Work Experience

Total years of experience :26 years, 9 Months

Coordinator & Senior Architect at “EEGMA” Egyptian Engineering Group For Consultancy.
  • Egypt - Cairo
  • My current job since December 2008

*Project:Development of Sharm El-Sheikh Int. Airport(TERMINAL 3)
POSITION:Coordinator&representative for EEGMA in coordination&tech.meetings.
Job duties:(same as the previous project but with the new partners such as):
-PROINTEC(J.V.Leaders&designer for aeronautics items&terminal building systems-SPAIN).
-GOP(Designer for the concept of Arch.&Interior items-SPAIN).
-EEGMA(Main Coordinator&Developer for the Design concept of Arch.l&Interior items).-ACO(Struc.), KEP(MEP)
*Project:(APM)(Automated People Mover)@Cairo Int.Airport.
POSITION:Coordinator&representative for EEGMA in meetings.
Job duties:
-Representative for EEGMA in coordination&tech.meetings with other parties such as:
Main contractor J.V.“POMA /AL-MARASEM(BINLADIN GROUP)”
MEP designer“ALLIED”, struc.designers, Roads designer.etc.
-Follow up the updating of the arch.dwgs&their submissions.
-Follow up the quality control for the arch.&interior dwgs of the project.
-Preparing&follow up the correspondences&communication with other parties.
-Preparing the related documents such as dwg lists, status reports&MOMs.
*Project:(KAEC)(King Abdullah Econnomic City)BAY LA SUN VILLAGE 2.
(Project elements:16 No.Residential towers including their commercial areas, podium,
swimming pools&landscape..etc)
Owner:EMAAR Project management: TURNER
Owner consultant: Zuhair Fayez partnership consultants.
Contractor:Saudi Binladin Group Design Management:Al-Marasem.
Contractor design team:J.V.\[EEGMA(ARCH.)-SHAKER Consultancy Group(MEP)-IETC(STR.)\]
POSITION:Coordinator&representative for EEGMA in coordination&technical meetings.
Job duties:
- Representative for EEGMA in coordination&tech. meetings with other parties.
- Arch. team leader&quality controller for the submitted dwgs.
- Follow up the updating &quality control of arch.dwgs&their submissions.
- Preparing&follow up the correspondences&communication with other parties.
- Preparing the related documents such as dwg lists, status reports& MOMs.

Senior of shop drawing department. at “NG design office” Cons. Arch.PhD./NADER A.GOUBRAN(Architects - Planners Consulting Office).
  • Egypt - Cairo
  • December 2007 to December 2008

* Project:(MÖVENPICK RESORT) SOMA BAY-SAFAGA ( 5 STAR RESORT)
POSITION: Senior of shop drawing department.
Job duties including:
1. Making working & shop drawings of the project.
2. Sharing in meetings with other parties(MEP&civil consultants, interior designer..etc)

Senior Architect / coordinator & Site Manager at “LIVING IN INTERIORS”
  • Egypt - Cairo
  • June 2006 to December 2007

* Project:(Mr/B.GHABOUR'S VILLA)(MIRAGE CITY).
POSITION:Senior Architect.
* Project:(Mr/Y.SHAMSI'S VILLA)(LAKE VIEW).
POSITION:Senior Architect.
* Project:(LIVING IN INTERIORS NEW OFFICE BUILDING)(KATTAMEYA).
POSITION:Senior Architect & Main coordinator.
* Project:(Mrs/MERVAT MALATY'S VILLA)(KATTAMEYA HEIGHTS)
Project cost:16 000 000 LE.
POSITION: Site Manager

Project Manager/ Site Manager at “MAGNUM INTERPRISE” Medhat Abdalla & Partners.
  • Egypt - Cairo
  • April 2003 to June 2006

* Project: (PIRAEUS BANK) (Roxy Branch)
(Project cost 800 000 L.E.) POSITION: Project Manager
* Project: (NILE CITY-North tower, 30th floor) (Sheikh Fahed El-Shebokshy's Headquarters)
(Project cost 250 000 L.E.) POSITION: Project Manager
Job duties including :
1. supervision all items such as building reinforced hollow block walls(according to
BESIX-ORASCOM Co. spec.s), fair face screed, gypsum board partition & cladding,
false ceiling, moquette, paints ..etc.
2. Making the B.O.Q.s.
* Project: (EL-NADA PALACE RENOVATION)
(The RESIDENCE of KING HAMAD IBN ESSA-THE KING OF BAHRAIN KINGDOM-in CAIRO)
(Project cost 1 450 000 L.E.) POSITION: Site Manager
Job duties including supervision all items of finishes.
* Project: (EL-KHAN FLOATING RESTAURANT)
(Project total cost 18000000 L.E., Interior items cost 3000000 L.E.)
POSITION: Site Engineer, Job duties including supervision all items of finishes such as:
Walls (Wooden, ceramic & gypsum board claddings), ceilings(timber, gypsum &M.F.tiles),
Floors(marble, wooden, ceramic & moquette), paints & elec.outlets...etc & B.O.Q. of them.
* Project: RESIDENTIAL VILLAS at Amman Sq.- El-Mohandessin.
POSITION: Site Engineer, Job duties including supervision all items of finishes such as:
Brick work, metal lath for false ceilings, plaster, marble cladding for floors & stairs, ceramic
cladding, joinery(subframes, frams & wooden doors), plumbing & elec.outlets...etc & B.O.Q.

Designer & Site engineer at “ Inspiration Interiors ”
  • Egypt - Cairo
  • February 2002 to April 2003

POSITION: Job duties including:
1. Making designs, shop drawings, presentation dwgs & sample boards using computer.
2. Supervision on craftsmen such as(carpenters, painters, smiths..etc)including visiting
workshops, follow-up stages of manufacturing & finish.
3. Follow-up installation of furniture such as (bookcases, kitchens, bedrooms, dinningrooms
....etc.) in sites.
4. Follow-up time schedule of work.

Technical office engineer at “MEDEQUIP for Trading & Contracting Co.” LAKAH GROUP
  • Egypt - Cairo
  • April 1999 to January 2002

POSITION: Designer at “ The Design & Technical Office ”of company, projects in brief:
1-(LOUXER INTERNATIONAL HOSPITAL)
2-(EL-SALAM HOSPITAL)- EL-SALAM CITY.
3-(CAIRO MEDICAL TOWER)-GIZA.
4-(EL-MOWASA HOSPITAL) -ALEX.
5-(EL-SUZE HOSPITAL)-SUZE.
6-(EMEIC)-GIZA.
7-(DR\ ADEL EMAM RESIDENCE)-GIZA.

Technical office engineer at Architectural Dept. of (ENGINEERING OFFICE) at “C.C.I.C. joint venture with ORASCOM” CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY(J.V. LEADERS) &
  • Egypt - Cairo
  • January 2001 to August 2001

Part time
• Project: "CITY STARS" - "GOLDEN PYRAMIDS PLAZA." HELEOPLIS-CAIRO
POSITION: Shop drawings & details designer & (AutoCAD operator) at Architectural Dept. of (ENGINEERING OFFICE)
Refer to attached CV & experience certificate

Interior Designer & Coordinator at “Atef Ayoub Consulting Office”
  • Egypt - Cairo
  • August 1997 to April 1999

Since August 1997: April 1999
1-Project: (HOLIDAY INN) CROWNE PLAZA-SHARM EL-SHEIKH-( 5 STAR RESORT)
(OWNER: M.ABOU GHALI, INTERIOR DESIGNER: D.WRENN)
POSITION:
a) Representative (coordinator) in meetings between the Office, owner, interior
designer, consultants & contractors.
b) Decorative samples Collector & sample boards maker.
c) Making B.O.Q. (Bill of Quantity) for:
-Loose furniture of guestrooms.
-Tiling works of guestrooms & suites.
- Sanitary fixtures.
-Arches & ceiling coffers of main building.
d) Making tender schedule of loose furniture including:
(Size of each item, wood type & finish, accessories…etc)
e) Document Controller.
2-Project: (ZAHABIA) resort - HURGADA. (EL-KHAN) RESTAURANT.
POSITION: Furniture designer & making furniture shop drawings using computer.
3-Rendering drawings with airbrush & computer.
5-Taking measurements for some shops & apartments.

Education

Bachelor's degree, Interior Architecture
  • at Faculty of Fine Arts- Interior Architecture Department
  • July 1997

•From 1992 Till 1997: Faculty of Fine Arts - Helwan university. Degree received: B.Sc. Major: Interior Architecture. Project: A 5 star hotel. Grade: Good.

Specialties & Skills

Interior Architecture
Interior Design
Coordination
Project Engineering
Design Consultancy
AUTO CAD
ADOBE PhotoShop
EXCEL & WORD
INTERIOR DESIGN
SHOP DRAWINGS

Languages

Arabic
Expert
English
Expert
French
Beginner