Construction Site Manager
SGB BRANDSAFWAY
Total years of experience :10 years, 7 Months
and have been associated with following projects.
1). GAIL-ARC Cross country pipeline project. (2727KM APPROX.)
A. PHULPUR HALDIA PIPELINE PROJECT-PHASE-1A, 1B, II
B. AURIYA TO PHULPUR PIPELINE PROJECT.
C. PRP CAUVERY BASIN PIPELINE PROJECT.
D. PRP GUJARAT PHASE-I, II.
E. KOCHI MANGALORE PIPELINE PROJECT
and have been associated with following projects. During this entire tenure I have worked on ‘OptiPlant’ a tool by help of which user could be able to Model Equipment, Structure and Piping for his Design Engineering requirements as in FEED Jobs, Pre-FEED Jobs also in Detailed Design Engineering.
MAJOR PROJECTS HANDLED
1). Front End Engineering Design (FEED) - Toyo Mumbai
2). Detail Design Engineering - Worley Parson Houston (U.S)
and have been associated with following projects. During this entire tenure I have worked on as Project Management(PM), MS Projects; Project Planner and Management tool
and have been associated with following major projects; also design, manufacturing, supply, erection of PEB, GREEN Building
Bio-Fuel Diesel Motorcycle (6 months): In B.Tech Final Year
The purpose of the project was to provide an additional energy sources as Biomass (Jatropha Curcas an Herb) as Fuel, as well as developed an suitable engine which is running on Blends of Jatropha and Diesel as Bio-Diesel.(B40).It will prove an lesser polluting fuel, and meet the increasing demands of fuel in future for our upcoming generation.
Summer Training (45 Days): In I.O.C.L Mathura Refinery in Thermal Power Station (TPS), in B.Tech Pre-Final Year
M.tech in Machine Design.