Work Experience

Total years of experience :38 years, 8 Months

Construction Manager at Ahmadiah Contracting &Trading Co. k.c.s.c.
  • Kuwait - Al Kuwait
  • My current job since November 2016

MPW -RA -264- Alguss street - Infrasturation
CONSTRUCTION MANAGER
MAIN ACTIVITY OF AHMADIAH CONTRACTING& TRADING COMPANY:
TO IMPLEMENTATION BACKWARD MINISTRIES PROJECTS
I AM RESPONSIBLE FOR:
-REPAIRER MATERIALS OF CONTRACT& TECHNICAL STAFF&
EQUIPMENTS AND BUDGET
-APPROVAL OF MATERIALS & TECHNICAL STAFF & SUBCONTRACTORS
AND TIME SCHEDULE FROM CLIENT.
MY MAIN ACHIEVEMENTS IN THIS JOB INCLUDE:
TILTE OF CONTRACT: Supply and Construction and Maintenance of
ULITITIES SUCH STROMWATER &SANITRAY& WATER AND BOXCULVERTS OF WATER& IRRAGATION
IN RA-264 -ALGHOUSE ROAD FROM SAHAH ALSALAM TO 7 TH RING
ROAD
1-Excavation pipe- laying- back filling- test -flush- disinfect and final connecting.
2- Manholes works include concrete &ploy crate and metal works and waterproof works.
3-Special items which need to approve of Subcontractors from Client (Ministry
of Electricity and Water& MINISTRY OF PUBLIC WORKS) such as:
3-A - SHOPWRADING OF ULITITIES SUCH STROMWATER &SANITRAY&
WATER& IRRAGATION
3-1-Survey works and Soil Test
3-2-Wrapping Tape
3-3 MICROTUNNELING OF PIPES
3-4-SHORING AND UNDERPINNING
3-5-BOXCULVERTS OF WATER
3-6- Electrical Works
3-7-Cathodic Protection
3-8-Dewatering Works

Project Manager Infrastructure -Civil Works at Sai General Trading &Contracting w.l.l
  • Kuwait - Joint Operations Wafra
  • August 2013 to December 2015

MAIN ACTIVITY OF SAI TRADING & CONTRACTING COMPANY:
TO IMPLEMENTATION BACKWARD MINISTRIES PROJECTS
I AM RESPONSIBLE FOR:
-REPAIRER MATERIALS OF CONTRACT& TECHNICAL STAFF& EQUIPMENTS AND BUDGET
-APPROVAL OF MATERIALS & TECHNICAL STAFF & SUBCONTRACTORS AND TIME SCHEDULE FROM CLIENT.
MY MAIN ACHIEVEMENTS IN THIS JOB INCLUDE:
TILTE OF CONTRACT: Supply and Construction and Maintenance of 1 x 1200 mm diameter Fresh Water
Pipeline from Alzour WDC II to Wafra Reservoir MEW / 4622 / 2013 / 2015 Which Contain the Items:
1-Excavation pipe- laying- back filling- test -flush- disinfect and final connecting.
2- Manholes works include concrete and metal works and waterproof works.
3-Special items which need to approve of Subcontractors from Client (Ministry of Electricity and Water) such as:
3-1-Survey works and Soil Test
3-2-Wrapping Tape
3-3-Pipe Jacking
3-4-Fiber Optic
3-5-Instruments
3-6- Electrical Works
3-7-Cathodic Protection
3-8-Dewatering Works
THE PROJECT WAS ACCOMPLISHED ON TIME.

Project Manager at Kharafi Nationsl Company
  • Kuwait - Al Farawaniyah
  • September 2001 to August 2013

MAIN ACTIVITY OF Kharafi National :
KHARAFI NATIONAL IS ONE OF KHARAFI GROUP-THE ACTIVITY OF THIS
COMPANY ARE MECHANICAL AND ELECTRICAL WORKS-THEY GAINED I S O 9001 IN 2001 IN KUWAIT
I REPORTED TO MANAGER OF PROJECTS
I AM RESPONSIBLE FOR:
-REPAIRER MATERIALS OF CONTRACT& TECHNICAL STAFF& EQUIPMENTS AND BUDGET
-APPROVAL OF MATERIALS & TECHNICAL STAFF & SUBCONTRACTORS AND TIME SCHEDULE FROM CLIENT.
MY MAIN ACHIEVEMENTS IN THIS JOB INCLUDE:
-Infrastructure for (Water- Drainage-Telephone-Roads-S.T P )- Ministry of Electricity and Water / Ministry of Public Works / Ministry of Defense.
1- Construction of Water diameter from 80 MM to 2000 MM and a length of 400 km includes excavation & back filling, pipe- laying, test, flush, disinfect and final connection.
2-The hydraulic software and hydraulic modeling study for field-A and field-B in Shigaya.
3 -Well Efficiency Test in field-A and field-B in Shigaya.
4-Video Clips & Photo Shots of Underground Well having a Total Depth 1500 feet in Shigaya.
5. Manholes works include concrete, metal works & waterproof works.
6-Construction of drainage diameter from 150 MM TO 1000 MM and a length of 40 km includes excavation & back filling, pipe- laying, test & final connection.
7-Manholes works include Poly Crate. Dia(1000mm-1200mm-1500mm-1800mm-2000mm)
8-Construction of telephone diameter 100 MM and a length of 200 km includes excavation & back filling, pipe- laying, test & final connection.
9-Construction Manholes P T T types S1-S2-S3-S4&L1-L2-L3-L4&T-1-T2-T3-T4&MT2-MT-3-MT4.
10- Maintenance of Runways L 33/15R-33R/15L of Ahmed Al Jaber Military Air Base with (Ministry of Defense). - The project included for:
10- 1 Removing and Installation Fog light for lighting night
10-2 Removing old reinforced concrete area in runway (Landing /Take-off)
10-3 Supply Two Layers from Sand and Gravel Thickness 17.5 cm and backfill up to 98%. for subgrade
10-4 painting M C for subgrade and spread nylon sheet thickness 250 microns before pour reinforced concrete
10-5 pour reinforced concrete area k500 thickness 35 cm in runway (Landing /Take-off) - Quantity 8700m3
10-6 Removing The separation between the asphalt and concrete length 45m width .40 m and made new one from insulating materials after approving from Ministry of Defense
10-7 Cut edges of concrete slabs width 10cm depth 7cm &cleaning & painting and fill insulating materials for runways' concrete area
10-8 Made Core Test Every200m2 for Old Asphalt Runways and taxiway to identify curing locations
10-9 curing Asphalt Runways and taxiway under wearing service
10- 10 Milling &cleaning& painting tack coat and laying Modified Asphalt Runways and taxiway Quantity 780000m2
10-11. Runways were marked as per the international standards
11-Study & Pricing and Successfully Take the Tenders Belonged to Ministries (Electricity and Water / Public Works / Defense). As follows:
11-1-Water network di 80 mm up to 400 mm (Ardiya)- Ministry of Electricity and Water.
11-2-Running Work for the Construction Water Lines & House Service Connections in all areas of Kuwait / Ministry of Electricity and Water.
11-3-Main line DIA 600 mm fresh water in (Abdaliy)- Ministry of Electricity and Water.
11-4-Main line DIA 800 mm fresh water in (AL Zour - Khiran) - Ministry of Electricity and Water.
11-5-Water network di 80 mm up to 400 mm (Al Zahr)-Ministry of Electricity and Water.
11-6-Water network di 100 mm up to 300 mm - Ministry of Defense.
11-7-Water network di 80 mm up to 400 mm (Bayan)-Ministry of Electricity and Water.
11-8-Main line DIA 1600 mm Water treatment in (Wafra Farm)- Ministry of Public Works.
12- Design of water network at Bayan and Sabah Al Salem for Ministry of Electricity and Water.
13-Surveying works for Ministry of Electricity and Water. Tenders.
14- replacement ( line's steel psi 120 dia 40 inch-valves- stain steel fitting-pumps all works completed by welding) inside water pump station-, Shuwaikh
ALL PROJECTS WERE ACCOMPLISHED ON TIME.

ProjectManager at Combine Group Company
  • Kuwait - Al Kuwait
  • May 1993 to August 2001

MAIN ACTIVITY OF CONBINED GROUP COMPANY:
TO IMPLEMENTATION BACKWARD MINISTRIES PROJECTS
I AM REPORTED TO MANAGER OF PROJECTS
I AM RESPONSIBLE FOR:
-REPAIRER MATERIALS OF CONTRACT& TECHNICAL STAFF& EQUIPMENTS AND BUDGET
-APPROVAL OF MATERIALS & TECHNICAL STAFF & SUBCONTRACTORS AND TIME SCHEDULE FROM CLIENT.
MY MAIN ACHIEVEMENTS IN THIS JOB INCLUDE:
Infrastructure for \{Water- Drainage-Telephone\} Ministry of Electricity and Water / Ministry of Public Works / Ministry of Defense.
1- Construction of Water diameter from 150MM to 2000 MM and a length of 600 km includes excavation, back filling, pipe - laying, test, flush & disinfect final connection.
2. Manholes works include concrete, metal works and waterproof.
3-Construction of drainage diameter from 200 MM to 1400 MM and a length of 60 km includes excavation, back filling, pipe - laying, test, final connection.
4- Manholes works include Poly Crate. Dia(1000mm-1200mm-1500mm-1800mm-2000mm).
5-Construction of telephone pipes diameter 100 MM and a length of 200 km includes excavation, back filling, pipe - laying, test, final connection.
6- Construction Manholes P T T types S1-S2-S3-S4&L1-L2-L3-L4&T-1-T2-T3-T4&MT2-MT-3-MT4
7-Study & Pricing and Successes Take This Tender Belonged to Ministry of Electricity and Water / Ministry of Public Works / Ministry of Defense. As Below:
7-1-Water network di 80mm up to 400mm (Al yarmulke)-Ministry of Electricity and Water
7-2-Drainage network 200m HDPE to 500mm HDPE - Ministry of Defense.
8-The Extension of Storm Water Culverts into the sea in Fahaheel, Masseelah & Abu Halifa areas. Ministry of Public Works
8- 1 Construction of cofferdam to isolate sea water from the Box culvert construction activities.
8-2 The Extension of two vent 1.75mx3.2 m Storm Water Culverts into the sea in Fahaheel length 400m
8-3 The Extension of two vent 1.75mx3.2m Storm Water Culverts into the sea in Masseelah length 380m
8-4 Internal and External insulation work for new vent 2x1.75mx3.2m
8-5 backfill by igneous rocks specific weight 2.8 t/m3 on side of new vent culvert(2x1.75mx3.2m)
8-6 removing of cofferdam outside the sea
8- 7 Construction storm water of dia 1600mm concrete with manholes from middle island up to connecting of box culvert with 2km length.at Abu Halifa areas
8-8 Connection of roundabout Abu Halifa to mainline 1600mm in middle island with gullies
8-9 Resettlement of tiles &irrigation network and lighting poles to government agencies
8-10 Cleaning of old Storm Water Culverts 2x1.75mx3.2m length 2km and Construction of 6 access shifts 3mx4mx3m in old Storm Water Culverts 2x1.75mx3.2m
9. Construction &modify & transport water house connection for dia 1/2 inch up 2 inch -20000.No - Ministry of Electricity and Water
9. Construction of sanitary house connection for 150mm-1500 No- Ministry of Public Works
10- Replacement the pumps & lines expulsion & valves and cables for freshwater plant by new ones according to the contract in Ahmad Al-Jaber Air Force Base. - Ministry of Defiance
11- Replacement the pumps & lines expulsion & valves and cables for fire-fighting plant by new ones according to the contract in Ahmad Al-Jaber Air Force Base. - Ministry of Defiance
ALL PROJECTS WERE ACCOMPLISHED ON TIME.

ProjectManager at Canary For Trading &Contracting
  • Kuwait - Al Farawaniyah
  • January 1992 to April 1993

MAIN ACTIVITY OF CANAR TRADING CONTRACTING:
TO IMPLEMENTATION BACKWARD MINISTRIES PROJECTS
I AM RESPONSIBLE FOR:
-REPAIRER MATERIALS OF CONTRACT& EQUIPMENT S& TECHNICAL STAFF and BUDGET
-APPROVAL OF MATERIALS& TECHNICAL STAFF & SUBCONTRACTORS AND TIME SCHEDULE FROM CLIENT
MY MAIN ACHIEVEMENTS IN THIS JOP INCLUDE:
Infrastructure for \{water\}-Ministry of Electricity and Water.
1- Construction Temporary network from New Gelonvaaz Pipes (G.I) dia 2"-3"-4"-6"And connection of mainline
2- Flush and Disinfect. Temporary network from New Gelonvaaz Pipes (G.I) dia 2"-3"-4"-6"
3- CONVERT house connection Dia 1/2 inch -3/4 inch/-1inch-1.5inch-2inch from Old Asbestos Pipes network (A.C) to Gelonvaaz Pipes (G.I)
4-Isolate and Remove Old Asbestos Pipes network (A.C)
5- Construction of Water Ductile Pipe (D.I) Fittings New diameter from 150 MM to 300 MM and a length of 90 km includes excavation, back filling, pipe - laying, Test, flush and disinfect final connection.
6. Manholes works include concrete, metal works and waterproof works.
7. Construction &Modify &Transport water house connection for dia 1/2 inch up 2 inch -600.No

ALL PROJECT WERE ACCOMPLISHED ON TIME

Project Manager at GENERAL SYNDICATE TRADING AND CONTRACTING
  • Kuwait - Al Farawaniyah
  • April 1989 to July 1990

MAIN ACTIVITY OF GENERAL SYNDICATE TRADING AND CONTRACTING
TO IMPLEMENTATION BACKWARD MINISTRIES PROJECTS
I AM RESPONSIBLE FOR:
-REPAIRER MATERIALS OF CONTRACT& EQUIPMENT S& TECHNICAL STAFF and BUDGET
-APPROVAL OF MATERIALS& TECHNICAL STAFF & SUBCONTRACTORS AND TIME SCHEDULE FROM CLIENT
MY MAIN ACHIEVEMENTS IN THIS JOB INCLUDE :
Infrastructure for \{water\}-Ministry of Electricity and Water.
1- Construction Temporary network from New Gelonvaaz Pipes (G.I) dia 2"-3"-4"-6"And connection of mainline
2- Flush and Disinfect. Temporary network from New Gelonvaaz Pipes (G.I) dia 2"-3"-4"-6"
3- CONVERT house connection Dia 1/2 inch -3/4 inch/-1inch-1.5inch-2inch from Old Asbestos Pipes network (A.C) to Gelonvaaz Pipes (G.I)
4-Isolate and Remove Old Asbestos Pipes network (A.C)
5- Construction of Water Ductile Pipe (D.I) Fittings New diameter and a length of 130 km includes excavation, back filling, pipe - laying, test, flush and disinfect final connection.
6. Manholes works include concrete, metal works and waterproof works.
7. Construction &modify &transport water house connection for dia 1/2 inch up 2 inch -400 No.
THE PROJECT WAS NOT COMPLETED BECAUSE OF IRAQ INVASION 1990

SUPERVISOR ENGINEER at -EGYPT-MINISTRY OF CONSTRUCTION AND HOUSING
  • Egypt - Cairo
  • April 1983 to January 1989

Basic Infrastructure Works Of Roads & Services In 6th October City The General Project Of Supplying 6th October City With Water-Owner: New Urban
Societies Authority
-Supervising for :
1-Construction of raw water intake pump station with capacity 1 Million M3/ day include protection bridge inside River Nile.
2- Construction of water treatment plant with capacity 276000 M3/DAY
3- Construction of underground and elevated water tanks.

Education

Bachelor's degree, CIVIL ENGINEERING
  • at AL AZHZR UNIVERSITY
  • August 1981

THEORY OF STRUCTURES ENGINEERING REINFORCED CONCRETE ENGINEERING STRESS ANALYSIS ENGINEERING SOIL MECHANICS & FOUNDATIONS ENGINEERING STEEL BRIDGES ENGINEERING MATERIAL BUILDING CONTRACTIONS ENGINEERING STRENGHT OF MATERIALS ENGINEERING IRRIGATION DESIGN ENGINEERING TRAFFIC & TRANSPORTATION ENGINEERING HIGH WAY ENGINEERING SANITARY ENGINEERING RAILWAY ENGINEERING NAUTICAL ENGINEERING SURVEYING ENGINEERING HYDROLOGY ENGINEERING

Specialties & Skills

Drainage
Infrastructure Projects
Price Forecasting
Maintenance
- Problem Solving Decision Making - Setting Goals - Planning
Training Has Successfully Completed As Below: - Leading and Managing People
- Setting Goals - Planning - Body Language - Controlling & Delegation - Finance for Non- Fina
- Quantity Surveying - Contract Negotiation
construction of underground tanks in kuwait (M.O.D)
construction of intake raw water in big city 6th october- egypt

Languages

Arabic
Native Speaker
English
Intermediate

Memberships

Kuwait society engineers
  • engineer - 11548
  • January 1989

Training and Certifications

Finance for Non- Financial Project Managers (Training)
Training Institute:
ERNST&YOUNG TRAINING, Kuwait
Date Attended:
January 2012
Duration:
40 hours
Management Training kharafi National, Kuwait (Training)
Training Institute:
kharafi National, Kuwait
Date Attended:
January 2010

Hobbies

  • CIVIL ENGINEERING&CONSTRUCTION
    - Project Estimation - Quantity Surveying - Contract Negotiation - Construction of Water Treatment –Water Networks – Water mainline Between Stations –Underground and Elevated water tanks - Construction of storm water culverts in sea - sanitary treatment planet - Construction of intake raw water planet capacity one million m3/day - Buildings Maintenance- Roards maintenance