GOKHAN GUMUS, Construction Manager

GOKHAN GUMUS

Construction Manager

Nurol LLC

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Civil Engineering
Experience
17 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 9 Months

Construction Manager at Nurol LLC
  • United Arab Emirates - Dubai
  • My current job since December 2019

Project: Emaar Beachfront Plot-Z02.B3 Beach Vista - Dubai.
Project Summary: The Beach vista project is strategically located on Plot B.03 in Zone 2 of the Dubai Harbour Development (also known as Marsa Dubai: Emaar Beachfront), being developed as a Master Plan by Meraas. The Plot has an area of 6, 400 sqm with a maximum allowable GFA (Gross Floor Area) of 60, 792.51 sqm. Combined podium, Tower-1 comprises of G+M+5 Podium + 33 floors with 230 units, while Tower 2 comprises of G+M+5Podium+ 26 floors with 217 units, Podium comprises of 8 apartments on 4 levels. Public amenities are located on the Podium roof and comprises of swimming pools, shared kids pool, gymnasium, changing rooms, BBQ area, multipurpose room, dames room and theatre. Other than the 455 Residential units the project also houses a health-care center and 5 nos. retail spaces. The ground floor and podium houses 656 car parking spaces in total, to cater to the projects requirements as per authority regulations.
Responsibilities: To coordinate and manage all activities associated with the project such as; Civil, architectural, electro - mechanical & landscaping works.
Project drawings, manufacturer drawings, specifications & other detailed works.
Management of subcontractors.
Works associated with quality plan; control and supervision of quality according to procedures.
Ensure works are carried out according to the contract, specifications, time schedule, drawings, standards, and quality plan.
Manage all activities associated with the scope of works; utilize personnel and equipment adequately.
Management of Financial aspect of works and bill of quantities.
Coordinate and manage temporary and permanent acceptances.
Prepare, coordinate and manage final calculations.

Construction Manager at Nurol LLC
  • United Arab Emirates - Dubai
  • January 2017 to December 2019

Project: Golf View Apartment at Plot GA09
Project Summary: GA-09 Apartment Block consist of:-
Ground+Podium (14 Town Houses 2 levels, Retails, Parking, Stores, FM Offices and MEP services).
Block A (10 levels) Residential Apartments.
Block B (11 levels) Residential Apartments.
Construction 288 Units- 47000 m2

Construction Manager at Nurol LLC
  • United Arab Emirates - Abu Dhabi
  • November 2014 to January 2017

Project: Residential Building For H.H.SH.Sultan Bin Khalifa Bin Zayed Al Nahyan, PlotNo-C104/C105-Sector E-48
Project Summary: The execution, completion and maintenance of the 2 Residential Buildings including 2 basement, G+5 story building, G+4 story building with the Mechanical Rooms in top roof for each building.Approx Gross Floor Area - C104 : 11, 232 m2, Approx Gross Floor Area - C105 : 10, 717 m2.

Chief Engineer at ObrascónHuarte Lain, S.A
  • United Arab Emirates
  • January 2014 to November 2014

Project: Marmaray Project - Contract CR3
Position: Chief Engineer, Superstructure Works - Maltepe Station
Project Summary: Construction of Maltepe Administration OCC, Maintenance Workshop Building and Maltepe Metro Station including Civil and Structural Steel and Architectural works.

Chief Engineer at Alarko Contracting Group
  • Kazakhstan - Almaty
  • August 2013 to January 2014

Project: Aktogay Copper Project
Project Summary: The contract for the construction of the Copper Concentrate Plant having an annual capacity of 25 million tons of mining was signed in mid-December 2012. The project site is located in Kazakhstan Aktogay situated close to the intersection of the east and north railroad lines and 700 km away from Almaty.
The project construction period was 34 months including highway, railway, basin construction, concrete-steel and prefabricated buildings, long conveyor transportation lines, pipelines of varying diameter, assembly of equipment and mechanical installation and fully automated production control systems as well as numerous non-process buildings and facilities within the scope of the project have been undertaken on a turn-key basis.
The target date for the completion of testing and commissioning of the Aktogay Copper Concentrate Plant Project as well as commencement of ore processing were October 2015 unfortunately the project is terminated by Client due to commercial issues.

Chief Engineer at Renaissance Construction
  • Russian Federation - Moscow
  • July 2012 to August 2013

Chief Engineer
Renaissance Construction, Kaluga, Orekhova, Tula
Project: SCA Tula Paper Plant - Tula / Russia
Position: Chief Engineer, Finishing Works
Project Summary: SCA Paper Mill Factory (45.000 m2 and $65Million).

Project: Michelin Tire Plant - Orekhova, Davidova / Russia
Position : Chief Engineer, Superstructure Works
Project Summary: Michelin Tires Warehouse Consulting by Tebodin consisting 22.000 m2 Warehouse with 8 dock levelers and connected with existing Warehouse including 2.000 m2 G+2 storey Administration Office and 20.000m2 Structural Steel and Roof Covering works of Warehouse and auxiliary Asphaltic Pavement construction works.

Project: Excavator Manufacturing Plant for Volvo - Kaluga / Russia
Position: Chief Engineer, Structural Woks
Project Summary: Construction, testing and commissioning of 24, 642m2 plant including construction of 20, 924m2 Administration, Accomodation and Assembly buildings, Warehouse, Canopy, Utilities Buildings, Stock Area, Test Area, PDI Building, Gatehouse, Car Parkings consisting overall 59, 829m2 construction area.

Project Engineer at Bechtel & Enka &Bec C.V
  • United Arab Emirates
  • January 2012 to July 2012

Project: Development of Muscat International Airport
Project Summary: The total covered building area is 647, 000 m2. The scope of
works covers approximately 470, 000 m3 of concrete works, 80, 000 tons of rebar
works, 4, 000, 000 m3 of earthworks, 30, 000 tons of structural steel, 135, 000 m2 of
facade, 175, 000 m2 of roofing, 225, 000 m2 block works and 600, 000 m2 of floor
and 600, 000 m2 of wall covering works.

Site Engineer at Nurol LLC
  • United Arab Emirates
  • January 2008 to December 2011

Nurol LLC, Abu Dhabi, Dubai
Project: Bab Al Qasr Hotel and Service Apartments Project - Abu Dhabi / UAE (March 2010 to December 2011)
Project Summary: Construction, testing and commissioning of 165, 000m2 five star hotel project based on FIDIC 99 Lump Sum contract located in the cost of Abu Dhabi which is consisting 4 storey underground parking structures, 6 podium floors and 31 storey twin towers over one podium with the investment about $270Million.
Project: Construction of 856 Villas and Townhouses at Jumeirah Village Triangle Zone I, Dubai / UAE (September 2009 to March 2010)
Project Summary: Construction, testing and commissioning of 856 Villas and townhouses totaling 200, 000m2 construction area for Nakheel based on FIDIC 87 Lump Sum contract including landscaping and infrastructure works, structural and finishing and MEP works.
Project: Infrastructure Project, Nakheel Jumeirah Park DO452-1- Dubai / UAE (April 2008 to September 2009)
Project Summary: Total 400ha A to Z infrastructure works including utilities services, road, lighting, irrigation, sewers, water, stormwater lines etc. ıntrnal roads (60km), gradins and earth works including Subgrade, Subbase, Roadbase, Primecoat, Bitumenus pavements, Roundabouth (3150m2), Concrete, Kerbstone & Interlocking tile works, Street Lighting and Foundation (4272 pieces), Portable Water Pipeline Works (75km), Storm Water Pipeline Works (45km), Irrigation Rezervuar and Irrigation Pipeline Works (6580m3) and Pipeline (42 km), Conduit and Pipeline for Electrical connection Works (20km), Sewerage Pipelines (41km) and (1350nos. Manhole and 1452nos. House connections), Retaining Wall Works (1.5km), and Substation Works (90nos.).
Project: Construction of 856 Villas and Townhouses at Jumeirah Village Triangle Zone I, Dubai / UAE (September 2009 to March 2010)
Project Summary: Construction, testing and commissioning of 856 Villas and townhouses totaling 200, 000m2 construction area for Nakheel based on FIDIC 87 Lump Sum contract including landscaping and infrastructure works, structural and finishing and MEP works.

Technical Office Engineer at Nurol Construction and Trading Co.
  • Türkiye - Ankara
  • August 2007 to April 2008

Inc., , Ankara
Project: Tender Department
Projects Summary: Several Projects at U.A.E.
Responsibilities: Measurement; Timely, comprehensive and accurate
preparation of offers, cost saving, process improvements, tender deadlines met
on the tenders allocated.

Site Engineer at BM Construction and Trading Co.
  • United Arab Emirates
  • August 2006 to August 2007

Inc., , Karaman
Project: Ermenek Dam and HEPP Construction Karaman - Turkey
Projects Summary: The Ermenek dam and hydropower project is one of seven
hydropower plants, dams, and diversions planned or constructed in the Göksu
River basin in southeastern Turkey. The Göksu River is one of the last free flowing
rivers in Turkey and an important site for both migratory birds and plant diversity.
A large portion of its delta is protected under national laws and by international
listing as a Ramsar site. The Ermenek project has been approved and is currently
under construction, with financing from a consortium of private European
banks. These banks are not bound by the environmental and social safeguards,
and decision transparency, mandated of intergovernmental financial
institutions such as the World Bank Group. Such safeguards were developed by
specialists, and adopted by the governing boards, in response to massive public
pressure following disastrous consequences of high-profile projects funded by
these organizations.

Education

Bachelor's degree, Civil Engineering
  • at Kirikkale University
  • July 2006

81/100

Specialties & Skills

Warehouses
Residential
Infrastructure
High Rise
Project Management
ms project
autocad
ms office
sap 2000
primevera

Languages

Arabic
Beginner
English
Expert
Russian
Intermediate
Turkish
Native Speaker

Hobbies

  • Language and sport
    I read books to help improve my English and do sports like swimming, cycling and running.