Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Abdul Sattar, Electrical Engineer

Abdul Sattar

Electrical Engineer·Hamad International Airport

Qatar

Bachelor's degree, Electrical Engineering in Power

Work experience

Total years of experience: 16 years, 1 months

Electrical Engineer

March 2013 - Present

Hamad International Airport

Doha, Qatar

March 2013 - Present

SAUDI BINLADIN GROUP QD-SBG DOHA QATAR. March 2013 - DATE
Operation & Maintenance (O&M) of Hamad International Airport, Doha, Qatar.
ELECTRICAL ENGINEER
Responsible for the Facilities Management of Cargo Complex. These Facilities includes the Electrical Power Distribution System (11KV/415V), Standby Electrical Power Generation System (1MW, 415KV, 50Hz), Power Distribution & Control System PMCS, Building Management System BMS, HVAC System including CRAC Units, Package Units AHU and Chillers, Lightening System, Fire Detection System.
• Supervising the Operation & Maintenance activities of MV/LV while Ensuring Work Quality as per Company Standards & Policies.
• Review the Design of Single Line Diagrams & As Built Electrical Drawings of MV/LV Power Distribution Network.
• Design electrical systems, perform complex analyses and prepares corresponding specifications for equipment as required for projects.
• Estimating cost, and expenditure projections for new facilities as well as support the overall field development plan.
• Responsible for operation and maintenance of Hormann Shutter Doors, ICB, IDPS, Card Readers, and Turnstile, Access Control Gates and Parking Barriers.
• Working on the fire protection system (FM200, Pre-action, Water sprinkler systems VESDA and Beam Detector System) & performed maintenance by following the safety standards and procedures.
• Having strong expertise for FACP, GAP, FM200 Panel, VESDA, Repeater Panel, APS, Initiating Devices, Notification Devices, Input Module, Output Module, Control Relays, and CCTV Cameras.
• Preparing risk assessment, method of statement and permits reports required to perform tasks.
• Planning and effecting predictive & preventive maintenance schedules for various equipment/lines to increase machine up-time & equipment reliability.
• Analyze complex electrical problems, evaluate and recommend alternatives and
• Coordinating with MOI, HIA, QAS and other stakeholders.
• Collaborate with the FRC team to generating CM work orders and for emailing on complaint matters, as well as coordinate with HIA-FRC.
• Responsible for follow-up for corrective and preventive works activity during shift and to ensure that the planned activity accomplished with the expected accuracy.
• Imparting continuous on the job training to the workforce for accomplishing greater operational effectiveness/efficiency.

Company industry:
Installation & Technical Services
Job role:
Electrical Engineering

Electrical Engineer

May 2010 - March 2013

Masood Textile Mills Ltd.

Faisalabad, Pakistan

May 2010 - March 2013

Worked in electrical department for providing technical support and designing electrical control circuits for motors.
Coordinated for the automation of machines.
Worked on all the instruments used for textile industry.
Preventive maintenance of diesel generator, Electrical distribution systems.
Installation of new transformers, control panels, LV panels.
Worked on the project of Boiler Erection drawing study and other technical support for the working team.
Installation of VFD’s and Soft Starter.

Company industry:
Textile & Apparel Production
Job role:
Electrical Engineering

Education

University of Engineering and Technology Lahore

April 2010

April 2010

Bachelor's degree, Electrical Engineering in Power

Pakistan

GPA (point): 3 out of 4

GPA (point): 3 out of 4

B.Sc in Electrical power Engineering

Govt. College Gujranwala

August 2005

August 2005

Diploma, Pre Engineering

Pakistan

GPA (point): 3.5 out of 4

GPA (point): 3.5 out of 4

F.Sc Pre Engineering

F.G. Boys Secondary School Rawalpindi

June 2002

June 2002

High school or equivalent, Science

Pakistan

GPA (point): 3.5 out of 4

GPA (point): 3.5 out of 4

Matriculation in Science

Skills

PLC
Expert
PLC
Expert
Lighting Control
Expert
Lighting Control
Expert
AutoCAD
Expert
AutoCAD
Expert
Troubleshooting
Expert
Troubleshooting
Expert
Plant Maintenance
Expert
Plant Maintenance
Expert
DRAWING
Expert
DRAWING
Expert
ELECTRICAL CONTROL
Expert
ELECTRICAL CONTROL
Expert
ENGINEER
Expert
ENGINEER
Expert
GENERATORS
Expert
GENERATORS
Expert
Power Quality Analysis
Expert
Power Quality Analysis
Expert
PLC,BMS
Intermediate
PLC,BMS
Intermediate
PLC
Expert
PLC
Expert
Lighting Control
Expert
Lighting Control
Expert
AutoCAD
Expert
AutoCAD
Expert
Troubleshooting
Expert
Troubleshooting
Expert
Plant Maintenance
Expert
Plant Maintenance
Expert

Languages

Urdu

Expert

Arabic

Beginner

English

Expert

Memberships

Pakistan Engineering Council

Registered as Professional Engineer

September 2010