Ghous Mohammad, Transport Planning and Implementation Manager

Ghous Mohammad

Transport Planning and Implementation Manager

NEC Saudi Arabia Ltd.

Location
Saudi Arabia - Riyadh
Education
Master's degree, MBA Project Management
Experience
20 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 11 Months

Transport Planning and Implementation Manager at NEC Saudi Arabia Ltd.
  • Saudi Arabia - Riyadh
  • My current job since January 2018

Working as Transmission Planning and Implementation Manager and sharing responsibilities with Solution Manager for new business opportunities. Also, I am responsible for post-sales planning and optimizations activities and reporting to Projects Director.
Designing the transport networks for on-going projects & Tenders according to the customer’s requirements in terms of topology, flexibility, quality and capacity demands using a big range of NEC wireless products like iPasolink VR series (200, 400 &1000), iX Advance and E- band Advance & 7000iP Trunk Radio, etc.
Validate and convert customer requirements (Request for Proposal and Request for Quotation) into Bills of Quantity (BoQ) and to facilitate the proposal of technical transmission solutions.
Technical sales support for Transmission Networks.
Handle transmission-related concerns for rollout and special projects.
Business Development of NEC Portfolios by proficient Pre-Sales/Technical Solutions, including detail Technical Solutions write-ups, customer presentations, etc.
Defining Network expansions and optimization strategies, goals, and target KPIs for the transport network.
I am also handling Project management. (Material ordering, Material management, Project coordination, Reconciliation, Cost reduction, reuse of hardware, resource Management, etc.).
I am designing the most critical Microwave Long haul backbone Links using NEC 7000iP truck radio to meet the data capacity requirements, especially in the most challenging geographical locations like Islands, Hills& Deserts.
I am designing the high capacity link up to 10Gbps over the Microwave using NEC E-band EX advance Radio to meet the fiber kind of capacity requirement for 5G backhaul Network, etc.

Project:
ZAIN-NEC KSA 2G/3G/LTE 2017 Ignite and SAR Project
NEC-ETISALAT UAE Backbone Project(On-going)
MOBILY(Etisalat)-NEC Last Mile Project(On-going)

Senior Transmission Planning Engineer at NEC SAUDI Ltd
  • Saudi Arabia - Riyadh
  • January 2012 to January 2018

Worked as Regional Transmission Planning & Optimizations Lead and reported to Transmission Manager and was responsible for Microwave Transmission Planning/Design pre-sales and Post-sales for the North region of ZAIN KSA Network.
I have designed High capacity Microwave links such as 4+0 XPIC, 4+4 XPIC SD, 8+0 XPIC & 8+8 XPIC SD for Backbone, and access Transmission Networks.
Prepared the actions to plan for the troubleshooting and optimizations in including reflection analysis, multipath fading analysis, etc. of the Problematic Microwave Links.
Closely monitor the Microwave link Performance and recommend the necessary actions to be taken to ensure the smooth Handover of the MW links to the Network Operations Team.
Proposed upgrades/expansions of the existing Microwave Networks in order to launch new services and technology in the network.
Planned and designed the high capacity IP/MPLS & ERP rings using Microwave & Fiber optics Nodes/Rings to Optimize the Networks to have optimal performance/ KPIs of Microwave Links.
Frequency planning for the new MW links, intra-network Interference Analysis & Provide Cost-effective Solutions.
Prepare the CITC applications of microwave links for CITC approval.
Closely worked with customers to know the RF radios requirements and provide cost-effective designs and solutions for Transmission Networks accordingly.
Attended weekly projects rollout progress meeting with a customer and presented the progress reports also highlighted the show stoppers if any and mutually agreed on the solutions to have smooth network rollouts.
Prepared Bills of Quantity (BOQ) for the given scope based on the required MW link dimensioning/link configuration and control of hardware to ensure the deployments of equipment must go according to the agreed scope.
Evaluated existing LTE network utilizations of the MW existing network and advised accordingly for network performance improvement.
Handled transmission-related concerns for rollout and special projects and provided support to regional transmission Engineers to achieve the given monthly targets.
Prepared Leased Line reduction plan, new Hub addition and recovery plan for BSC/RNC and other hub locations, etc.

Project:
ZAIN-NEC KSA 2G/3G/LTE 2014 Re-load Project(North Region)
ZAIN-NEC KSA 2G/3G/LTE 2013 Ver Project(North Region)
ZAIN-NEC KSA 2G/3G/LTE 2012 FTK Project

Regional Transmission Lead at ZAIN KSA
  • Saudi Arabia - Abha
  • December 2008 to December 2011

Lead the region technically for all Transmission activities with a detailed technical understanding of working principles of communication systems, including Microwave, SDH, DWDM, Fiber Optics, and VSAT, etc.
Approval of Microwave Link Budgets, Technical site Survey Reports (TSSR), and LOS reports submitted by Vendors and ensured smooth transmission Roll-out activities for new and upgrades sites.
Understand the scope of the project, coordinate with regional and vendor teams across other functional areas (BSS, RF, CIVIL, Electromechanical) to ensure the transmission media readiness for all internode connectivity like BTS, BSC/RNC, and MSC, etc.
Attending the weekly regional vendor meeting and identify the bottleneck for transmission roll-out and planning issues (if any) & follow up the same with Vendors to provide alternative plans accordingly within the time frame given by the management, etc.
Setting up and applying the acceptance criteria for all transmission elements and ensuring the field teams implemented the agreed standard.
Frequently use telecommunication software and hardware, like Pathloss, NetAct, MapInfo, Global Mapper/Google earth, and BER Tester, to check the designed and implemented transmission networks.
Supervising, commissioning, Integration, and Acceptance Testing of Transmission Equipment.
BOQ preparation for the upcoming project phase-wise and vendor wise as well.
Transmission network Optimization and Network Protection, etc.

Projects:
AIN-NSN KSA 2G/3G Mobile Broadband Projects
ZAIN-ZTE KSA USFII 2G/3G South Project
ZAIN-ZTE KSA LTE

Transmission Planning Engineer at Future Communications Co. (FCC) ,NOKIA(consultant) – Bahrain, UAE
  • Bahrain - Manama
  • July 2006 to November 2008

Worked as Transmission Planner and reported to NPO & Project Manager, was responsible for Radio & Transmission Planning and Performance Monitoring of Existing MW Networks to meet the KPI and minimize the outages of the MW Links.
Prepared Troubleshooting Procedure for MW Links (if needed), Perform capacity planning on existing links and advice on the need for optimization and expansion.
Plan a Cost-effective transmission solution for capacity & traffic routing.
Allocation of transmission capacity for 2G & 3G circuits including A-bis, Iub & Ater, IUs
Design 7/13/18 GHz Nokia Flexi Hopper, NERA SDH City Links & Evolution series, STM-1 for Capacity Enhancement and Performed/prepared Acceptance test Documents for NERA Evolution series SDH Hops.
BSS/RNC Dimensioning.
Calculate loss/attenuation, fading and fade margins, terrain study, geography, Profile Study, quality, and availability of MW SDH/PDH Links and Perform Reflection Analysis for all MW Links to meet KPIs.
Frequency planning for new MW sites, Interference Analysis& Provide Cost-effective Solutions, Site Survey / Engineering,
PCM Planning and Prepare BOQ.

Projects:
MTC-Vodafone, now (ZAIN Network 2G/3G) Bahrain
Zain Bahrain Wi-MAX Backhauling Protected Loop Project
DU United Arab Emirates 2G/3G Network

Transmission Planning Engineer at ADA Cellwork( GTL LTD) C/O NOKIA INDIA PVT LTD, J.M.Road Dealing Chambers, Above Portico Ice Cream
  • India - Pune
  • October 2004 to July 2006

•Worked as Transmission Planning Engineer, Led the Team and reported to the Zonal Team Leader, responsible for Radio & Transmission Planning and Microwave transmission design using Net Act Planning Tool Software and Path Loss.
•Design transmission topology for major Cities and Town based upon Cellular Plan & Design 7, 15 and 18GHz Microwave for Nokia Radio and Ceragon SDH Access Hops to full fill the Traffic demand of Existing Network.
•Providing Telephonic support to out station customers, Onsite support & maintenance and Transmission support of other projects including special sites, Hotspots & Fixed Mobile customers.
•Microwave PtP radio Link Budget calculations. Frequency planning (Channel Allocation) and perform interference analysis.
•PCM Planning, E1 allocation, Time slot mapping, TRX Upgrade, Swap and Expansion activity, Upgrade of PDH ring in preparation for EDGE implementation and Capacity Planning for MW Links.
•Dimensioned transmission network capacities to the rollout projects of Bharti Cellular in Maharashtra, Goa and UP east and UP west and Submission of frequency applications to the regulation authority.
•Coordinated with Radio Planners, Implementation Group, Operations during planning until integration of site to the network and Optimization of Transmission Network in compliance to Quality, Capacity and Cost Control.

Projects:
•BSNL-Nokia UP West and Uttaranchal Circle
•Bharti-Nokia Maharashtara & Goa Circle

Achievements:
•Instrumental in planning 700+ New Sites and 122 New Towns on 7 GHz Backbone in Maharashtra & Goa Circle.

Graduate Trainee Engineer at Telecom Network Solutions Private Limited (ext.NOKIA)
  • India - Delhi
  • July 2003 to October 2004

I was Responsible for Line of sight (LOS) Survey and Terrain study using Pathloss Planning tool and contour study on Topographical maps of India for Orissa, Jharkhand & Bihar.
Prepared Standing Advisory Committee on Radio Frequency Allocation (SACFA)/The Wireless Planning and Coordination (WPC) Application for the MW Sites.
Calculate the MW antenna heights and required Tower heights based on RF and Transmission requirement using the LOS/RF survey report with the help of Pathloss (planning tool)
Prepared daily progress reports etc.


Projects:
Bharti-Nokia, Bihar, Jharkhand & Orissa
Bharti-Ericsson, Delhi & NCR

Education

Master's degree, MBA Project Management
  • at Bharathiar University Coimbatore
  • December 2016

MBA Project Management 2016

Bachelor's degree, Electronics&Communications
  • at Jamia Millia Islamia(Central University)
  • June 2003

Specialties & Skills

Optimization
Service Implementation
Project Management
Roll Out
Planning
MS Office and Windows 98 / 2000 / XP
Transport Planning and Implementation
• Network Operations
DWDM and Optical Networks.
• Backbone & Access links Transmission Planning
• SDH Equipment: hiT7035,hiT7070
in IP communication (OSPF, VLAN, IP/MPLS, QoS, Ethernet LAN Switching, etc.)
• Material Management
• Project Management
• Expertise on Microwave Transmission Planning tools like Pathloss 4/5, NetAct, Aircom connect, etc.
• Transmission Optimization
• GSM Project Implementation
• Material Ordering
• Transmission Solutions (Pre-Sales)

Languages

English
Expert
Urdu
Expert
Arabic
Beginner

Training and Certifications

OOPS and C++ (Training)
Training Institute:
TATA InfoTech Education
Date Attended:
July 2001
Duration:
60 hours
Certificate in routing and switching (Training)
Training Institute:
IACM New Delhi
Date Attended:
January 2004
Duration:
120 hours
BS15-PMP Training (Training)
Training Institute:
Business Solutions Est.
Date Attended:
October 2017
Duration:
35 hours
Microwave Link Planning and Optimization (Training)
Training Institute:
Nokia
Date Attended:
October 2007
Duration:
40 hours
SRT1F MW links planning & deployments (Training)
Training Institute:
Nokia Siemens Network
Date Attended:
May 2009
Duration:
32 hours
Flexi Hybrid planning &Implementation (Training)
Training Institute:
Nokia Siemens Network
Date Attended:
August 2009
Duration:
24 hours
IP Networking (Training)
Training Institute:
Nokia Siemens Network
Date Attended:
January 2010
Duration:
16 hours
IPASOLINK 200/400/1000 with PNMSj, PC-MG (Training)
Training Institute:
NEC Saudi Arabia Ltd.
Date Attended:
December 2012
Duration:
40 hours
IPASOLINK 200/400/1000 (Training)
Training Institute:
NEC Saudi Arabia Ltd.
Date Attended:
June 2012
Duration:
40 hours
Pathloss Rel4/5 Microwave Radio Link Design (Training)
Training Institute:
NEC Corporation Tamagawa, Japan
Date Attended:
March 2014
Duration:
40 hours
Microwave Link Design Course (Training)
Training Institute:
NEC Corporation Tamagawa, Japan
Date Attended:
March 2014
Duration:
40 hours
Operation &Maintenance of IPASO 200/400/1000 equipment (Training)
Training Institute:
NEC Saudi Arabia Ltd.
Date Attended:
January 2014
Duration:
32 hours
IPASOLINK VR Radio O&M Course (Training)
Training Institute:
NEC Saudi Arabia Ltd.
Date Attended:
February 2016
Duration:
41 hours
UNMS NMS O&M Training Course (Training)
Training Institute:
NEC Saudi Arabia Ltd.
Date Attended:
February 2017
Duration:
32 hours