Electrical Engineer
Alfanar Co.
Total years of experience :21 years, 3 Months
• Manage Site Activities as per Project Schedule
• Prepare Site and Weekly Progress Report
• Coordination with Client and Sub-Contractors.
• Verify the design drawings and execute the work
• Site execution work as per SEC Standards
• Manage materials as per Site Requirement
• Manage and maintain Submittals and drawings
• Studying all SEC comments and comply the same based on discussions with the related suppliers / design engineers.
• Reviewing the Electrical design and supplier submittal to be submitted to SEC-CTA.
• Arranging and prepare letters, reports and submittals to SEC-CTA.
• Dealing and contacting all vendors for ongoing activities, pending issues … etc.
Project
• Construction of New Al-Jouf 380kV BSP and Expansion of Hail 380kV BSP.
• Construction of New 132/13.8kV Substation, Ministry of Defence (MODA), Al-Kharj.
Presently I am working as Electrical Engineer (Consultant) in Makkah West 380/110/13.8 kV Substation.
1. Review and engineering installation work
2. Testing and Commissioning of electrical systems including EHV/HV transmission lines, sub-stations.
3. Classification, review of electrical Engineering drawings & submittals.
4. Contractor drawings review.
5. review of technical specifications
6. Preparation and review of layout drawings and schematics.
7. Ground grids design calculations,
8. Earthing and, Lightning protection system review/modification
9. Site inspections related to transformers, cable trays, HV/LV Switchgears, Battery chargers, LCC Panels, AC/DC panels, cables and lighting system, RTU’s, Protection panels.
10. Testing & Commissioning 380/110/13.8 kV Switchgears
11. Testing CT’s & VT’s using Omicron CT Analyzer & CPC-100
12. 380 kV Breaker Timing Test (Programma “EGIL”) and Function Test.
13. Surge Arrester & Surge Counter Test (Tan Delta, Meggering) used Megger MT & Severker
14. CT & VT loop test.
15. Contact Resistance Test of Isolators.
16. High voltage test for Earthing Isolators.
17. Proper co-ordination with client and contractor for continuity in site activities.
Worked as a Electrical Engineer in Saudi Electricity Company (SEC), Kandharah Substation 380/110/13.8 BSP substation projects in the western region here I was responsible for the following jobs.
1. Review and engineering installation work
2. Site inspections related to transformers, cable trays, HV/LV Switchgears, Battery chargers, LCC Panels, AC/DC panels, cables and lighting system.
3. 73 MVA Transformer Tests (Hyundai)
4. Testing & Commissioning 380/110/13.8 kV Switchgears
5. Testing CT’s & VT’s using Omicron CT Analyzer & CPC-100
6. 380 kV Breaker Timing Test (Programma “EGIL”) and Function Test.
7. Surge Arrester & Surge Counter Test (Tan Delta, Meggering) used Megger MT & Severker
8. CT & VT loop test.
9. Contact Resistance Test of Isolators.
10. Closed Loop Test
11. Good Knowledge about RTU’s (ABB 560A), SOE & Fault Recorder
12. Follow SEC Standards.
I have been working as a Consultant Electrical Engineer (Witnessing) in Rabigh-II 380 kV switching station since January 2009 to August 2009. I was responsible for the following jobs.
13. Testing & Commissioning 380 kV Switchgears
14. Testing CT’s & VT’s using Omicron CT Analyzer & CPC-100
15. 380 kV Breaker Timing Test (Programma “EGIL”) and Function Test.
16. Surge Arrester & Surge Counter Test (Tan Delta, Meggering) used Megger MT & Severker
17. CT & VT loop test.
18. Contact Resistance Test-
19. Scheme Check
20. Closed Loop Test
21. Good Knowledge about RTU’s (ABB 560A), SOE & Fault Recorder
22. Follow SEC Standards.
I have worked as a Electrical Sub Engineer in Karachi Electric Supply Corporation Ltd (Substation Maintenance Department) from 26th February, 2003 to 31st December 2008. Here I was responsible for the following jobs.
1. Testing & Commissioning of CT’s with the help of CT Analyzer (OMICRON)
2. Testing & Commissioning of PT’s using CPC - 100, Megger MT,
3. Surge Arrester Test ( tan delta test)
4. Testing & Commissioning Energy Meters.
5. CT & VT Loop Test (CPC - 100)
6. Bus Bar stability test.
7. Working knowledge about ABB & Siemens relays.
8. DATA Retrieval Panels
9. Transformer and Switchgear testing.
1. 1st Divsion, obtaining 65% marks. 2. Two months Industrial Training in Gas Turbine Power Station (25 x 4 = 100 MW) in Electrical Maintenance Department.
1. Three years Diploma in Associate Engieering (Electrical) obtaining 1st Division (71%). 2. Two months training in Under Ground Cable Testing Department from Karachi Electric Supply Corporation Ltd