حامد Razzak, Project Manager

حامد Razzak

Project Manager

Saudi Arabian Parsons Limited (SAPL)

البلد
المملكة المتحدة - لندن
التعليم
ماجستير, Materials Engineering
الخبرات
19 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 3 أشهر

Project Manager في Saudi Arabian Parsons Limited (SAPL)
  • المملكة العربية السعودية
  • أشغل هذه الوظيفة منذ

Infrastructure Works). I am responsible for overseeing the project management
and execution of the whole works by planning, directing, supervising and controlling the different
departments (contract, project control, health, safety & environment, administration and
construction) for completing the works within budget and on-time. Also advices and directs the client
on all technical and contractual matters.
A) MODON Jeddah 3 Projects for the Saudi Industrial Property Authority (MODON);
Infrastructure Works. SAPL was contracted with MODON for providing Supervision Consultancy
Services for several projects in Jeddah, KSA.
On-going Projects:
1) Link Roads Project. The cost of this project is SAR 120 million. This project involved the
construction of 42km of roads, bridge & two interchanges and box culverts.
2) Infrastructure Project. The cost of this project is SAR 100 million. This project area is 5.9
million m2 and involved the construction of 37km of sewer and a pumping station, 46km of
storm and 4 no. ponds, 36km of potable water and 32km of telecom.
B) Completed Project. North Jeddah Airport Project for the Ministry Of Housing (MOH);
Infrastructure Works. The cost of this project is SAR 338 million. SAPL was contracted with MOH
for providing studying, designing and supervision services for 11 projects throughout KSA. I am
responsible for overseeing the project management and execution of the whole works for North
Jeddah Airport Project. This project area is 2 million m2 and involved the construction of 15km of
sewer, 30km of storm, 24km of potable water, 16km of irrigation, 57km of MV electric, 70km of
telecom and 22km of roads.
2010

Senior Project Manager في AL HABTOOR LEIGHTON GROUP
  • الإمارات العربية المتحدة
  • يناير 2009 إلى يناير 2010

Managed the overall budgeting, planning, execution and handover of several
projects (eight projects running at the same time) for the structural steelwork erection with over 350 staff and
labour on different sites. Liaised with the engineering and procurement departments on the design, drawings
& materials delivery and the commercial department for payments, etc. Managed subcontractors and
suppliers. Dealt with clients for all contractual and site issues. Completed projects safely, to the agreed
quality, on time and within budget.
Managed the following major projects: a) Abu Dhabi Financial Centre, Abu Dhabi, 1500 tonnes. b) The Land
Mark Tower Project, Abu Dhabi, 1200 tonnes. c) Jafza Convention Centre and Office & Hotel Complex,
Dubai, 1700 tonnes. d) Al Ghurair City Expansion (phase II), Dubai, 600 tonnes. e) Paris Sorbonne University,
Abu Dhabi, 850 tonnes. As well as other projects.

في AL NABOODAH CONTRACTING LLC
  • الإمارات العربية المتحدة
  • يناير 2008 إلى يناير 2009

2009: Storm water, Drainage and Sewerage System (Phase 1) - Contract 103A - Dubai World

Client في Central International Airpor
  • الإمارات العربية المتحدة
  • يناير 2008 إلى يناير 2009

The cost of this contract was £120.0 million. DCA form of contract.
Project Manager (Infrastructure/Airport Works). This contract involved the construction of the
infrastructure works for the airport, 102 km of storm water, 49 km of sewer and 90 km of irrigation pipelines
and associated manholes. Also 6 no. ponds, the underground pumping stations and oil water separators and
the associated electrical and mechanical works.

Co-ordination Manager في Dubai International Airpor
  • الإمارات العربية المتحدة
  • يناير 2007 إلى يناير 2008

Expansion Phase II - Contract AX125, Concourse III
Structural Steelworks. Client

Co-ordination Manager في Dubai International Airpor
  • الإمارات العربية المتحدة
  • يناير 2003 إلى يناير 2007

Expansion Phase II - Contract AX060, Concourse II,
Terminal III and Car Park Structural Steelworks. Client

Planning Manager
  • يناير 2001 إلى يناير 2003

Channel Tunnel Rail Link - Contract 320. Hochtief - Murphy Joint Venture. The
cost of this project was £160 million.

Senior Planning Engineer في Head Office
  • الإمارات العربية المتحدة
  • يناير 1997 إلى يناير 2000

A Variety of Tunnelling/Civil/Infrastructure Works

Sewer في Thames Water Utilities Ltd
  • يناير 1995 إلى يناير 1997

Cray Valley Foul

في London Electricity
  • يناير 1993 إلى يناير 1994

to Pimlico Cable Tunnel. Client:

Assistant في Sir William Halcrow and Partners Consulting Engineers
  • الإمارات العربية المتحدة
  • يناير 1992 إلى يناير 1993
Site Engineer في Thames Water Utilities Ltd
  • يناير 1991 إلى يناير 1992

London Water Ring Main - Stage 5. Client:

Site Engineer في Thames Water Utilities Ltd
  • يناير 1989 إلى يناير 1991

London Water Ring Main - Stage 2. Client:

Senior Engineer في 2012 DGC JLT CONSULTING
  • الإمارات العربية المتحدة
  • إلى

Oil & Gas Works). Managed the preparation of post well assessments and
recommendations for BP (British Petroleum), for the oil wells top-hole-section to maintain stability and
2
formation integrity, for the Southern Caspian Sea offshore oil wells in Azerbaijan. This included reviewing
drilling parameters and observations during the pre-drill planning, drilling and post well assessments.

الخلفية التعليمية

ماجستير, Materials Engineering
  • في University College of Swansea
  • يناير 1988

بكالوريوس, Civil Engineering (Hons)
  • في University College of Swanse
  • يناير 1986

Specialties & Skills

BUDGETING
CABLEADO
CUSTOMER RELATIONS
DEPARTMENT FOR CONSTITUTIONAL AFFAIRS
ENGINEERING
FINANCIAL
MECHANICAL
MICROSOFT WORKS

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

ICE, UK
  • Chartered Engineer
  • December 1999