Structural Engineer
DAR AL Handasah (shair & partners)
Total years of experience :18 years, 10 Months
Hurghada International Airport :
- Main Terminal Building
- Apron
- New Runway
- Upgrading for Existing Runway
Ghazala Intercontinental hotel.
-Cost = 300, 000, 000 $
-Height = 32 m (8 floors)
-Area = 9000 m²
Two High Rise Buildings
-Tadamon Twin Towers.
Description:
Cost =65, 000, 000 €
Height = 137 m (34 floors)
Area = 3420 m²
-Burj EL-Ghathafi .
Description:
Cost = 200, 000, 000 $
Height = 184 m (46 floors)
Area = 12, 600 m²
-CPC Industrial Park Project, 6 October City, Egypt. control point and Benchmarks Observations and adjustment, mapping, volume computation and setting out, (2007 -2008).
-As Built Surveying For Many structural elements and digital map production (two villas on mansorya canal - many villas in Sharm El-shekh - TB3 building) (2007).
-Digital base map preparation and database for land uses compatible with Geographic Information System (GIS) for Minia Governorate 1400 sq. km.using Ikonos satellite images. Work includes GPS positioning and Satellite image rectification, (2006).
-Cairo International Airport, Construction of a third new runway Class "E" With Length 4000m and 15 Service Roads and, control Point Observations and adjustment, mapping, volume computation and setting out, (2006 -2008).
-Planning and detail survey using satellite images and GPS ground control survey for the a proposed Upper Egypt - Red Sea Road with a total length of 360 km along with quantity calculations, (2006).
-Owner: Prince Al-Waleed Ibn Talal
Project of rehabilitation of Cinema Rivoly. Detail Survey registration and map production for Cinema Rivoly building with its structural elements (October 2005 to January, 2006 ).
-Madinaty City with area 8000 feddans (approx. 34 sq. km.) GPS ground control survey and cadastral for the city as an extension to New Cairo Satellite City along Cairo Suez road, (2005 - 2006).
-Planimetric survey and digital map production for Fowa bridge crossing the Nile river between Fowa and Al-Mahoudia. The work includes hydrographic survey for the Nile river bed across the bridge centerline, and GPS Positioning, (2005).
-Detail survey and longitudinal levelling and digital map production for the Project For supplying water for North of Faisal street, within Cairo City, total area 2500 fed (2005 - 2006).