Gokula Bushanam Murugesan, Electrical Engineer in Engineering Development Section

Gokula Bushanam Murugesan

Electrical Engineer in Engineering Development Section

TAKREER, ADNOC

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
دبلوم, Power System Study
الخبرات
25 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :25 years, 11 أشهر

Electrical Engineer in Engineering Development Section في TAKREER, ADNOC
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ فبراير 2013

Electrical Engineer in Engineering (Contract Hire) .

Primary responsibilities are to develop Improvement projects for plant modification and installation of new facilities under CAPEX and OPEX budget.

Review, Evaluate and perform Management of Change (MOC) Request from Various Department.
Co-ordinate and guide consultant during FEED and Detailed design phase of major projects. Perform Engineering studies for in-house engineering projects.
Conduct feasibility study, site survey and collection of data for project proposals for plant improvement, integrity and reliability.
Prepare scope of work, technical specification, cost estimate, Procurement engineering, technical bid analysis, vendor and contractor negotiations, inspection, FAT and SAT.
Participating in the preparation of cost estimates for future capital projects for inclusion in the overall capital budget.
Handling around various minor projects for Electrical and Low current system. Involved in Engineering for various Major projects.
Performed feasibility study and proposed various Capital projects for Electrical network and plant improvement for budgeting in the five years plan.

Senior Electrical Engineer في Omanoil Refineries and Petrochemicals Co. (Orpic)
  • عمان - مسقط
  • مايو 2009 إلى يناير 2013

Senior Electrical Engineer (Engineering & Projects)
Primary responsibilities are to develop, design, plan and execute electrical projects and assigned multi-discipline projects to ensure the optimum reliability, availability and technical integrity of plant assets.
 Handled the execution of electrical related activities for Co-generation power plant 2x25MW GTG, 2X2400TPD HRSG, 720TPD auxiliary boiler, 1000MVA diesel generator for black start, one desalination and polishing plant for feed water.
 Provided technical advice and assistance to the design office, procurement and construction team to support the development of projects, installation, commissioning and close out of projects.
 Performed review of FEED/Project engineering document and drawings on Propane recovery unit and LPG storage associated facilities for plant expansion.
 Performed review and approval of detail engineering drawings, documents, method statement, ITP, testing and commissioning procedures for plant expansion and co-generation power plant projects.
 Performed site survey, Prepared conceptual, basic and detailed electrical engineering designs and specifications for projects related to modifications, improvements and replacement of electrical systems and plants such as Capacitor Bank Installation, Construction of substation, Chemical Injection Skid facilities, Replacement of LR pump motors….
 Developed cost estimates for projects to support project development, technical bid evaluation, provide response to technical queries and assistance to procurement.
 Provided technical support and advice on problems raised during construction and commissioning work, assisted in the preparation of commissioning and start-up procedures.
 Performed Co-ordination with all inter-discipline team to meet project objectives and witness of contractor testing and commissioning.
 Managed all electrical activities of contractors and vendors are undertaken in safe manner according to the standards, technical specification, quality, HSE and cost requirements of the company and guided them to implement.

Senior Electrical Engineer in Operation and Maintenance.
 Perform/Assisted in operation and maintenance of 33KV/11kv/6.6KV/.44KV substations for all units in refinery.
 Performed Preventive, Corrective, Predictive and Turnaround maintenance of all electrical equipments such as Power Transformer, Switchgear, MCC, UPS, Motors, Generators, SCADA, CP system, etc..
 Assist in trouble shooting, active member to determine root cause failures of electrical equipments, power system faults and develop preventive and corrective action.
 Performed the replacement of old equipment such as motor, power transformers, battery chargers with respect to repairing cost, reliability, safety and production.
 Carried engineering investigation of plant defects, monitoring ageing equipments and under take necessary request for engineering or replacement study project.
 Performed spare parts management to ensure availability of tools, spares and consumables to support effective maintenance program for all electrical equipments.
 Establish, implement and monitor preventive maintenance program on the newly installed equipments.
 Initiated stock entry proposals, periodic review of minimum and maximum stock levels, Asset entry for new equipments.
 Prepared purchase requisition, performed technical evaluation and assisted procurement of the right material procurement and service contracts.
 Provided maintenance & technical services related to power system on existing plant facilities to maintain reliable plant electrical utilization systems and increase productivity.
 Involved in pre-commissioning, commissioning and start-up of the plant for the major and minor projects executed in the refinery.
 Assist in preparing yearly budgetary proposals for CAPEX and OPEX.

Electrical Lead Project Engineer في Al-Osais Contracting Co.,
  • المملكة العربية السعودية - الشرقية
  • سبتمبر 2001 إلى أبريل 2009

YANBU REFINERY, Yanbu, Saudi Arabia. (Nov 2006 - APR 2009) :
Lead Project Electrical Engineer & Construction Manager.
Primary responsibilities are to handle mega EPC Electrical Projects from inception to completion and to complete within time, budget with quality.
 Handled EPC project “ Electrical Distribution system Upgrade Phase-I” from inception to completion throughout all execution phases including Project Proposal, Estimation, Detailed Design, Procurement, Site development, Construction, Commissioning, Startup, project record & Close-out.
 Managed staff of 150 includes Engineers and Technicians to replace existing under-rated and obsolete power system equipments in the running operational facilities without feed reduction by providing back-up to the critical loads.
 Successfully implemented the challenging Installation, Commissioning & start-up of MV power equipments upto 13.8KV, 60MVA in double-ended six (6) substations including Main substation which feeds 18 substation, process area, tank form area, marine facilities and loading pump stations to the latest Saudi Aramco standards without feed reduction and incidents with innovative ideas in handling the critical loads.
 Handled construction, commissioning and start-up of 5MVA substation with 4.16KV switchyard to feed tank form area pump station and facilities.
 Performed planning, supervision, coordination and managed all on-site works, including installation, maintenance, testing & commissioning, start-up of MV & LV equipments such as Power Transformer, SF6 & Metal clad switchgear, NGR, MCC, UPS, ATS, Generator, Motors, Annunciator, Battery charger, Cable tray, raceways, cables and Fire alarm system upto 115KV, 60MVA.
 Performed overall management on large scale LSTK projects from inception to completion throughout all execution phases including Project Proposal, Estimation, Detailed Design, Procurement, Site development, Construction, Commissioning, Startup, project record & Close-out.
 Performed review & critique of detailed engineering, construction documents, equipment specifications, Protection and control schemes, technical submittals, electrical procedures & instructions and selection of subcontractors & vendors.
 Performed planning of construction methods and procedures, staffing requirement on each phase of construction, monitor, improve production, efficiency of work force and optimize utilization of company fixed asset and equipments.
 Managed Sub-contractors, Vendors to carry out work in compliance with applicable contracts, company policies, time and budget.
 Ensured all operations are undertaken in safe manner according with standards, technical specification, schedule, quality, HSE and cost requirements.

Uthmaniyah Gas & Oil Separation Plant (UGOSP), Saudi Arabia. (Sep 2001 to Nov 2006) :
Project Electrical Engineer.
 Worked as a Electrical Project Engineer in UGOSP’s 7, 8 & 10 (BI-10-8261) and UGOSP’s 9, 11 & 12 (BI-10-3074) with Saudi Aramco
 Handled Installation, Commissioning and start-up of MV power equipments upto 13.8KV, 30MVA in Two (2) substations which feeds Gas gathering & Desalter process equipments and Distributed Control system (DCS) CS Centum 3000S by Yokogawa.
 Performed successful electrical estimation for various projects (BI-10-8261, BI-10-3074, BI-10-00115) which were awarded to the company and were successfully completed within budget.
 Performed project management for 115KV OHTL re-routing at GOSP#9 in co-ordination with SEC from inception to completion.
 Worked as Saudi Aramco certified QA/QC inspector, performed quality management on the project.
 Maintained close track of scope of work, raised & estimated change orders for a value of 5 to 10million dollars on each project handled.
 Attend FAT, SAT on power system equipments, and performed As-built drawings & documents.
 Worked as a QA/QC Engineer, Site engineer prior to Project Electrical Engineer.

Assistant Electrical Engineer في Sagar Sugar and Allied Products (P) Ltd.
  • الهند
  • يونيو 1998 إلى أغسطس 2001

Site supervision of construction works at construction of 20.4MW, 90MW power plant, control room and 132KV Substation & switchyard to feed sugar factory.

• Responsible for project implementation of electrical related works such as installation of Boiler, Steam turbine, Generator, Power Transformer, Power Control center (PCC), Switchgears, Motor Control Center (MCC), HV & LV Panels, UPS, and Battery Rectifier/Charger etc.. upto 132KV
• To supervise the installation of cable tray, H.T & L.T underground cables, total lighting distribution system, power distribution system and all other electrical equipments, panels etc… and to assist Testing & commissioning & start-up of all electrical equipments

الخلفية التعليمية

دبلوم, Power System Study
  • في ETAP Automation
  • فبراير 2013

Certified Professional for Power system study in Electrical software, Electrical Transient Analyser Program (ETAP) Version 11.

بكالوريوس, Electrical & Electronics
  • في University of Madras
  • يونيو 1998

* Bachelor of Engineering in Electrical & Electronics Engineering (73.2% / First Class 1994-1998) University of Madras, Tamilnadu, India * Junior College In Science & mathematics (88.2% / First class 1992-1994), University of Madras, Tamilnadu, India * College First with honors in junior college * Saudi Aramco Oil Company approved QA/QC Electrical Inspector with SAP No.70002805 * Saudi Aramco Certified Work Permit Receiver with 100% marks scored (two times consecutive) in this certification course * Diploma in Advanced Client/Server Technology (First Class)

Specialties & Skills

Electrical Engineering
Electrical Maintenance
Project Collaboration
Project Management
Construction Manager
Electrical Project Engineer
Site Electrical Engineer
Project Engineering
Electrical Maintenance Engineer

اللغات

التاميلية
متمرّس
الانجليزية
متمرّس
الهندية
متوسط
العربية
مبتدئ

العضويات

International Electrical Association for Inspectors
  • student membership
  • June 2006