Senior Project Manager MEP Contractor
LIMITLESS Engineering LLC -
Total years of experience :22 years, 1 Months
LIMITLESS Engineering LLC - Sharjah
Sharjah, UAE
Period: September 2018 - Present
Position: Senior Project Manager MEP Contractor
Project: Residential Building AREEJ 1-4, Al Jada Development, Sharjah
R.I. SPA - UAE/ITALY
Dubai, UAE
Period: May 2017 - August 2018
Position: Senior Project Manager and Site Manager for the Construction and F&M Management
Project: Military Airbase (confidential
Senior Project Manager, with wide background knowledge in Civil Engineering, Electrical and Mechanical System (MEP) for more than 22 years of international experience in Design, Site Supervision and Project Management.
Main field of experience for Residential, Commercial, Industrial, Public buildings, including Healthcare facilities, with high specialization in Technological Systems and Safety Management.
Dedicated and proactive attitude of problem solving, with a proven ability to achieve significant results of productivity and efficiency.
Important experience in Middle East and Africa, FIDIC skilled and International Building Codes knowledge that increase the flexibility and knowhow in the multidisciplinary Engineering aspects.
Main Skills: Civil Works, Concrete, Steel Structures, Electrical, Mechanical, HVAC, Plumbing, QA-QC, Fire Fighting System, BMS, Home automation.
PCM (Project and Construction Management) CONSULTANT: Project Manager acting as Client Representative and QA/QC advisor
Completion of 5 no.s Luxury Villas in the TIP PLOT of frond M, in Palm Jumeirah, Dubai.
Owner: Raspberry Meadow Limited
Dev.: AA Real Estate Dev. Co. LLC
Lead Consultant: DEC Dynamic Eng. Consultants LLC.
Architect: LWD
Main Contractor's Project Manager
Construction of High rise Building (Hameni Tower) G+4P+26Floors in Jumeirah Villade Circle
Developer: Zaya Real Estate
Project Mobilization, Enabling works, foundations
Main Contractor's Project Manager
construction of two mid-rise residential building B+G+4+upper in Dubai, Jumeirah Villa Circle
Villa Pera: owner Skai Real Estate
Villa Myra: owner La Ploma Limited
Developer: Skai Real Estate
Consultant: High Art
155 flats, with 9 no.s private swimming pools and 2 no.s common swimming pools+kid
works contract: 84, 6 million plus
fast track project (13 months for substatial completion)
3rd party inspector in construction and real estate industry
technical audit, quality and quantity survey in many different projects:
main clients (projects):
MUSANADA - Abu Dhabi (3rd party inspection of schools, mosque and institutional building in all AD emirate)
BIDC - BANIYAS Investment and Development Co. (extended technical audit iN Bawabat al Sharq Shopping Mall - Baniyas)
Abu Dhabi Media Co. (technical audit of AD Media studios and Ittihad building - Abu Dhabi)
SAVERGLASS (3rd party inspection for electrical system of glass factory in Ras al Khaimah)
FRENCH Embassy (3rd party inspection as per french regulation in relocation of the embassy in Itthiad towers - Abu Dhabi)
PDC - Palm District Cooling (technical audit of Palm Utilities district cooling network in Discovery Gardens - Dubai)
ADIH - Abu Dhabi Investment House (code compliance under LUSAIL regulations and Qatar law of Projects in Entartainment City - Doha)
chief of Construction Dept.
supervise, coordinate and lead Electrical CM and Mechanical CM
Project: Borouge Innovation Center
user: Borouge
client: ADNOC
contractor: ASCON
employed with MEP-subcontractor: ASTER Gilaf Group
amount of contract: 95 mi AED
Coordinator in the construction of Commercial Centre in Val Vibrata - Owner Arcobaleno S.R.L.
Development and implementation of HSE Plans and Procedures for Construction, Organization and control of HAZOP
Evergreen is a Consultant company of ODAC - Health dept. in many contracts of construction and renovation of public hospitals.
I was encharged of many different tasks all completed punctually:
1: Evacuation plan of TMC Tripoli Medical Center
analysis of the Fire Alarm System and of the Escape Routes of all the 9 floor of all the building of hospital (more than 500 drawings) and definition of the evacuation plan together with hospital safety management team.
2: Project management in TMC (Medical Supply Building, Waste Management Site, Incinerator) supervision of the contractor works according to the contract, executive projects and Bill of Quantities; weekly and monthly reports; approval of material and installation
3: Mechanical Project Manager in the construction of Zwara Central Hospital (I was incharged to control all the mechanical works: piping, HVAC, fire system, canalization
Freelance consultant in civil construction
Projects of electrical and mechanical systems (piping, HAVC, fire system)
Safety manager (hazard/risk analysis, evacuation plan)
HSE supervisor in many company about risk-management and loss prevention strategies (Fire Fighting Systems, Fire Alarm Systems, Chemical Risks, ect.)
Experiences in the following areas:
Organization of HAZOP, LOPA, SIL and HAZID reviews, performed at different stages of the design and in Loss Prevention Engineering activities (Firefighting systems, Fire Proofing, Fire & Gas detection, HAC, BowTie Hazard Analysis, HSEIA Process - Design and Review);
Identification and Integrity Assurance of HSE Critical Equipment and Systems
Development and implementation of HSE Plans and Procedures for Construction, Pre‑Commissioning and Commissioning activities;
Development and implementation of Emergency Response Plans, arrangement of Incident Command Systems and related program of training and drills
Development and implementation of HSE Management Systems based on the requirements of OSHAS 18001 and ISO 14001, both in design and in control
Experience in managing people and teams form different technical and cultural background
Development and implementation of full comprehensive HSE Training programs
HSE Audits
Incident Investigation with Route Cause Analysis
Revamping bluster AFO4 in the plant ILVA in Taranto:
Hot wind collector substitution - Sub contracting: SOECO Eng. & Constr. SRL
Structural layout installation and cooling piping of new “rigoloni”
Sub contracting: SOECO Eng. & Constr. SRL and DANIELI CORUS BV
Location: Taranto - Italy
Company: Co.FER. Montaggi S.R.L. Capriolo (BS)
Industrial engineering, Construction of industrial buildings, metal carpentry, piping
the company was dealer of electric material
I was responsible for logistic management and providing all the assistance/materials to the sellers.
In the time I was there the branch doubled the volume of sells
Periodic update in safety management according to the Italian Law Dec. Lgs. 81/2008
Energy Manager according Italian Law 10/91
Safety manager (design and execution) in construction works according to the italian Law D.Lgs. 494/96
Master Degree of Electronic Engineer, Sector Automatic - BioEnginering Tesis about "Fault tolerant Electronic Controller for gas burner, in MicroElectronics dept. with Merloni Termosanitari partnership