Work Experience

Total years of experience :22 years, 2 Months

Construction Manager at UNITED GULF CONSTRUCTION COMPANY
  • Kuwait - Al Kuwait
  • September 2019 to March 2022

Project Name:Contract RA/259 Construction completion and manintenance of Road and interchanges on the existing 6th Ring Road to interchange 82.
Project Volue:493.600.000 USD.
Earth works including excavation and embankment.
Total Road Length: Main Express way 22km.
Construction of dual (3 lanes and 4 lanes) express ways
Construction of 4 Intersections (IC 82 (3 Levels), IC 87, IC 92 & IC 98)
Construction of Bridges 3 Nos. P1, R1 and Railway Cross Bridge
Reinforced concrete storm water Box culverts
Bridge Bearings and Expansion joints
Post-tensioning and precast Girders.
Bridges Drainage works
RC piling works (Dia 1050mm and 1200mm)
Removal of existing structures such as but not limited to box culverts
Road work including Sub-grade preparation & Aggregate Base course
Asphaltic concrete pavements including prime coat and tack coat
Road marking and signage.
Speed cameras, VMS, ATS reservation and CCTV
Gantry Signage, NJ Barriers, Guard Rails, Highway chain link Fence
MSERW works
Thermal and Moisture protection Works
Street lighting and Cablings works,
Bridge under lighting and OH signage lightings works
Construction of Water pipe lines, Storm water drainages, Telephone works
KOC protection (Concrete Box Culverts)
Construction of the necessary civil works for the relocation/protection of existing utilities.
Relocation of HT and LT overhead lines
Demolition of existing pavement
Construction and maintenance of temporary traffic detours necessary for the construction of other works.

Construction Manager infrastructure works at Limak construction company
  • Kuwait
  • September 2018 to September 2019

Kuwait international airport project
Kuwait
Project cost;4.6 bilion USD

EARTH WORKS AND MICRO TUNNELING WORKS MANAGER- at KOLIN CONS-SALINI IMPREGILO JV.
  • Kuwait - Al Kuwait
  • October 2016 to July 2018

This covers the construction work of the main Roads and main infrastructure of the South Al Mutlaa City that would be
newly developed on an area of approximately 100 km2, located at the south of Kuwait city on where 350.000 people will live.
Project Cost:288.000.000 Kuwaiti dinar kwd.
Within the scope of the foregoing work, there are;
· Earth works:
route excavation and embankment on an of 6.6 million m2 area
21.000.000 m3 cut and 6.150.000 m3 fill.
structural excavation within 9.8 million m3
· Road Works:
sub base, base, bituminous treated base & asphalt works on an area of 4.8 million m2
61 roundabouts
34 junctions
· reinforced concrete manufacturing:
Construction of 18 bridges
micro tunnelling Works:
Q200-Q2400 TOTAL LENGHT:39000 m
Oversee and direct construction projects from conception to completion
• Review the project in-depth to schedule deliverables and estimate costs
• Oversee all onsite and offsite constructions to monitor compliance with building and safety regulations
• Coordinate and direct construction workers and subcontractors
• Select tools, materials and equipment and track inventory
• Meet contractual conditions of performance
• Review the work progress on daily basis
• Prepare internal and external reports pertaining to job status

Construction Manager at Yuksel Saudia Construction Co.Ltd
  • Saudi Arabia - Riyadh
  • October 2014 to July 2016

Name Of Work:Municipality Of Riyadh-Storm Water Drainage Network Of, Naseem Area Project
Scope Of Work:
Project Value:688.000.000 SAR
GRP pipe Line:126, 3 km (Q300 mm-Q1200 mm)
1232 Manholes, 3350 catchbasins
Precast box culvert Installation : 223.785 m3
Asfalt works:413.249 m2
Excavation Works:2.029.170 m3
Micro Tunneling Works:
Q1200-2200 mm

Construction Manager at PALYE ENGINEERING -HELIN CONSTRUCTION
  • Türkiye - Kayseri
  • May 2013 to September 2014

Name Of Work:Sivas Kangal Catkoy Irragation Pond
Scope Of Work:728 ha of irrigated farmland irrigation and drainage network of the construction work of the building.
HDPE100 Pipe Line:26.955 m
GRP Pipe Line:2853 m
Opening Darinage Channels:17.521 m(5 kavsut cons, 9 discharge channel)

Construction Manager at GINTAS CONS.
  • Türkiye - Kayseri
  • May 2011 to May 2013

Construction of Technology Development Zones in Gaziantep, Kayseri and Elazig Lot 2 - Construction for Erciyes TDZ
Construction of landscape, all infrastructure works, a cast-in-place construction 10 260 m2 building in Kayseri and
2 000 m2 building in Yozgat;

Construction Manager at Doruk Engineering and Construction Company.
  • Türkiye - Kayseri
  • May 2004 to May 2011

Position Held:Construction Manager
Name Of Work:Renk Plastic Factory Cons, ABC Transportation Factory Building, All araund the turkey many factory and prefifabricated beams many of bridge……………………………………………………………………………………………………………….
Kayseri Airport Construction, Highways 6.Religion Manegement 63.Department Management

Construction Manager at NIGBAS A.S
  • Türkiye - Kayseri
  • December 2000 to May 2004

Store, Wards, Arsenal, Mess Hall building, Heat Center……etc
Construction Zone:26.000 m2
4.Commando Prefabricated Housing Facilities Construction Brigade
Prefabricated Bridge Beams, Factory Building and Construction........
The factory and buildings across Turkey

Site Engineer at YUKSEL CONS.COMPANY
  • Türkiye - Antalya
  • July 1998 to July 1999

Name Of Work:Antalya Water Supply and Sanitation Project
Scope Of Work:Waste Water Concrete Pipe:30.000 m(Q200-Q600 mm)

Education

Bachelor's degree, CIVIL ENGINEERING
  • at Yildiz Technical University
  • July 1998

Civil Engineer

Specialties & Skills

Management
Infrastructure Projects
Construction
MICROSOFT OFFICE
MICROSOFT WINDOWS 2000
MICROSOFT WORKS
AUTOCAD

Languages

Arabic
Beginner
English
Expert

Memberships

KUWAIT SOCIETY OF ENGINEERS
  • MEMBERSHIP
  • March 2017
TURKEY SOCIETY OF CIVIL ENGINEERS
  • MEMBERSHIP
  • July 1998

Training and Certifications

HEALTH AND SAFETY (Training)
Training Institute:
YUKSEL CONS COMPANY
Date Attended:
June 2014
Duration:
72 hours

Hobbies

  • Basketball