Ghazanfar Abass,

Ghazanfar Abass

Yambo Refinery (ARAMCO)

Location
Pakistan
Education
Bachelor's degree, Mechanical piping supervisor
Experience
8 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :8 years, 7 Months

at Yambo Refinery (ARAMCO)
  • February 2014 to October 2014

Yambo Refinery (ARAMCO)
Raw Water Pipeline Network Project From 02, Feb, 2014 to 15, May, 2014

Yambo
Saudi Arabia

Piping Supervisor at DESCON
  • United Arab Emirates
  • January 2014 to October 2014

14 Abu Dhabi Oil Refinery (TAKREER) Umal Nar Project no 1327 Process units (U.A.E) from 28, Dec 2009 to 27, March 2010 Mussafah United Arab Imarets (ADNOC) DESCON Piping Supervisor

at Fertil Debotling Project
  • January 2009 to October 2014

Fertil Debotling Project, and Shutdown 2009 from 01, April, 2009 To 30, Aug, 2009.

Rawais
United Arab Imarets
(ADNOC)

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • January 2013 to December 2013

13 GASCO Habshan-Train ii shutdown from Feb, 2010 To March, 2010 . Rawais United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Piping Supervisor at New Horizon Co
  • April 2013 to May 2013

New Horizon Co
Piping Supervisor

2 Qatar Petroliam (QP) Refinery 1 & 2 Major Shutdown9, April, 2013 25, may, 2013 Mesaeed QATAR DESCON Mechanical Supervisor

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • February 2013 to February 2013

3 Stream 1, 2 Overall Turnaround. DOLFIN Energy from 01, Feb, 2013 To 28, Feb, 2013. Rasalffan QATAR DESCON Mechanical Supervisor

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • January 2012 to December 2012

12 FERTIL Turnaround, from May, 2010 To June, 2010 Rawais United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • September 2012 to October 2012

4 Shut Down QATAR Gas QG II Train 4 & 5 and SRU 4 & 5 from Sept, 09, 2012 To Oct, 14, 2012 Rasalffan QATAR DESCON Mechanical Supervisor
5 RRE Project Takree (ADNOC) DEWOO Project UAE 27, May, 2012 To 30, Augusr, 2012 DESCON Piping Supervisor
6

at Das Island
  • March 2012 to May 2012

ADGAS Shut Down Train II & Boiler 3, 4 from March, 24, 2012 to May 25, 2012

United Arab Imarets
(Das Island)

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • January 2012 to March 2012

DESCON
Mechanical Supervisor (CWS/CCTV)

7 Bechtel Warranty Shut Down 0f GASCO ASAB 1 & 2 from Jan, 2012, To March, 2012 ASAB United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Piping Supervisor at RRE Project Takree (ADNOC) DEWOO Project UAE
  • April 2011 to January 2012

8 RRE Project Takree (ADNOC) DEWOO Project UAE 23, April, 2011 to 15, january, 2012. DESCON Piping Supervisor
9

at Das Island
  • March 2011 to April 2011

ADGAS Shut Down Train II & Boiler 3, 4 from March, 24, 2011 to 20, April, 2011.

United Arab Imarets
(Das Island)

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • January 2011 to February 2011

DESCON
Mechanical Supervisor (CWS/CCTV)

10 Stream 2 Turnaround. DOLFIN Energy from Jan, 2011 To, Feb, 2011 Rasalffan QATRA DESCON Mechanical Supervisor

Mechanical Supervisor at TAKREER Oil Refinery
  • January 2010 to December 2010

11 TAKREER Oil Refinery Condensate and Gasoline Shutdown from Octo 2010, To, Dec, 2010. Rawais United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • September 2009 to December 2009

15 ADGAS Shut Down Train iii and Boiler 5 & 6.from Sep, 2009 To Dec, 2009 United Arab Imarets (Das Island) DESCON Mechanical Supervisor
16

Mechanical Supervisor at TAKREER Oil Refinery
  • February 2009 to April 2009

18 TAKREER Oil Refinery (Umal Nar) Overall Turnaround 2009 from10, Feb, 2009 To April, 2009. Mussafah United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Commissioning/Piping Supervisor at DESCON
  • United Arab Emirates
  • March 2008 to February 2009

19 ASAB Gas Development Project UAE 05, March, 2008 to 05, Feb, 2009 DESCON Commissioning/Piping Supervisor

Eruct ion Supervisor at DESCON
  • United Arab Emirates
  • August 2008 to November 2008

DESCON
Eruct ion Supervisor ( Construction)

17 ADGAS Shut Down Train ii and Boiler 3 & 4 from Aug, 2008 To Nov, 2008. United Arab Imarets (Das Island) Mechanical Supervisor (CWS/CCTV)

Mechanical Supervisor at TAKREER Oil Refinery
  • December 2007 to February 2008

21 TAKREER Oil Refinery Hydro cracker & Hydro skimmer Major Turnaround (ADNOC from Dec, 2007 to Feb, 2008 Rawais United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • February 2008 to February 2008

20 GASCO 0 Train- I, II, SRU 50/51 & Utilities Shutdown from Feb, 2008 To Feb, 2008 Habshan United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • September 2007 to December 2007

22 GASCO Habshan- 2 Unit 37, 38, 39, Utility & SRU 58 & 59 Shutdown from Sep, 2007 To Dec, 2007. Habshan United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Mechanical Supervisor at GASCO (Habshan) BAB Plant Shutdown
  • March 2007 to April 2007

23 GASCO (Habshan) BAB Plant Shutdown from March, 2007 to April, 2007. Habshan United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Mechanical Supervisor at DESCON
  • United Arab Emirates
  • January 2007 to February 2007

24 BOROUGE Polymer Plant, PE-1&2 General Shutdown From Jan, 2007 to Feb, 2007. Rawais United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Mechanical Supervisor at TAKREER Abu Dhabi Oil Refinery Condensate Train
  • September 2006 to December 2006

25 TAKREER Abu Dhabi Oil Refinery Condensate Train-1&Train-2 Shutdown From Sep. 2006 to Dec, 2006. Rawais United Arab Imarets (ADNOC) DESCON Mechanical Supervisor

Piping/Commissioning Supervisor at SIEMENS
  • India
  • December 2005 to September 2006

26 Chanda Gas Processing Plant Project (OGDCL) Pakistan From 14, Dec, 2005 to 07, Sep, 2006 t Ouch OGDCL Ouch Gas Larkana (Sindh) Pakistan SIEMENS Piping/Commissioning Supervisor


INER PERSONAL SKILLS.
❖ Can Work well under pressure conditions.
❖ Can perform well, both independently and as a team member.
❖ Can adopt easily new concept and multiple responsibilities.
❖ Can adopt Environment of changing circumstances.
❖ Excellent Leadership qualities.
❖ Able to work independently without close monitoring.
❖ Have the ability to never disappoint who believes in my capabilities.

❖ RESPOSIBILITIES

Being Supervisor, I have addressed the following tasks;
❖ Supervise and mentor Shutdown and Project Teams to establish robust HSE cultures. In order to complete shutdown and project activities safely and on time in accordance with Good oilfield practice, current or future, procedures, quality and standards.
❖ Managing the resources (Manpower, Material and Equipments) fro site.
❖ Managing and Organizing the Inspection of Equipment's before Erection and After Erection.
❖ Erection of all the Rotatic and Static Equipments as per drawing and Location.
❖ Arraignment of Alignment (Laser, Digital) tool fro Erection of Rota tic and Static Equipment's.
❖ Maintenance of all static Equipments and Maintenance, Hydrojetting, Hydro Testing HP Exchanger and Deferential Test of Exchanger, Redubbing and Expending.
❖ Piping Fabrication job for replacement/Modification in projects & shutdown as per Drawing.
❖ Participate in the commissioning of the Mechanical systems.
❖ To coordinate the plant operation department during the start up of plant & to eliminate the problem (if any)
❖ Daily progress reporting of executing job to site Engineer.
❖ Identifying the detail scope of work.
❖ PIPING RESPOSIBILITIES

❖ Provide construction supervision and lead of all piping works for the project modules.
❖ Ensure project execution to HSES standards and within quality, schedule, cost, of objectives.
❖ Monitor the use and availability of Piping Material and consumables.
❖ To sport the fabrication team at the sight during prefabrication, fabrication, erection, assembly, testing and delivery of the modules.
❖ Confirm the fabrication team has rebust execution plan for modules prefabrication, fabrication, erection, testing, preservation, load out and hand-over. Construction and testing procedures including NDT and pre-commissioning 'third party' requirements and their coordination, Review of P&ID's, Layouts, Isometrics, 3D model and Schedule to develop related construction and testing program.
❖ Ensuring specification and code compliance and the deliverables schedule is maintained.
❖ Monitor and update reporting on the piping fabrication progress.
❖ Identify and highlight any risks.
❖ Manage the piping supervision position..
❖ To provide input for lessons learned.
❖ Conduct all activities in the safe and efficient manner in the accordance with the company's policies and procedures.
❖ Ensure quality of fabrication and construction and implementation of quality plans.
❖ Participate in the company safety performance program.
❖ Quality control of pipe fabrication and installation as per ISO requirements on site.
❖ Oversee Pressure testing by the piping operators.

❖ COMMISSIONING RESPOSIBILITIES

❖ Supervise Oil and Gas Plant activities such as commissioning and start up.
❖ Ensure compliance of the activities for which he is responsible with the established process and HSE requirements, while respecting the relative time.
❖ Review contractual documentation.
❖ Verify that the pre-commissioning, commissioning and start up requirements are accounted for into engineering documents.
❖ Take part in project planning and scheduling.
❖ Participate in the commissioning of the Mechanical systems.
❖ Prepare and keep up-to-date the pre-commissioning, commissioning, start up and test run execution plans (including the mobilization of personnel)
❖ Review and acknowledge the pre-commissioning, commissioning, welding specifications as required. start up and handing over procedures already prepared and falling within his sphere of responsibility.
❖ Supervise the preparation of additional procedures as needed.
❖ Ensure the issue of work progress reports.
❖ Ensure, at site, the management of commissioning and start up activities, coordinating the activities carried out by the Contractors, Suppliers, and third parties, availing with the assistance of Commissioning Manager.
❖ Ensure quality of fabrication and construction and implementation of quality plans.
❖ Monitor the use and availability of commissioning spare parts and consumables.
❖ Support the Commissioning team for area of responsibility;
❖ Execute the precommissioning, commissioning, start-up and test run activities. For these activities, define the required equipment, tools and manpower;


STATIC EQUIPMENTS MAINTENANCE RESPOSIBILITIES
❖ Maintenance of columns, vessels, valves, heatexchangers, furnaces, condenssor, chiller, reactors, air Finn collar, boilers, flare, stacks, incinerators, sulphur sleeve legs, piping, valves.
❖ Monitor the use and availability of Static Equipments Material (especially Gaskets) spare parts and consumables.
❖ Monitor/Ensure Equipments Spading De-spading procedure as per company policy.
❖ Awareness about Confined Space and HSE procedure.
❖ Supervise and provide technical direction to a group of skilled trades hourly employees.
❖ Administer planned and predictive maintenance program
❖ Manage the maintenance resources in support of the business team objectives
❖ Ensure proper problem solving for first time and permanent resolution and allocate resources to provide timely service on a priority basis.
❖ Responsible for the effective use of personnel, material and equipment
❖ Implements safety and good housekeeping standards
❖ Trains, develops, and evaluates employees
❖ Initiates contact with others outside of work group when required to solve problems
❖ Completes work assignments required within budget, manpower and timing constraints
❖ Will establish, implement and maintain long-range plans for improvement of maintenance activities and provide technical assistance to the manufacturing departments supported
❖ Vessels ( Knock out Drum, Scrubber, Coalsser, Flash Drum, Condensate Drum) Internal Cleaning, repair, replacement of internals ( Demister Pad)

❖ Tanks ( Sulphur storage Tanks, Cooling water Tanks, Degassing chamber) Internal Cleaning, repair & Hydro test
❖ Column ( Tray type Column, Packing type Column) Internal Cleaning, repair, replacement of internals ( Demister Pad, Chimney tray, Catalyst) Static test of Chimney tray
❖ Heat Exchanger & Condenser ( Tube & Plate Types) ( U type, Fixed and I, Floating head, , Hair pin type, Air fin Heat Exchanger) Pullout Bundle Cleaning, Hydro jetting, Repairing, Retubbing & Hydro testing ( Differential test, Pneumatic test)
❖ Boiler ( Water tube Boiler & Fire tube Boiler) Internal Cleaning, repair & Hydro test
❖ Reactor & Dryers Internal cleaning repair Replacement of internal, Loading and unloading of Catalyst
❖ Miscellaneous ( Incinerator, Stack, Flare, Furnace, Heater, Line Heater, Combustion Chamber, Replacement of Valves, PSVs, NRVs, MOVs, and CVs)
❖ Compressor and pump Maintenance and Alignment (Laser, Digital and Manual)

Education

Bachelor's degree, Mechanical piping supervisor
  • at Government College of technology Karachi
  • January 2003

❖ 2000 Diploma of Associate Engineer Session (2000-2003) Government College of technology Karachi, Pakistan

High school or equivalent,
  • at Government High School Mehmolod Kot
  • January 1994

❖ 1994 SSC (science) Session (1994) Government High School Mehmolod Kot, Pakistan.

Specialties & Skills

Heat Exchangers
Equipments
Plant Commissioning
Plant Maintenance
ASSEMBLY
BOILERS
CATALYST
COLUMNS
OIL REFINERY
REFINERY

Languages

English
Intermediate

Training and Certifications

Safety training form ADGAS and QATAR (Certificate)
Date Attended:
November 2010
Valid Until:
February 2012

Hobbies

  • cricket