
  • يناير 2000 إلى يناير 2001

2000-2002 engaged in the electrical function ARGECOM SA Pitesti
Electrical installation and automation
In: 1. Pitesti University project: - read the electrical plans and working on automatisation for generators& automatic power reserve
- execute electric instalation for lighting and usual socket
2. Thermal Plant Topoloveni: - coordonate the plans for achivment the pumps automatisation
- making the automatisation panel for the termal plant
- conected the transformer 100KVA
3. Pitesti Petrochemical Plant: -working in ammonia departament for boiler modernization

ELECTROMECHANIC TECHNICIAN في DACIA PITESTI
  • رومانيا
  • يناير 1995 إلى يناير 2000

1995-2000 employed at Dacia Pitesti pressed in diverse positions: galvanized, pressed, setter

الخلفية التعليمية

بكالوريوس, Electromechanic Engineer
  • في State University of Pitesti
  • يوليو 2009
الثانوية العامة أو ما يعادلها, computer operator
  • في HIGH SCHOOL AL.ODOBESCU
  • يوليو 1990

Specialties & Skills

Electrical Engineering
Construction Knowledge
Maintenance Engineering
MAINTENANCE MANAGEMENT
CHILLERS
ENGINEER
GENERATORS
LIGHTING
MAINTENANCE
OPERATIONS
TRAINING

اللغات

الانجليزية
متمرّس
الفرنسية
متوسط
الايطالية
متوسط

التدريب و الشهادات

STATIC BOOM AND FORKLIFT (الشهادة)
تاريخ الدورة:
August 2012
صالحة لغاية:
August 2017
mobile towers (PASMA) (الشهادة)
تاريخ الدورة:
August 2012
صالحة لغاية:
August 2017

الهوايات

  • TRAVEL AND TECHNICAL
    I VISIT 10 EUROPE COUNTRYS AND SHARE MY KNOWLEDGE AND IDEAS WITH OTHER PEOPLES