Construction Manager / Deputy Project Manager
Al Naboodah Contracting Co LLC
مجموع سنوات الخبرة :21 years, 8 أشهر
Project: CCMI - Mirdif City Center Car park Extension
Client: Majid Al Futtaim (MAFP)
Consultants: Mott MacDonald / Arcadis / Infracad / WSP; Contract Administrator: EC Harris
Project Value: AED 260m ($ 71m)
Position: Construction Manager / Deputy Project Manager
The work includes: Construction of new Carpark level; Shear Bracing works - RCC foundations and Structural Seismic steel - at external elevations with external facade and three courtyards with reinstatement of hard and soft landscaping; Extension of three welcome courts; Construction of Male and Female Prayer rooms
Key Achievements: Coordination with design and engineering team, contractors and consultants to ensure workable structural and architectural shop drawings - as per project specification and client requirements - are submitted and got approved, procurement done within programme dates. Working with multi trades to develop quick and effective sequence of works with zero defects, achieving milestones by complying with company and project health and safety policies and rules - without LTI at site.
Collaborate and coordinate with Design and Engineering team for multiple trade works shop drawings. Review and follow up for submittal and approval of materials, drawings, documents. Identifying and resolving interface issues and changes.
Liaison with QS and Planning teams for identifying, planning and managing the resource requirements; development of short term programs and reporting on progress
Liaison with Procurement department to ensure order and supply of resources and materials was in line with programme delivery dates.
Liaison with MEP department, HS&E departments and QA/QC department in order to ensure civil works been done with respect to project standards, in accordance with established policies, procedures as approved by company, consultant and client
Daily coordination of multi trade sub-contractors.
Development of short term programs by collaborating with Planning department. Prepare and submit weekly and monthly progress reports for cash flow.
Working with QA/QC department for closing-out open RFI’s and NCR’s for civil and architectural works and interface works.
Proactively respond towards work delays, emergencies, and other problems. Effectively and efficiently organize available workforce
Project: AMMROC - Advanced Military Maintenance Repair Overhaul Center
Client: Mubadala / Lockheed Martin
Consultant: ECG; TA for Client: WSP; PMC: Aecom
Project Value: AED 1, 700m ($ 463m)
Position: Construction Manager
Project comprises of EPC - Engineering, Procurement and Construction and Commissioning of Advanced MRO Facility - Maintenance, Repair, Overhaul on aircrafts - both fixed wing and rotary - and aircraft accessories used in pneumatic, hydraulic, electromechanical, electrical, mechanical, avionics, egress and fuel systems and a full paint and strip facility
The work includes: Construction of Main Building and Hangars 1&2 - RCC sub-structure and Structural steel super structure (15, 000 Mt); Hollow-rib mezzanine floor slabs; Blockwork and Drywall partitions with floor, wall and ceiling finishes; Secondary steel works for External façade works and MEP works (total 3, 000 Mt); Roof waterproofing and cladding works; Main and small Pant Booth construction works; Roller shutter door works; Hangar Door works; EOT Crane works i/c Crane beams and brackets installation; Construction of Ground Support Equipment (GSE) and Training Building: RCC Sub-structure and Super-structure works, Precast Hollow Core Slab and Staircase works; Blockwork and Drywall partitions with ID floor, wall and ceiling finishes; Small paint booth works, Roller shutter door works, EOT Crane works i/c Crane beams and brackets installation.
Key Achievements: Erection and Installation of 12, 000 Mt of Structural steel in 4 months without LTI. Identifying and resolving Civil/MEP interface issues and Architectural problems to overcome any possible delays to delivery dates. Achieving a total of 25 Million Manhours without Loss-Time-Incident (LTI).
Collaborate and coordinate with Design and Engineering team for multiple trade works design and shop drawings. Help in identifying Structural with MEP and Architectural works interface issues and propose solutions.
Daily coordination and supervision of multi trade sub-contractors, Attending weekly meetings with Client, PMC/Consultant and contractors.
Development of short term programs by collaborating with Planning department.
Advise commercial staff on the required actions on claims and variations submitted by contractors, review and approve payment certificates from contractors
Strictly follow and enforce HSE rules & regulations and permit to work system. Manage all interfaces between contractors. resolve and advise on site / construction changes, clashes, conflicts
Liaison with Procurement Department to ensure timely order and delivery of materials / machinery and equipments.
Liaison with QA-QC and QS Departments for closing-out open RFI’s and NCR’s for civil works and civil/mechanical interface works.
Proactively respond towards work delays, emergencies, and other problems. Effectively and efficiently organize available workforce
Project: Construction Package 4 - Lusail Development for Primary Infrastructure - Road A1, A6, Southern and Marina Interchanges
Client: Lusail Real Estate Development Company (LREDC)
Consultant: Dorsch; PMC: QPM
Project Value: QR 1, 690m ($ 457m)
Position: Section Engineer
Project comprises of Engineering, Supply, Construction and Commissioning of Roads, Structures, Utilities and Deep Storm Water Micro tunneling works and associated works
The work includes: Construction of grade separated interchanges with underpasses; flyover bridges; Arch in Marina; Construction of District Cooling network, Gas network; New asphalt pavement construction; Construction of a new Storm water drainage system and TSE network; Construction of Deep Storm Water Tunnel 4695m total length, including 15 nos. shafts and 1 temporary shaft for connection to existing; Street lighting, traffic signs, road markings and traffic signals and Landscaping works.
Responsible for daily management, coordination, supervision of work force including multi trade sub-contractors. Reporting and liaising with Section Manager as appropriate.
Collaborate and coordinate with Design team pro-actively for problem solving
Liaison with Procurement Department to ensure timely order and delivery of materials
Liaison with MEP department, HS&E department and QA/QC department in order to ensure civil works been done with respect to project plans and standards, in accordance with established policies, procedures as approved by company, consultant and client.
Development of short term programs for structural works with labor, equipment and plant. Prepare and submit weekly and monthly progress tracking reports
Project: Doha Expressway - Salwa Road - Phase Two (Industrial I/C to Al Asiri I/C)
Client: Public Work Authority (PWA)
Consultant: Aecom; PMC: KBR
Project Value: QR 1, 592m ($ 436m)
Position: Section Engineer
Upgrading existing road to provide four lanes in each direction for the mainline traffic. Constructing continuous service roads network providing a safe and efficient movement between the main line traffic to the adjacent existing facilities.
The works include: Construction of 4 signalized grade separated interchanges along Salwa Road with underpasses - raft slabs and shear walls with embedded services using Horizontal drilling machine; New Asphalt pavement construction for main roads and service roads; Constructing a new positive SW drainage system; Constructing a new TSE network; Street lighting, traffic signs, road markings and traffic signals; Landscaping works.
Responsible for daily management, coordination, supervision of work force including multi trade sub-contractors. Reporting and liaising with Section Manager as appropriate.
Collaborate and coordinate with Design team pro-actively for problem solving
Liaison with Procurement Department to ensure timely order and delivery of materials
Liaison with MEP department, HS&E department and QA/QC department in order to ensure civil works been done with respect to project plans and standards, in accordance with established policies, procedures as approved by company, consultant and client.
Development of short term programs for structural works with labor, equipment and plant. Prepare and submit weekly and monthly progress tracking reports
Project: Dubai Metro Project Green Line Al Qusais Depot Construction
Client: Roads & Transport Authority (RTA)
Consultant: Systra-Parsons
Project Value: USD 330m
Position: Site / Office Engineer
The Scope of work includes construction of all infrastructure and utility works within Dubai Metro Project Green Line main depot the depot including: 13.000 m² of Slab-On-Ground works with 650 numbers of cabling manholes, duct-banks, cable pits and plinths for underground cabling works in coordination with rail team-MHI; Construction of 5km long Fire Fighting network and underground water tank; Construction of 4km long Potable water network; Construction of 3.75km long Contaminated Water network; Construction of 5.6km long Surface Water network; Construction of 1.25km long Chilled water network; Construction of new asphalt pavement within the depot, curb stone works, traffic signs and road markings.
Schedule, manage and coordinate the day-to-day site activities of work force in addition to 2 sub-contractors for External Permanent Utility works and Slab-On-Ground works to meet programme delivery dates.
Assisted senior management in sub-contractor takeoffs; mobilizing and demobilizing equipments and personnel
Reviewed shop drawings to ensure valid and up-to-date information has been passed on to site team and sub-contractors; followed submittal of new/revised design drawings from the Designer (ATKINS); shop drawings by sub-contractors to the Designer for approval and maintained communication regarding design and site work issues
Develop, update, monitor weekly work plans by coordinating with planning team. Prepare and submit weekly progress reports.
Liaison with MEP departments, HS&E departments and QA/QC department in order to ensure civil works been done with respect to project standards, in accordance with established policies, procedures as approved by company, consultant and client
Liaison with QA/QC and QS Departments for closing-out open RFI’s for civil works and civil/mechanical interface works
Project: Water Supply Project of Al-Jufra region
Client: Libyan Arab Jamahiriya
Position: Site Senior Engineer
The scope of work includes: Construction of Sewage Treatment Plant and administrative buildings; Construction of 9000 m3 capacity Underground Water tank; Construction of Remote Pumping station; Construction of 2km long 900 mm dia D.I. Pipeline network
Completion of Master of Science degree with thesis and Military Service
Project: Residential Building Construction Management & Consultancy in different districts of Istanbul
Client: Municipality of Sisli and Kagithane (Istanbul)
Position: Site Inspector
The scope of work includes project management - supervising, monitoring, controlling and inspection of residential building construction in various districts and locations of Istanbul.
Project: Residential and Commercial Building Construction
Client: Individual Investor
Consultant: GEN Project Management & Consultancy Ltd. Istanbul
Position: Site Engineer
This turn-key project consists of 3035 m2 G+4 Residential & Commercial Building civil and arrangement works
Trading of Yale Material Handling machines and equipments
Position: Foreign Trade and Marketing Assistant
Project: Structural calculations and design of Highway bridge and Railway bridge in Corlu, Turkey
Client: MAK-YOL
Position: Structural Design Engineer
The scope of work includes structural calculation and design of a reinforced Highway bridge of 25m span and Railway bridge and approach slabs, columns, beams.
–
–