QC Manager
Italian-Thai.co.th
Total years of experience :24 years, 5 Months
Preparing ITP & Method statements for this project
• Materials submission to consultant for approval
•Control QC and site management
•Update and checked status of all documents
•Summary of monthly report
•Issued NCR and close out
•Solving and discussion with consultants
Coordinate as well as survey check
Set out bolt & concrete level check before cast
Identify check before erection
Steel structure alignment & level check
Supervise on site
Drawings combine between civil & mechanical
Prepare quality plan & Inspection test plan
•Concrete mix design submittal
•Conduct control activities as proposal
•Propose Atterberg limit test, CBR & compaction test for approved
•Inspection of structural works with consultant representative
•QA/QC filling and documentation
Contact client and contractor
•Bill of quantity and drawing check
•Conduct control laboratory and survey
•Documents work / filling
Monitoring all site construction and inspection when required instructed by the Consultant (Systra & Parson)
• Working with the civil Tunnel Engineers with dealing with the contractors regarding project activities such as the construction, installation maintenance support documentation and testing activities to ensure compliance with specification, codes and clients requirements
•Ensure works follow the approved drawing and specification pertaining to quality & safety
•Monitoring such as TBM navigation earth pressure trust force and penetration rate grout pressureand volume, Ring selection and installation
•Conducting tests for conditioning polymer and foam, plasticizers and accelerator to be used in Tunnelling
•Follow up on materials testing ensure tests are verified to meet the requirement of the specification, and carry out analysis of results
•Maintaining shift reports, TBM operation records ring plane check and grouting reports etc.
•Conducting QC inspection for civil of underground station
•Deep of bore pile, rebar check before concrete casting
•During concrete cast check density and viscosity of bentonite
•Thickness of paint inspection with consultant
•Verified of materials on site as per project specification
•All finishing works inspection
Site supervising of tunnel/gallery drilling work, grouting works in tunnel/gallery
•Rock bolt installation, wire mesh and shotcrete work
•Rock blasting, disposal and hauling of backfilling material
•Material control
•Revised/up date the construction drawing and method statement
•Material testing for concrete/shotcrete/grouting material
•Interface with the client for site inspection and hand over
Laboratory testing and control of testing material ( soil & concrete )
•Collect the material samples and testing in the laboratory and site for backfilling material :
•Sieve analysis test
•Atterberg limits test
•Density test
•Standard proctor test
•Modified proctor test
Concrete mix design material test
•Aggregate test
•Compressive strength test
• Rebar tensile strength test
•Etc.
•Document work and filing
Supervising/control of rock tunnel drilling/blasting
•Installation of rock-bolt, shotcrete, lining concrete
•Contact with consultant/owner
•Manpower, material and machine utilizing
•Document work / filing
Site supervising and control of structural works for post tensioning system in the main passenger/car parking buildings
•Proceed the intensive inspection prior to concrete mass work for rebar installation, form work as well as survey check
•Responsible for as-built drawing and prepare the site inspection and checklist
•Conduct control of driven pile foundation
Supervising and control of foundation improvement (drilling/grouting).
•Grouting work and laboratory testing
•Backfilling material compaction testing and sampling
•Control for source of filling material
•Conduct of site inspection and revised the method of construction and drawing
•Concrete RCC work
•Check area before RCC casting
•Control concrete sleeper of up stream / down stream
•Control of building works of Bank of Bangkok
•Rebar fabrication, formwork installation
•Concrete pouring and quality control
•Daily report / monthly report for work progress
and consumption of material and manpower
Control of building works of Bank of Bangkok
•Rebar fabrication, formwork installation
•Concrete pouring and quality control
•Daily report / monthly report for work progress
and consumption of material and manpower
Site supervising for cut & open of soil disposal
•Filling work and compaction for (earth dam)
•Preparation prior to density test
•Material and manpower control
•Checklist and filing work
•Daily report for manpower material and machine utilization
•Report to manager regarding work progress and delay
•Etc.
Control of structural of spillway
- Rebar fabrication, formwork installation
- Concrete casting and quality control
- Daily report/monthly report for work progress and
consumption of material and manpower
Project Ethanol Plant 200, 000 lpd Chacheongsao
Management sub- contractor of civil work
•Location / deep / rebar / of bored pile as per drawings
and specification
•Dimension / rebar / and level check with sub contractor
Control & monitoring for quality construction of factory
•Conduct control of raw materials for testing
•Control of any test of sleeper
•Monitoring work procedures for compliance with
project specifications
•Will interact with client representative at factory
•Data filling for test results and report to above mention
•Prepare ITP and submit to owner for approved
•Quality manual prepare for STRABAG facory
•Quality control of raw materials (fine & coarse aggregates)
•Perform design mix for submit to owner
Building