Senior electrical engineer
Kbr Inc. - Saudi Arabia
Total years of experience :13 years, 0 Months
I am Responsible for the power system study using ETAP Software which included load flow, short circuit, motor starting, system protection co-ordination and arc flash analysis to evaluate the adequacy of existing system & the selected ratings of new distribution system components to be added.
- Studying the overall integrity of the power system using a computer program called ETAP
(Electrical Transient Analyzer Program).
1- Load flow analysis
2- Short circuit study
3- Protective Relay Coordination Study
4- Motor Starting Study
5- Arc Flash Study.
6- Grounding Study
- Prepare Electrical equipment sizing, Load List, Cable & Conduit Schedule
- Prepare Material Take off (MTO), Electrical Equipment data sheets, Document Control Log (DCL),
Scope of work (SOW), & List of deliverables (LOD)
Participate in developing equipment layouts, lighting layouts, grounding layouts, cable routing
layouts
Feb 2014 - Jul 2016 Electrical Engineer, SNC-LAVALIN FAYEZ ENGINEERING (SLFE), Al Khobar
Assigned as an electrical Design Engineer on Detail/Conceptual Design for submission to the proponent for construction or Issued for Bid package, insuring all design requirements are completed and met.
Responsible for the power system study using ETAP which included, load flow studies, short circuit analysis, system protection co-ordination, and other electrical calculations including cable and transformer sizing, grounding, cathodic protection, equipment specifications and scope of work. The detailed work was for the following projects:
- Reviewing Project MTO
- Residential Housing Dhahran - Package 1 & 2
- ETAP Models Update and Relay Coordination Study.
- Upgrade Ethan Facility - Ju’aymah NGL Fractionation Plant.
- Replace Utility Package Boiler - Berri Gas Plant.
- Project Management Services for OMPPD Inventory Analaysis for Abqaiq & Juyamah Warehouses.
- Providing input and supporting project estimation team
• perparing and designing electrical power layout, cable layout, lighting layout and grounding layout.
• preparing material take off (MTO) for lighting and grounding material.
• preparing technical bid of evaluation (TBE)
• preparing material requistions
• review quotation from Vendor
ECDP (Engineer Competency Development Program)
Summer Training Program. To provide Assisting in electrical power distribution system design, maintenance supervision.
• Providing construction support
• Resolving onsite clashes
• Lighting sizing calculation
• Verifying load calculation
• Checking cable sizing
- Graduated student from King Fahd University of Petroleum and Minerals, June 18, 2011. - BS in Electrical Engineering. - Admitted to a one year preparatory program in general studies, mainly English and math. - I have finished senior project which about design and implementation of a controller that adjusts the position of a DC Servo Motor. Also, I have taken three elective courses which are EE 462 (Electric Machines), EE 463(Power System Analysis) and EE 466 (Power System Protection).