design manager
gila
Total years of experience :6 years, 3 Months
• I am have worked for “GILA ” (altawakol electrical company”S.A.E”) as study manager engineer (from 1/8/2009 to 1/8/2012)(Schneider products” Merlin Gerin & Telemecanique”) for:-
o MCC switch board power station (prism a “type tested” - himel “Spain” - local)
o P.F correction panel
o Switch gear and substation
• I am currently working for “GILA ” (altawakol electrical company”S.A.E”) as Design manager engineer (from 1/9/2013to now)(Schneider products” Merlin Gerin & Telemecanique”) for:-
o MCC switch board power station (prism a “type tested” - himel “Spain” - local)
o P.F correction panel
o Switch gear and substation
o Short circuit calculation by ecodial program
o Inner and outer view for all panels