Construction Manager
مجموع سنوات الخبرة :22 years, 11 أشهر
Schedule the project in logical steps and budget time required to meet deadlines.
Determine labor requirements and dispatch workers to construction sites.
Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner.
Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.
Obtain all necessary permits and licenses.
Direct and supervise workers.
Study job specifications to determine appropriate construction methods.
Requisition supplies and materials to complete construction projects.
Develop and implement quality control programs.
Confer with supervisory personnel, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.
Plan, organize, and direct activities concerned with the construction and maintenance
of structures, facilities
Jubail Bulk Plant - Jubail, Saudi arabia
Responsibilities:
All Mechanical and Electrical construction activities
Materials take off for the project
Reviewing drawings and submitting queries
Planning and coordinating with the client
Under and above ground piping installation and testing
Equipment installation and alignment
Fire water protection system installation and testing
HVAC system installation and testing
All electrical activities installation and testing
Commissioning and handover for client
All construction activities related to mechanical scope
Underground and aboveground piping installation and testing
Equipment erection and alignment
Welding activities
HVAC system installation and testing
Fire protection system installation and testing
Planning and coordinating with client
Commissioning and handover
HVAC System installation (Ducts, AHU’s Chillers, Fans, ETC ...)
Plumbing installation
Fire Protection System installation
Logistics and planning
Client: JACOBS ZATE
Responsibilities:
HVAC system installation (Ducts, AHU’s, Chillers, and all accessories). \
Fire Protection system installation
Planning and preparing look ahead schedule.
Jubail Export Refinery Project, Saudi Arabia.
Client:
Nesma & Partners
Client:
SNC lavaline /Saudi Aramco
Responsibilities:
Process piping hydro testing and flushing
Process piping reinstatement
Steel structure erection, (Ground Flare fence, platforms, pipe racks, etc….)
Installation of underground and aboveground FRP/RTR pipes.
Supervising the construction teams and opening work fronts for them.
Process piping hydro testing.
Construction equipments maintenance and repair.
Lifting plans for heavy equipment and rigging for installation
in CCR (continuous catalyst regeneration) project, PDH Al Faseel, Yanbu, Saudi Arabia.
Client:
Technip/Natpet
Responsibilities:
Process structure erection
Process piping hydro testing
Process piping reinstatement
Electrical and instrumentation works
Supervision of construction teams
Technip/Saudi Aramco
Responsibilities:
Steel Structure erection (platforms, pipe racks, etc...)
Installation and alignment of static and rotary equipments (vessels, pumps, tanks, compressors, etc…)
Installation of internal trays for vessels and columns.
Supervision of construction crews and work fronts arrangements
Lifting plans for heavy equipments and rigging for installation
Client:
Saudi Aramco
Responsibilities:
Installation of distribution panels and breakers including lighting fixtures and alarm system, conduiting, wiring, testing of high voltage cables.
Process piping hydro testing
Process piping reinstatement
Site supervision
Client:
ACBI/Saudi Aramco
Responsibilities:
Hydro torquing of high pressure bolted joints utilizing hydro-pneumatic torque machines and manual wrench.
Hydro testing of valves including body and seat testing.
Hydro testing of piping systems.
Calibration of various test gauges and relief valves.
Electrical, electronic and mechanical repair works on various machines, tools, and measuring devices.
: Technical Electronics,
: