QA/QC Manager
Orascom Construction Limited
Total years of experience :22 years, 6 Months
Project: NEW CAIRO WASTEWATER TREATMENT PLANT
Duties:
• Developed and implemented quality management strategies aligned with organizational objectives.
• Established and monitored quality assurance processes to ensure adherence to specified standards and
requirements.
• Implemented robust quality control systems to evaluate product/service quality and drive continuous
improvement.
• Maintained and optimized the Quality Management System (QMS) in accordance with ISO 9001
standards.
• Conducted internal audits to assess compliance, identify areas for improvement, and facilitate
corrective actions.
• Coordinated external audits by certification bodies, addressing findings and ensuring ongoing
compliance.
• Planned, conducted, and analyzed quality audits to evaluate the effectiveness of quality systems and
procedures.
• Identified non-conformities, recommended corrective actions, and reported audit findings to senior
management.
• Developed and monitored key performance indicators to assess quality performance, identify trends,
and initiate improvement initiatives.
• Provided leadership, guidance, and training to quality teams, ensuring competence, awareness, and
adherence to quality standards.
• Coordinate with the site construction manager on all quality issues Coordinate and chair the QA/QC
site weekly meetings with the project’s main contractor/client QC personnel
• Engaged with internal departments, suppliers, customers, and partners to address quality issues,
establish requirements, and foster a culture of excellence.
• Identified, assessed, and mitigated quality risks through proactive measures, monitoring, and timely issue resolution.
Project
BAHR EL-BAQAR TREATMENT PLANT 5, 000, 000 M3/DAY
Projects:
A) THE NEW AMMONIA UREA PLANT FACTORY \[KIMA-ASWAN\]
Projects:
A) THE NEW KING ABDULAZIZ INTERNATIONAL AIRPORT DEVELOPMENT \[KAIA- JEDDAH-SAUDI ARABIA\]:
B) EL SAFWA CEMENT INDUSTRY \[JEDDAH-SAUDI ARABIA\]:
Projects:
A) GABAL EL ASFAR WASTE WATER TREATMENT PLANT - Stage 2 - phase (1) -2nd Addendum to Contract No.19
B) OPTIMIZATION OF 1ST STAGE OF GABAL EL ASFAR WASTE WATER TREATMENT PLANT (GEAWWTP) Contract No.16
C) ABU RAWASH WASTE WATER TREATMENT PLANT
Duties:
a) Analyze survey reports, maps, Architecture drawings, blueprints to plan projects.
b) Plan and design structural systems, Structural drawings, workshop drawings, following construction and government standards, using design analysis software (SAP2000) and drawing tools (AutoCAD) according to Egyptian Code.
c) Compute load and grade requirements, and material stress factors to determine design specifications.
e) Direct construction, operations, and maintenance activities at project site.
g) Estimate quantities, cost of materials and calculation sheet preparing.
I) Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards.
Master thesis title: Punching shear resistance of composite column-flat slab connections