Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
George Mathew, Senior Electrical Engineer

George Mathew

Senior Electrical Engineer·QPM

Qatar

Bachelor's degree, Bachelor Degree (Electrical)

Work experience

Total years of experience: 13 years, 10 months

Senior Electrical Engineer

January 2024 - August 2024

QPM

Al Wakrah, Qatar

January 2024 - August 2024

Secondment to Barwa Project

Company industry:
Management Consulting

Senior Electrical Engineer

January 2024 - August 2024

QPM-

Al Wakrah, Qatar

January 2024 - August 2024

• Additional Site Observations & Major Issues.

Company industry:
Management Consulting

Assistance Designer Site Representative

January 2015 - January 2022

Arcadis,

Doha, Qatar

January 2015 - January 2022

The project is located to the west and north of the Doha city and will provide a new road between Salwa Road and North Relief Road, it consists of 10-lane section (5 in each directed) with four truck lanes with seven interchanges 40 no. 11 kV substation, 66 &11 kV diversions, 400 & 220 kV OHL Tower line relocation, 43 km High mast / Street light installation, Plant Room in Tunnel’s MEPF( 11 kV Distribution, Disel Generator and power transformer, Tunnel Lighting system including Day and Night time lighting and emergency lighting, Fire Alarm and detection system within the Tunnel and plant room building, Plant Room building Lighting, small power and containment system, Earthing and Bonding of Tunnel, Lighting Protection of the Plant Room Building. .

Company industry:
Business Consultancy Services

Assistant Resident Engineer

January 2010 - January 2015

Arcadis Consulting Middle East

Lusail, Qatar

January 2010 - January 2015

Lusail development Primary Infrastructure CP2 is a project consists of two (2) no. 66 kV sub-stations (which include 66 kV 40 MVA six no. Transformer, GIS installation, 80 no. 11 kV outgoing feeder, 31 no. 11 / .433 kV distribution substation, 5 km EHV underground utility, 20 km underground utilities for HV and LV, 5 km of street lighting and 2000 l/s and head 13-meter one no. pumping station.

Company industry:
Management Consulting

Assistance Resident Engineer

January 2010 - January 2015

Arcadis,

Lusail, Qatar

January 2010 - January 2015

Lusail development Primary Infrastructure CP2 is a project consists of two (2) no. 66 kV sub-stations (which include 66 kV 40 MVA six no. Transformer, GIS installation, 80 no. 11 kV outgoing feeder, 31 no. 11 / .433 kV distribution substation, 5 km EHV underground utility, 20 km underground utilities for HV and LV, 5 km of street lighting and 2000 l/s and head 13-meter one no. pumping station.

Company industry:
Business Consultancy Services

Asst. Resident Electrical Engineer

January 2008 - January 2009

Arcadis

Doha, Qatar

January 2008 - January 2009

Diversion of Existing Underground Utilities from the premises.
Diversion of 66/11 kV cables, Relocation of 11 kV substation

Company industry:
Business Consultancy Services

Asst. Resident Engineer

January 2008 - January 2009

Hyder Consulting Middle East Ltd.-

Doha, Qatar

January 2008 - January 2009

Project: (Infrastructure)
Project Description: Diversion of Existing Underground Utilities from the premises.
Diversion of 66/11 kV cables, Relocation of 11 kV substation
Client Name:
Project Value: 20 million QR
Responsibilities:
• Official representative of BARWA to KAHRAMAA for 11 kV and 66 kV
works.
• The profiles, material submittal for 11 & 66 kV works were reviewed and
recommended to Kahramaa thereafter got approved without resubmission.
• Submitted System Outage schedules and arranging meeting with
Kahramaa for major Shutdowns of 11 kV and 66 kV works.
• Supervised the installation, testing and commission of EHV (66 kV LPOF
cables), HV (11kV) Cables.
• Supervised the installation of 11 kV Substation.
• All jobs like As-Built drawings submissions, Scrapped material deliveries,
and Kahramaa inspections were triggered at correct time.
• Produce Close Out document in Kahramaa reflecting all the Electrical
works being completed 100 % by the Client so as to obtain Clearance
Certificate with two three rounds of meeting, achieved Clearance Certificate
from Kahramaa and throughout maintained ISO standards in Kahramaa.

Company industry:
Business Consultancy Services

Education

Electrical Engineering

June 1992

June 1992

Bachelor's degree, Bachelor Degree (Electrical)

India

GPA (percentage): 60%

GPA (percentage): 60%

Skills

Electrical
Expert
Electrical
Expert
Electrical
Expert
Electrical
Expert
COMPUTER AIDED DESIGN
Intermediate
COMPUTER AIDED DESIGN
Intermediate
CONSTRUCTION
Intermediate
CONSTRUCTION
Intermediate
CONSULTING
Intermediate
CONSULTING
Intermediate
ELECTRICAL ENGINEERING
Intermediate
ELECTRICAL ENGINEERING
Intermediate
EMERGENCY SHUTDOWN
Intermediate
EMERGENCY SHUTDOWN
Intermediate
ENGINEERING DRAWINGS
Intermediate
ENGINEERING DRAWINGS
Intermediate
FACILITIES ENGINEERING
Intermediate
FACILITIES ENGINEERING
Intermediate
GRAPHIC DESIGN
Intermediate
GRAPHIC DESIGN
Intermediate
MICROSOFT OFFICE
Intermediate
MICROSOFT OFFICE
Intermediate
QUALITY PROCEDURES
Intermediate
QUALITY PROCEDURES
Intermediate

Languages

English
Beginner
Hindi
Beginner
Malayalam
Beginner

Training and Certifications

Certifications
Qatar Driving Licence – Valid
UPDA-Grade A – Licence # 1332