Project Design, Execution, and Completion Assurance including Quality Management System for EPCC Turnkey Projects associated with:
•Oil & Gas Upstream facilities: Exploration & Production Wells, Gathering Stations, Gas Compression Stations, Oil Export Terminals;
•Oil & Gas Downstream projects: Petrochemical Refineries, LNG Process Plants;
•Power Generation Plants, HVDC Converter Stations, T&D Plants, Steel Plants, Smelter Plants,
Over 18 years’ experience in Project Management Services:
•FEED and Detail Engineering review of E&I Packages,
•Engineering co-ordination of E&I packages with client/consultant and sub-contractors,
•Project execution including installation, testing & commissioning of E&I Packages.
•Periodic review of sub contractor’s work.
•Technical negotiation with E&I Vendors and Sub-contractors
•Project handover to client/main contractor
•Project Close-out
Major Packages and Equipment handled:
•Power Generation Plants (30MW to 500MW),
•High Voltage DC Convertor Station (upto 500MW),
•Transmission & Distribution Systems (upto 400KV),
•HV/LV Switchgears and Breakers(upto 400KV),
Over 20 years’ experience in Quality Management System:
•Quality Management System for EPCC LSTK Projects and Operating Plants,
•Quality requirements for Pre-award and Post award Contracts,
•Vendor Evaluation/Appraises of Contractors/Vendors
•Quality Certification Audits (ISO 9001/14001, OHSAS:18001, ASME-U Stamp, PED (Module H/H1) and GBR-China Code),
•Asset Integrity Management: QHSE Integrity Audits for Projects and Operating Assets,
•Quality Control Management,
•Management of Change control,
•Quality Awareness Programs: Quality Improvement Workshops for Projects and Operations,
•Customer Feedback Review, lessons learned process implementation in projects,
•Quality Improvement Initiatives to support Global QMS across the company verticals.
Overall 12 years’ experience in Commissioning and Completion Assurance:
•Completion Assurance: Commissioning and completion assurance process review of Oil & Gas Wells from drilling to well completion; Well head to Hook-up; Processing Trains via Flow lines, Gathering Stations, Crude oil export lines to various crude refining customers (from concept design to completion as per Gated Process).
•Safety studies of HAZIDs, HAZOPs, PHSERs as per Gated process,
•Commissioning and Start-Up (CSU) / Ready For Start-Up reviews (RFSU) / Operational Readiness and Assurance (OR&A) and performance verification of critical packages and main systems,
•Safe Operating and Maintenance Procedures (SOPs) and (SMPs) for Operation Plants.
•Generation of Systems Completion Plan
•Generation of System Boundary Drawings by System / Sub-System i.e. P&ID’s, SLD’s, HVAC drawings
•Development of SC Project Roadmap
•Systems Completions Responsibility Matrix
•Generation of full System / Sub-System Listing
•Develop of Project specific critical Check sheets for MC (ITR-A) & SC (ITR-B) for all tagged items for Construction and Pre-commissioning.
•Manage Set up and population of Systems Completions Management Database Completions Management Database CCMS can be provided)
•Generate all project completion certification i.e. Discipline Mechanical Completion Certificate (DMCC), Sub-System Mechanical Completion Certificate (SSMCC), System Mechanical Completion Certificate (SMCC), Ready for Start-Up Certificate (RFSU), System Turnover Notice (STN), System Handover Certificate (SHC) (Full or Partial as Required), Facility Acceptance Certification etc.
•Complete Management and Generation of Completion Dossiers by system.
•Complete Management and Generation of full Step by Step Dynamic Commissioning Procedures
•Manage Commissioning and Start-Up, first-fills, tools and equipment to ensure all mentioned are present at site in a timely manner for execution
•Develop Systems Completions Vendor Support Plan.
Major Onshore Field Development Plans (FDPs) executed for Cairn Energy India:
Rajasthan Field Development Plans consisting of:
•Mangala FDP (18 well pads+ Crude Processing Terminal + 4 Trains + Export Oil Tanks + 5X10MW Captive Power Plant),
•Raageshwari FDP (Gas Processing Terminal + 10 Oil & Gas Well Pads),
•Bhagyam FDP (15 Well Pads and Trunk Lines between Bhagyam to Mangala Process Terminal),
•Aishwariya FDP (9 Well Pads and Trunk Lines between Aishwariya to MPT)
•Mangala Oil Export pipeline from Barmer (MPT) to Jamnagar, including spur lines to RIL, ESSAR, and IOCL
•EOR and Satellite Oil fields
•Thumbli Water line (NR-1) for plant utilities and for Water Injection Wells,
Ravva and Suvali (Cambay) Offshore Wells and Onshore Crude Processing Trains:
•Conduct Asset Integrity review audits,
•Corrosion protection of static equipment, pipelines and Safety Critical Equipment
•Statutory compliance audits (external)
•Management of Change (MOC) control for operational assets (rejunuation and revamping)
- Job role:
-
Other