Gohar Khan, Lead Instrument Engineer

Gohar Khan

Lead Instrument Engineer

Descon Engineering Limited

Location
Pakistan - Lahore
Education
Bachelor's degree, Electrical Engineering
Experience
14 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 9 Months

Lead Instrument Engineer at Descon Engineering Limited
  • Pakistan - Lahore
  • My current job since November 2013

Designing and reviewing specifications for control systems, PLC, SCADA, field instrumentation
 Developing control philosophy, cause & effect sheet, I/O list for control systems, instrument index, cable layouts & schedules
 Carry out installation, calibration and modification to electronic, instrumentation systems and components
 Corresponding with control system vendors and system integrators for technical bid evaluation reports / clarifications

Electrical & Instrument Engineer at Water Engineering and Management Services
  • Pakistan - Lahore
  • March 2013 to October 2013

oProvides technical services for engineering and commissioning of water treatment plants
oHands on experience on selection, installation and maintenance of metering pumps, Industrial process instrumentation & controls, PLCs, inverters, VFDs, pumps and Electrical Systems

Instrument Engineer at Fauji Fertilizer Company Limited
  • Pakistan
  • February 2012 to February 2013

o Rendered services to the largest fertilizer producer of Pakistan
o Selection, Installation, maintenance, troubleshooting and calibration of the Field Instruments including
Transmitters, Regulators, Gauges, Sensors, Control Valves, Shutdown Valves and Safety Valves
o Maintenance & Reliability of Process Instrumentation, Safety Systems & Control Systems
o Preventive Maintenance, Corrective Maintenance Plans & Job Scheduling in CMMS (SAP PM Module)
Projects
o Participated in the commissioning of a new Gas Booster Compressor installation project
i.e. JB Schedule, Cabinet layout, Cable routing layout, loop sheets, wiring diagrams, IO Counts etc.
o Hands-on experience with Yokogawa Centum CS 3000 DCS for WTCR Project

Electrical Engineer at Central China Power Grid
  • Pakistan - Lahore
  • June 2011 to January 2012

-Rendering services to the Chinese EPC contractor of NTDC/WAPDA
-Designing the Electrical EHV hardware for 500kV transmission lines for DG Khan Project
-Assisting Electrical Design Works for design submittal, approval, clarification, make necessary corrections on
design according to NTDC or NESPAK/BARQAAB instructions
-Working as Liaison officer between Project office and Site office on Electrical works issue

Support Field Engineer at Unified Ventures Limited
  • Pakistan - Lahore
  • September 2009 to May 2011

o Rendered services to the EPC contractor of SNGPL & SSGC (Gas transmission and distribution companies)
o Installing and maintenance of Telemetry equipment with sensors on 10M gas meters
o Troubleshooting of ROOTS® Proving System Model 5 2M/10M
o Working on Field Instruments (Temperature and Pressure sensors)

Education

Bachelor's degree, Electrical Engineering
  • at University of Engineering and Technology (UET), Lahore
  • August 2009

Specialization in Electronics Honors degree awarded

Specialties & Skills

Instrumentation
Electrical Engineering
Mircrosoft Office
AutoCAD
SAP ERP

Languages

Arabic
Intermediate
English
Expert
Urdu
Expert

Training and Certifications

Effective Presentation Skills (Training)
Training Institute:
FFC
Date Attended:
December 2012
Basic Management Skills (Training)
Training Institute:
MIT SOL CO
Date Attended:
December 2012