حسن رياض, Mechanical Engineer

حسن رياض

Mechanical Engineer

Saudi Bin Ladin Group (Hamad International Airport)

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
4 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :4 years, 2 أشهر

Mechanical Engineer في Saudi Bin Ladin Group (Hamad International Airport)
  • قطر - الدوحة
  • مارس 2013 إلى مايو 2015

Project Name: New Doha International Airport, Doha, Qatar
Project Scope: Central Utility Plants, Utilities and Waste Water Treatment Plant (WWTP)

I was responsible for Project Execution by Installation, Erection & Commissioning of following Mech. Equipment:

• York MaxE Centrifugal, Water-cooled Chillers (2500 TR capacity) and Induced Draft Cooling Tower
• York Air Handling Units (York YMA VAV & CAV Chilled Water Air Handling Units, FCU’s)
• Potable & Fire Water Pumping Stations (Both electric & diesel engine driven)
• Ductile Iron (D.I), High Density Polyethylene (HDPE), Copper, Black Steel Piping & Plumbing Systems
• Fire Fighting System (FM 200, Fire Hydrants, Sprinkler System, Pre-action Sprinkler System)

Key Responsibilities:

• Installation, Testing, Balancing and Commissioning of HVAC, Plumbing and Fire Fighting System.
• Responsible for the execution of the project under Project Manager to achieve project deliverables within time & cost constraints. Also to ensure high quality and safety standards.
• Manage a team of foremen, welders, riggers, scaffolders, millwrights, pipe fitters and plumbers to ensure that all works are performed according to manufacturer recommendations.
• Construction supervision and management of all mechanical activities including equipment installation, piping fabrication, installation, testing, heaving lifts and transportation plans.
• Testing, Adjustment and Balancing of Water and Air Distribution in ducting for Air Conditioning System.
• Check and review of equipment layouts, plot plans, GA drawings, detail drawings, piping plans, piping isometrics and piping & instrumentation diagrams (P&ID’s).
• Review project plans and proposals. Identify project responsibilities by determining the phases and elements of the project. Incorporate change requests in the execution activities as well.
• Planning, Procurement and Inspection of tools, equipment and critical/routine spare parts within budget.
• Prepare documents such as presentation materials for meetings and follow up of the results of meetings.
• Prepare status reports and regularly monitor budget and schedule. Allocate project resources appropriately.
• Perform routine HS&E audits to ensure that work is being performed in accordance with project requirements.
• Participate in STARRT talks to inform workers of risk associated with their assigned tasks.
• Ensure Log-Out/Tag-Out System is in place and its procedures are observed during project works.
• Ensure that permit is obtained for live systems requiring isolation for installation services and that isolated systems shall be re-activated after completion of works with proper close-out of permit.
• Ensure quality of mechanical deliverables during equipment installation, piping fabrication/installation and commissioning. Review the procedures to complete these activities.
• Responsible for Engineering Management of multi-discipline as well as single discipline jobs.
• Participate in Client meetings and Vendor meetings to solve problems during project execution.

Project Engineer في Shakarganj Mills Limited
  • باكستان
  • يونيو 2011 إلى مارس 2013

Worked as Project Mechanical Engineer to manage New Projects and Modification of existing installations. Major equipment on which I worked are:

 Medium and High Pressure Field Erected Boilers (80 T/H x 3: 25 bar, 350°C), (100 T/H x 1: 65 bar, 500°C)
 Steam Turbines
 Pumps and High Pressure Piping

Major Projects:

• Installation, Erection and Commissioning of field erected 35 Tons/Hour Boiler (60 bar, 480°C) by modification of existing 25 T/H boiler (ASME Boiler and Pressure Vessel Code, BPVC-1)
• Erection and Commissioning of 3MW (60 bar, 480°C) & 15MW (65 bar, 500°C) Chingdao Steam Turbine
• Design modification of two existing 80 Tons/Hour (25 bar, 350 °C) Yoshimine design boilers by installing Economizer Coils to increase the thermal efficiency of boiler up to 2% (ASME BPVC-1)
• Installation of high pressure boiler feed water pumps and associated piping
• Design feasibility of Pulverized Coal conversion for 100 Tons/Hour (65 bar, 500°C) bagasse fired boiler

Key Responsibilities:

• Planning, executing, monitoring & control and closing of projects as project incharge to enhance the efficiency of existing systems or to meet business objectives for new projects.
• Design and estimate feasibility of a project and its payback period. Do necessary calculations to support the feasibility of new/modification project.
• Planning of approved project to finalize the scope. Sequence activities and assign resources to produce a project timeline and cost estimates.
• Prepare Bill of Materials, Bill of Quantities and Equipment specification.
• Procurement and Inspection of tools, equipment and critical/routine spare parts within budget.
• Review contractor bids; interview and assign personnel to specific phases and elements of the project through project coordination and kick-off meetings. Oversee and coordinate the technical aspects of the project.
• Prepare status reports and regularly monitor budgets, contractors and schedules. Allocates project resources appropriately and mitigate the risks associated with the project.
• Present procedures, rules and regulations to those involved in the project; maintains a safe & clean environment.
• Ensure compliance with Lock Out/Tag Out procedures to ensure safe and risk free work.
• Coordinates the development of procedures for commissioning of relevant Projects together with Operations.
• Manage the erection and commissioning phases of projects by ensuring good supervision, planning, co-ordination, safety planning and quality assurance.

Internee في Atlas Honda Limited
  • باكستان - لاهور
  • مايو 2010 إلى يونيو 2010

Worked as Internee and experienced the manufacturing, casting and machining of Bike parts along with their assembly. Internship Project: Designed a jig to optimize the assembly time of rear wheel sprocket from 4 min. to 1 min.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في University of Engineering & Technology, Lahore
  • يونيو 2011

RECORD 2007 - 11 University of Engineering & Technology, Lahore B.Sc in Mechanical Engineering CGPA: 2.94/4.0

الثانوية العامة أو ما يعادلها, Pre Engineering
  • في Faran Model College
  • مايو 2007

2005 - 07 Faran Model College, Jhang F.Sc - Pre Engineering Result: 87%

الثانوية العامة أو ما يعادلها, Science
  • في Govt. Model High School No.1
  • مارس 2005

2003 - 05 Govt. Model High School No. 1 Sargodha Matriculation - Science Result: 85%

Specialties & Skills

Air Conditioning
HVAC Design
Project Management
Fire Fighting
BOILERS
Steam Turbines
MAINTENANCE
OPERATIONS
Project Management
Piping Fabrication & Erection
NFPA, ASME, API, ANSI, ASTM Codes and Standards

اللغات

الانجليزية
متمرّس

العضويات

ASME
  • Member
  • March 2012

التدريب و الشهادات

HVAC Design (الشهادة)
تاريخ الدورة:
March 2015
صالحة لغاية:
January 9999
Project Management (الشهادة)
تاريخ الدورة:
March 2015
صالحة لغاية:
January 9999
Bearings and Causes of their Failure (تدريب)
معهد التدريب:
SKF
تاريخ الدورة:
January 2013
المدة:
6 ساعات
Boiler Efficiency Optimization (تدريب)
معهد التدريب:
PSST Convention
تاريخ الدورة:
April 2012
المدة:
2 ساعتين
Confined Space Activities (تدريب)
معهد التدريب:
SBG Safety Department
تاريخ الدورة:
April 2014
المدة:
4 ساعات
LOTO (Lock Out and Tag Out) (تدريب)
معهد التدريب:
SBG Safety Department
تاريخ الدورة:
May 2014
المدة:
4 ساعات
Hazard and Risk Analysis (تدريب)
معهد التدريب:
SBG Safety Department
تاريخ الدورة:
March 2014
المدة:
3 ساعات