حسن التلب, Project Management Consultant -Construction Manager

حسن التلب

Project Management Consultant -Construction Manager

Hill International

البلد
المملكة العربية السعودية - المدينه المنوره
التعليم
بكالوريوس, Civil Engineering
الخبرات
14 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 11 أشهر

Project Management Consultant -Construction Manager في Hill International
  • المملكة العربية السعودية - المدينه المنوره
  • أشغل هذه الوظيفة منذ نوفمبر 2021

Client: Rua Al Madinah Holding (Subsidiary Company of Public Investment Fund)

Project: Developing the advanced infrastructure of Madinah Central Area

Project Budget: 0.4 billion Saudi

Project Scope: Provided project management consultation.

Responsibilities:

• Project Management Plan Development: Collaborate with project teams to develop a comprehensive Project Management Plan (PMP) that outlines Project objectives, processes, methodologies, risk management, and communication strategies.
• Project Management Information System (PMIS) Development: Establish and maintain a robust Quality Management Information System for the organization, outlining policies, procedures, guidelines, and documentation to ensure consistent quality across projects.
• Quality Audits: Plan and conduct regular internal audits to evaluate project compliance with quality standards, policies, and procedures. Identify areas for improvement and initiate corrective actions.
• Process Improvement: Continuously review and improve quality processes, methodologies, and best practices to enhance project outcomes and efficiency.
• Quality Training: Develop and deliver quality training programs to project teams, emphasizing the importance of quality assurance practices and procedures.
• Subcontractor Performance Monitoring: Monitor and assess the quality performance of subcontractors and vendors, ensuring they adhere to established quality standards.
• Client Satisfaction: Monitor client satisfaction related to Project aspects and take action to address any concerns or issues promptly.
• Quality KPI Reporting: Prepare regular quality performance reports, highlighting key quality metrics, trends, and improvements to share with project stakeholders.
• Risk Management: Identify potential quality-related risks and develop strategies to mitigate them, ensuring that projects are delivered with minimal risk of defects or non-compliance.
• Non-Conformance Management: Manage the identification, documentation, and resolution of non-conformance issues, ensuring appropriate corrective and preventive actions are taken.
• Root Cause Analysis: Conduct root cause analysis for quality incidents and develop strategies to prevent recurrence.
• Change Management: Manage changes to project plans that could impact quality, ensuring that proper procedures are followed to assess and mitigate potential risks.
• Continuous Improvement: Promote a culture of continuous improvement by encouraging team members to provide feedback, suggest enhancements, and implement innovative solutions.
• Communication: Collaborate closely with project managers, engineers, architects, subcontractors, and stakeholders to ensure alignment with quality goals.

Quality Assurance Representative في Parsons - Saudi Arabia
  • المملكة العربية السعودية - تبوك
  • ديسمبر 2017 إلى نوفمبر 2021

Client: US Army Corps of Engineers

Project: Military Airbase Construction complies with US Army Corps Engineers

Project Budget: Confidential


Project Scope: Consultancy Technical Support for Supervising USACE Construction Projects

Responsibilities:

• Quality Standards Compliance: Verify that construction projects adhere to USACE quality procedures standards in three-phase inspection (Preparatory- Following Up, and final Inspection).
• Documentation Review: Review project documents, technical submittals, drawings, and plans to ensure accuracy and compliance with quality standards for each project’s DFOW \[Defined Features of Work\].
• Inspection and Testing: Coordinate and oversee inspection and testing activities, ensuring that all required tests are conducted and documented accurately.
• Deficiencies (NCR): Identify and address non-conformance issues, discrepancies, and deviations from project specifications. Initiate and manage NCRs as necessary.
• Quality Plans and Procedures: Develop and review project-specific Quality Control Plans (QCPs) and Inspection and Test Plans (ITPs) to ensure they align with project requirements.
• Collaboration: Work closely with project managers, engineers, contractors, subcontractors, and stakeholders to resolve quality-related concerns and promote a culture of quality.
• Reporting: Prepare regular quality Assurance reports through the RMS \[Resident Management System\], including statistical analysis of non-conformance trends, corrective actions
• Continuous Improvement: Identify areas for process improvement, propose best practices, and contribute to the continuous enhancement of quality management processes.
• Quality Documentation: Maintain accurate and organized quality records through the RMS, including inspection reports, test results, and relevant project documentation.
• Subcontractor Oversight: Monitor the quality performance of subcontractors and vendors, ensuring they meet the required standards.
• Quality Assurance Planning: Collaborate with the project team to define quality assurance strategies, goals, and objectives for each project phase.
• Activity Hazards Analysis - AHA: Identify potential quality-related risks and develop strategies to mitigate them and comply with EM385-1-1 requirements.
• Accident Prevention plan: Review the APP to comply with USACE EM385-1-1 requirements.
• Client Satisfaction: Collaborate with clients to understand their quality expectations, address concerns, and ensure client satisfaction.

Quality Control Site Manager في Beijing Emirates
  • المملكة العربية السعودية - المدينه المنوره
  • أبريل 2015 إلى ديسمبر 2017

Client: Ministry of Interior

Project: Military City Construction: Madinah KAP2

Project Budget: 3 billion Saudi Riyal

Project Scope:
Construction of Military City which includes Project Contains Dormitory Buildings (04), housing Buildings (05), Theater (01), Mosque (01), Warehouse "Steel Structure" (01), Admin Building (01), Medical Center (01), Swimming Pool (02), Infrastructure Works, Playground (02) and Landscape Work. Project Area of more than 25 million m2

Responsibilities:

• Led and developed full-scale project Quality plans. Define the project scope of work, its goals and verify deliverables. Tracked project deliveries using project management tools. Tracked and resolved critical issues to minimize project risk factors.
• Preparing Inspection and Test Plan \[ITP\].
• Preparing Method Statements and all Inspection Checklists.
• Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
• Assuring the acceptable quality of materials, processes, and workmanship in the project work.
• Issue materials receiving report for the delivered materials.
• Coordinate the document controls of technical submittals, drawings, etc. With the Project Team and to ensure that the QA/QC validation has been done, to ensure their issue, amendments, and recall of controlled documents.
• Generating MIR, IR, Site Instruction, and NCR.
• Ensure compliance with project quality standards and company policy.

Quality Control Civil Engineer في Yapi Merkezi
  • المملكة العربية السعودية - المدينه المنوره
  • أبريل 2013 إلى أبريل 2015

Client: SRO \[Saudi Railway Organization\]

Project: Construction of Madinah Railway Station

Project Budget: 3 billion Saudi Riyal

Project Scope: Construction of, Madinah Train Station Building, Long Stay Car Park Station, Fire Station Building, Mosque, External works (Roads, landscaping etc.)

Responsibilities:

• Conducting site visits for visual verification of procedure adherence, feedback from Non-Conformance Reports (NCR) and feedback from progress & quality meetings, and individual reporting of concerns from the general workforce, Supervisors, and Management.
• Offering guidance to the QC Inspectors in terms of ITP content and the required compilation of records referenced within in respect to materials product data sheets, tolerances, project specifications, their certification to compliance, their traceability, and their use in the realization of the product.
• Producing bi-weekly and monthly reports for KPIs of the project such as statistical analysis of NCRs (time between opening and closing of NCRs, Root causes of NCR and preventive actions).
• Approval status of critical documentation for the progress of works (MS, ITP, QCP, etc.) and statistical data from inspections as per the ITP.
• Prepare and manage the submission and approval of Method of Statements (MOS), Inspection and Test Plan ( ITP ), and quality forms.
• Manage the Non-Conformance Report (NCR ) and Site Instruction ( SI ) procedures and follow-up with the construction team in order to determine corrective actions and close up schedule.
• Generate and implement handover procedures, and forms and conduct coordination with the Engineer and Client for the whole project.

Infrastructure Engineer في MASCO
  • المملكة العربية السعودية - المدينه المنوره
  • أبريل 2011 إلى أبريل 2013

Client: Ministry of Finance

Project: Development of the Infrastructure of the land at East- South Al Madina Al Monawara

Project Budget: 6 billion Saudi Riyal

Project Scope:
Construction for Sewage and Storm water Networks, Potable Water and Firefighting Networks., MV, LV and Street lighting Networks. Telecommunication Networks. Irrigation (Tanks and Networks).Landscape Works (Hardscape and Soft scape).Road Paving.

Responsibilities:

• Preparing daily, weekly, and monthly reports
• Checking plans, drawings, and quantities for accuracy of calculations.
• Ensuring that all materials used and work performed are as per specifications;
• Overseeing the selection and requisition of materials and plants.
• Agreeing a price for materials and making cost-effective solutions and proposals for the intended project.
• Managing, monitoring, and interpreting the contract design documents supplied by the client or architect;
• Liaising with consultants, subcontractors, supervisors, planners, quantity surveyors, and the general workforce involved in the project.

Civil Engineer في The Arab Contractors (osman Ahmed Osman & Co.)
  • مصر - الإسكندرية
  • يوليو 2009 إلى أبريل 2011

Multiple projects as a Junior civil Engineer, intern Engineer.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Alexandria University
  • سبتمبر 2010

Civil Engineering

Specialties & Skills

Civil Engineering
Management
Quality Assurance
Construction Project Management
Project Management
CHANGE MANAGEMENT
INFRASTRUCTURE
CONSTRUCTION
RISK MANAGEMENT
QUALITY ASSURANCE
MANAGEMENT
COMMUNICATIONS
KPI REPORTING
CONSTRUCTION MANAGEMENT
QUALITY MANAGEMENT

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

الانجليزية
متمرّس
الفرنسية
متوسط
العربية
اللغة الأم
التركية
مبتدئ

العضويات

North Carolina Board of Examiners for Engineers and Surveyors
  • Professional Engineer
  • September 2022
Egyptian Engineers Syndicate
  • Civil Engineer
  • September 2010
Saudi Council of Engineering
  • Professional Engineer
  • September 2013

التدريب و الشهادات

LEED® Green Associate™ (الشهادة)
تاريخ الدورة:
February 2021
Certified Construction Manager (الشهادة)
تاريخ الدورة:
November 2023
صالحة لغاية:
November 2026
PCC AIRFIELD PAVING WORKSHOP (تدريب)
معهد التدريب:
US Army Corps of Engineers
تاريخ الدورة:
October 2021
المدة:
16 ساعة
HMA AIRFIELD PAVING WORKSHOP (تدريب)
معهد التدريب:
US Army Corps of Engineers
تاريخ الدورة:
October 2021
المدة:
16 ساعة
Licensed Professional Engineer (PE), North Carolina, USA (الشهادة)
تاريخ الدورة:
September 2022
Occupational Safety and Health Basic Diploma (الشهادة)
صالحة لغاية:
December 2014
Six Sigma Yellow Belt (الشهادة)
تاريخ الدورة:
October 2015
Project Management Professional (الشهادة)
تاريخ الدورة:
November 2017
PACE Quality Management Program (تدريب)
معهد التدريب:
Parsons
تاريخ الدورة:
August 2018
P3O Practitioner (Portfolio, Program, and Project Offices) (الشهادة)
تاريخ الدورة:
August 2021
صالحة لغاية:
August 2026
CQM-US Army Corps of Engineers (الشهادة)
تاريخ الدورة:
October 2018
صالحة لغاية:
October 2023
Lead Auditor ISO 9001:2015 (الشهادة)
تاريخ الدورة:
July 2023

الهوايات

  • Walking, Reading and Football