جورج Ibrahim,  Area planning manager

جورج Ibrahim

Area planning manager

EHAF

البلد
مصر - القاهرة
التعليم
الثانوية العامة أو ما يعادلها, Civil
الخبرات
18 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 7 أشهر

Area planning manager في EHAF
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ نوفمبر 2019

Projects of New Capital area.
 Arab Investment Bank project (contractor: Soaada Group)
 Industrial Development Bank project (contractor: GAMA)
 Arab International Bank project (contractor: El SHOROUK)
 Pukka (residential project).

Job Tasks:
• Review the Preparation of the integrated Project Management Plan, and Master sub-plans.
• Reviewing and comment for incoming Schedules baselines from contractors.
• Reviewing and comment for incoming Schedules updates from contractors.
• Reviewing daily, weekly and monthly reports which submitted from contractors and verifying consistency with previous reports to ensure compatibility.
• Reviewing and verifying productivity analysis of construction operations.
• Reviewing and comment schedule resource loading, leveling and schedule crashing.
• Conducting weekly progress meetings, as well as technical and coordination meetings amongst main stakeholders (Project Manager, consultant, contractor), as necessary.
• Responsible for issuing and presenting required reports by Top Management.
• Provides supervision and assistance to planners in the development and integration of individual schedules into the total project plan.
• Recommends alternatives for schedule improvement to project team for discussion and/or decision

engineering project controls manager في Orascom Construction Limited
  • مصر - القاهرة
  • أغسطس 2018 إلى يوليو 2019

Project: Transferring Raw Water from Nile to New capital (consortium project)/ Head Office - (EGP 29 Billion).

Job Tasks: (Till now the project is hold according to delay in advance payment)  Review the Preparation of the integrated Project Management Plan, and Master sub-plans.  Calculating and reviewing with top management resources needs (Formwork - Equipment)  Conducting and preparing with top management Tender Schedule with Primavera and Tilos

Planning Manager في Orascom Construction Limited
  • مصر - مرسى مطروح
  • مارس 2019 إلى يوليو 2019

Projects : AL MASSA Al-Alamein Hotel - (EGP 10 Billion).


Job Tasks:  Preparing commissioning baseline schedule for of all buildings.  Preparing and reviewing baseline schedule for cap floor building.  Monitoring the performance of Contractor(s) using Primavera updates, excel spreadsheets and Photos monitor sheet.  Review & Supervises schedule resource loading.  Preparing recovery schedule for steel work of cap floor. Reviewing and submitting weekly/monthly Progress Reports to the client.  Reviews and evaluates schedule durations for all activities relative to the support of project milestones.

Project controls manager في Orascom
  • مصر - مرسى مطروح
  • نوفمبر 2017 إلى يوليو 2018

Project Controls Department
Projects : Al Alamein Hotel Refurbishment - (EGP 700 Million).
Job Tasks:
* Review the Preparation of the integrated Project Management Plan, and Master sub-
plans.
* Conducting weekly progress meetings, as well as technical and coordination
meetings amongst main stakeholders (Project Manager, consultant, contractor), as
necessary.
* Performs and/or coordinates, collects, verifies, and integrates the work scope for all
entities into the total project plan. Reviews the representation of project scope in
schedules, Prepares and analyzes comparisons of scope.
* Performs productivity analysis of construction operations and verifies.
* Reviews and evaluates schedule durations for all disciplines activities relative to theproject milestones.
* Review & Supervises schedule resource loading, leveling and schedule crashing.
* Verifies consistency with previous reports to ensure compatibility.
* Responsible for issuing reports required by Project Manager & Top Management.
* Supports development of scheduling standards and procedures.
* Preparing a compensable claim (Time & Cost) using window analysis method.
* Preparing a mitigation schedules.
* Monitoring the performance of Contractor(s) using Primavera updates, excel
spreadsheets and Photos monitor sheet.
* Preparing trend analysis for the overall project and each area using “SPI”.
* Preparing PowerPoint presentations for Top management meetings.
* Reviewing Weekly Progress Reporting to the client.
* Work assignment to the Project and office support staff.
* Provides supervision and assistance to planners in the development and integration of
individual schedules into the total project plan.
* Recommends alternatives for schedule improvement to project team for discussion
and/or decision.

Planning Team Leader في Orascom
  • مصر - الغردقة
  • مارس 2017 إلى أكتوبر 2017

Project Controls Department
Projects : Wind Farm Project - Power Generation Business Unit
Job Tasks:
* Review the Preparation of the integrated Project Management Plan, and Master sub-
plans.
* Conducting meetings, as well as technical and coordination meetings amongst main
stakeholders (owner, consultant(s), contractor(s)), as necessary.
* Performs Tender Schedule to show time frame for executing this project.
* Performs and/or coordinates, collects, verifies, and integrates the work scope for all
entities into the total project plan. Reviews the representation of project scope in
schedules, Prepares and analyzes comparisons of scope between original scope and any
changes on scope.
* Reviews Subcontractors Schedules to match construction baseline.
* Performs and Supervising for Construction baseline Schedule.
* Performs productivity analysis of construction operations and verifies.
* Reviews and evaluates schedule durations for all disciplines activities relative to the
support of project milestones.
* Responsible for issuing reports required by Project Manager & Top Management.
* Supports development of scheduling standards and procedures.

Senior Planning Engineer في Orascom
  • مصر - القاهرة
  • أبريل 2012 إلى فبراير 2017

Project Controls Department
Projects : Grand Heights projects-3 phases (Infrastructure - Villas C1- Villas C2)
(EGP 700 Million).
Job Tasks:
* Review the Preparation of the integrated Project Management Plan, and Master sub-
plans.
* Conducting weekly progress meetings, as well as technical and coordination
meetings amongst main stakeholders (owner, consultant(s), contractor(s)), as
necessary.
* Performs and/or coordinates, collects, verifies, and integrates the work scope for all
entities into the total project plan. Reviews the representation of project scope in
schedules, Prepares and analyzes comparisons of scope and quantities.
* Performs productivity analysis of construction operations and verifies.
* Reviews and evaluates schedule durations for all disciplines activities relative to the
support of project milestones.
* Review & Supervises schedule resource loading, leveling and schedule crashing.
* Verifies consistency with previous reports to ensure compatibility.
* Responsible for issuing reports required by Project Manager & Top Management.
* Supports development of scheduling standards and procedures.
* Contract Administration.
* Monitoring the performance of Contractor(s) .
* Reviewing Monthly Progress Reporting to the client.
* Work assignment to the Project and office support staff.
* Provides supervision and assistance to planners in the development and integration of
individual schedules into the total project plan.
* Recommends alternatives for schedule improvement to project team for discussion
and/or decision.

Planning Engineer في Orascom Housing Communities
  • مصر - القاهرة
  • مايو 2010 إلى مارس 2012

Project : Three public schools in Haram City (Adoption of schedules from Educational
Buildings Authority).
Job Tasks:
* Responsible for developing the detailed schedules for the Engineering, Procurement
and Construction phases of the project.
* Reviewing contractors’ schedules; compiling, updating, and analyzing project’s
master schedule.
* Establishes milestones for the total project or major portions of the project.
* Evaluates schedule durations for all disciplines activities relative to the support of
project milestones.
* Prepare the schedule resource loading and leveling. Determines quantity and
manpower levels in support of the project needs and schedule philosophy.
* Preparing cost and time estimates for potential variations and time extensions.
* Prepare Monthly Progress Reports.
* Monitors and reports the critical path and schedule performance of the total project.
* Performs project schedule analysis and studies of problem areas to determine
criticality of schedule activities.
* Responsible for preparing and presenting the Schedule Impact Report.
* Responsible for leading the development and review of schedule recovery plans,
including evaluation of additional resources / costs required to affect such plans.

Cost Control Engineer في Orascom Housing Communities
  • مصر - القاهرة
  • مايو 2008 إلى أبريل 2010

Project :Haram City
Job Tasks:
* Responsible for making the detailed invoices for the subcontractors of the project.
* Preparing bi-weekly the cost report and distribute it for all managers.
* Prepare the forecasted budget and cash flow for the project.
* Review the prices for contract renewal in yearly bases.

Site Engineer
  • أكتوبر 2007 إلى أبريل 2008
Planning Engineer
  • يوليو 2007 إلى سبتمبر 2007
في Head office
  • الإمارات العربية المتحدة
  • يناير 2007 إلى يونيو 2007

Tasks:
* Making tender schedules for four shops in Carfour Elmaadi.
* Making tender schedule for ATLANTIC GROUP factory in 10th of Ramadan city.
* Making tender schedule for EL- AHRAM Beverages company in (EL-Obour).
* Making tender schedule for EL- Merdian hotel in (EL- Haram st.).(Adoption of the
schedule from ECG

Site Engineer في Plastering
  • الإمارات العربية المتحدة
  • يوليو 2005 إلى ديسمبر 2006

Project : Kuwait Diplomatic Head Quarter (20 million $)
Job Tasks:
* Responsible for executing Masonry works .
* Responsible for executing

Project في EL-Merdian hotel in (EL-Haram s
  • إلى

Responsible for construction of Mobilization Area for consultant.
* Responsible for Excavation and concrete casting of Diaphragm wall at level -18 m.
* Responsible for testing viscosity of Bentonit to avoid failure of excavation.
* Responsible for construction of berlin wall at level -4 m.
* Responsible for executing Soil injection for layer has thickness 2.7m at level -10m
with (cement + Jel).
* Responsible for executing the reinforcement anchors has tall 30 m with angel 45º .
* Responsible for installation the struts to support the diaphragm wall from failure when

Planning Engineer
  • إلى

Project : Kuwait Diplomatic Head Quarter (20 million $)
Job Tasks:
* Following up the project time schedule.
* Prepare Monthly Progress Reports.
* Monitor and reports for the critical path and schedule performance of the total project.
* Responsible for preparing and presenting the Schedule Impact Report.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Civil
  • في ZAGAZIG University
  • مايو 2005

Specialties & Skills

CONSULTING
CUSTOMER RELATIONS
MEETING FACILITATION
MICROSOFT OFFICE
PRESENTATION SKILLS
PROGRESS
PROJECT MANAGEMENT
REPORTS
SCHEDULING

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
متمرّس