Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Herbert Maquinto, Site Engineer

Herbert Maquinto

Site Engineer·ETSI

Philippines

Diploma, CCNA2 Routing and Switching Essentials

Work experience

Total years of experience: 21 years, 1 months

Site Engineer

March 2018 - June 2018

ETSI

Philippines

March 2018 - June 2018

 Perform Technical Site Survey to all existing SMART Cell site tower infrastructure. Conducting site Audit on all Ericsson RBS Equipment’s (6201, 6202, 6301, 6100, 2206, 2216 V2, Delta Enclosure) and Radio ( RUS 01 B0, B1, B3, B5, B28), (RRUS 01, 02, 12), plugin modules DUG, DUW, DUL installed, identifying cabinet space, Antenna, Power, cable layout, Feeder, RRU, CPRI and identifying space availability for proposed 12 port antenna, ERS 2217, 2219, and 4415 Location, Baseband 6630, 5216, Mounting pipe, AMB, Busbar and grounding. Existing Microwave Antenna and Radio.
 Conduct Investigation and proposal for AC power requirements ( Size of wire and CB AT) Type of transformer and Capacity, Genset type and capacity (single phase and three phase). AC CB assignment at MDP or ACPDB, identify existing DC CB assignment, Proposed DC CB assignment on Existing Rectifier Rack and proposed location on new Rectifier Rack, DCPDB CB for new Rectifier rack, additional Port hole entry.
 Sketch equipment Layout, draw existing Power layout and proposed solution for power requirements., Tower layout for proposed equipment location, 12 port Antenna and RRU placement, cable layout. (IE and CAD to finalize the 3D drawing for Tower.
 Liaise with IE and CAD for finalizing the design for technical solution for upgrade of 2G and 3G equipment with additional LTE and upgrade of 3G. (G900, U850, G1800, U1800, U2100 and L2100).
 Liaise with SMART Supervisor prior to site visit and coordinate with Field Officer for RBS configuration of every sites.

Company industry:
Telecommunications
Job role:
Engineering

Field TETRA Engineer/Acceptance Supervisor

April 2016 - March 2017

Airbus Defence and Space Oy

Riyadh, Saudi Arabia

April 2016 - March 2017

 Project Management Act as owner of Site Acceptance and re-validation of project acceptance that Completion Certificate were met and approved by Client. Project management includes Site Acceptance Project Deployment. Provide Schedule in deploying TETRA Engineering Acceptance team from Romania and local team working with Saudi MOI consultant. Project implementation and acceptance were delivered to meet customer’s expectation and timelines. Teams were increase to attain schedules. Quality of work is implemented during such activities.
Coordinate with every head of department for the teams Transportation, Mobile phone, Hotel Accommodation, Airplane booking, test equipment and accessories, security escort for site near war zone.
 Prepare/s Schedule and letter for Ground and AGA TB3 - OSAT, Re-Validation of test and correction of punch list.
 Collaborate with MOI Consultant, Representative and OSAT Team prior to deployment to achieve smooth work activities from different agency of MOI.
 Conduct Meeting to OSAT Teams prior to deployment. See to it that all requirements are in place before mobilization.
 Review OSAT Books prepared for site acceptance test of TETRA equipment’s and feed line system.
 Supervise/Monitor Telecom Project implementation.
 Liaise with MOI Engineering Consultant (Archen) for Approval of OSAT Books.
 Lead various personnel resources for production of OSAT books for four regions.
 Prepare Test Equipment’s, (IFR, Grounding Tester, Anritsu Site Master, TH1N Terminals) Tools needed by Field OSAT teams.
 Capture Sweep test result, arrange and print all documents. Trouble shoots and repairs if antenna fault occurs in the results.
 Prepare document attachment for invoicing.
 Report to Branch manager and roll out manager for the progress of acceptance work.
 Collaborate with MOI consultant for progress of accepted OSAT books.
 Consolidation of all Red line remarks for As-built documentation.
 Prepare all documents related to test cases Scan approved test cases, Manuals, Brochures of TETRA System networks used in all Main and Fallback MSO.

Company industry:
Aerospace
Job role:
Engineering

Work Permit Receiver/Tetra Field Engineer

August 2015 - October 2016

Airbus Defence & Space Formerly Cassidian Saudi Ltd.

Eastern Province, Saudi Arabia

August 2015 - October 2016

 Assists TETRA Specialist for Hardening of TETRA equipment’s TCS, DWS, , CDD, AKDC, Net Act, NMS, Logging Recorder’s (CORE, CTI, Satellite, SFA, NAS)
 Collaborate with Saudi Aramco Proponent for installation activities.
 Collaborate with Logging Recorder solution expert for schedule of activities and hardening requirements base on Work Base Line ( WBS ).
 Secure Work Permit to Work Permit Issuer.
 Perform Network element installation.

Company industry:
Telecommunications
Job role:
Engineering

OSAT Supervisor/Field Tetra Engineer

December 2014 - March 2016

Airbus Defence and Space formerly Cassidian Saudi Ltd.

Riyadh, Saudi Arabia

December 2014 - March 2016

 MOI Telecommunication Project
 Project Management Act as owner of Site Acceptance and re-validation of project acceptance that Completion Certificate were met and approved by Client. Project management includes Site Acceptance Project Schedule in deploying TETRA Engineering Acceptance team from Romania and local team working with Saudi MOI consultant. Project implementation and acceptance were delivered to meet customer’s expectation and timelines. Teams were increase to attain schedules. Quality of work is implemented during such activities.
 Prepare/sanitize Onsite Acceptance Test (OSAT) books contents (Field Test Procedure)
 Attend meeting/Liaise with MOI Engineering Consultant (Archen) for Approval of OSAT Books.
 Attend meeting/Liaise with Archen QA/QC and Engineering team for Approval, processes for submission of OSAT Books.
 Supervise/Deploy 3 Romanian Team to perform Site acceptance test with MOI consultant
 Review OSAT Books prepared for site acceptance test of TETRA equipment’s and feed line system.
 Arrange Service vehicle, mobile phone, hotel accommodation for team deployment
 Lead various resources for production of OSAT books for four regions.
 Involved in wider Department decision for procurement of materials, provision of equipment’s and facilitation of calibration certificates.
 Prepare Test Equipment’s, (IFR, Grounding Tester, Anritsu Site Master, TH1N Terminals) Tools needed by Field OSAT teams.
 Liaise with Procurement team and other telecom vendor to facilitate the materials purchasing required in projects implementation.
 Supervised/Monitor Telecom project implementation.
 Responsible for preparing Plan Schedule and letter for Ground TB3 (Central, Western and Eastern and Southern region) - OSAT.
 Directly coordinate with MOI consultant QC Department for approval of Certificates for Installation and Acceptance of TB3 system.
 Involve in reviewing the re-inspection sheet as sign-off pages signed as approved by MOI Consultant for Invoicing.
 Report to Branch manager and roll out manager for the progress of acceptance work.
 Collaborate with MOI consultant for progress of accepted OSAT books.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Project Site Engineers/Radio Engineer

November 2011 - November 2014

Sumitomo Corporation KSA Branch

Dammam, Saudi Arabia

November 2011 - November 2014

 ARAMCO TETRA Network for BI-10-112 Project Gas and Oil Industry-Eastern Region
 Works in Onshore/Offshore Aramco Gas and Oil Facilities.
 Prepare two weeks look ahead schedule.
 Involved in supervision, Monitoring checking of Quality works for TETRA DXT3, DN2, DM2, TB3 Installation, Dispatch Consoles, Axell Wireless Indoor Repeater, Tower lights (Beacon and Obstruction lights). Rectifier and Battery installation.
 QA/QC Supervisory works.
 Responsible for Design, Engineering and implementation of BI-10-00112- Mobile Replace Radio for Eastern Region Saudi Aramco TETRA Communication from On-shore and Off-shore sites.
 Supervised /Monitor TETRA Network Telecom and DC Power Project implementation.
 Perform walk test and call test before and after activation of Indoor Repeater using HPR Cell information.
 Liaise with SAPMT, Saudi Aramco Area IT and sub-contractor for scheduling of CRM and Change Remedy Requests for service affecting rectification of TX antenna alarm and other alarms shown on NMS at Dhahran
 Update of Red Line Drawings, As-Built Drawings for Saudi Aramco TETRA Radio Base Station Installation and OTN E1 connection wirings.
 Liaise with PID.PMT Proponents AIT, WPI, QC Telecom and Subcontractor during Exception Item List Rectification.
 Review the EIL made by QC telecom if this is satisfactory in accordance with SAES.
 Review and edit field revised plan for RFDT IFC drawing based on Saudi Aramco Engineering Standard (SAES).
 Liaise with LS Telecom, for new Antenna placement, SAPMT for updated radio data for possible antenna dismounting and ACES for implementation of IFC and field revision drawings.
 Liaise with LS Telecom, AIT, Proponent and SAPMT during activation for CSR 438 Indoor Repeater.
 Liaise with Saudi Aramco Project Management Team (SAPMT) for approval of Field Revision and Shop Drawings for fabrication. Radio Frequency Dispatch Console (RFDT) Antenna Mast and TETRA Base Station Antenna Mounting Brackets and Indoor Repeater Antenna Mast.
 . Liaise with Saudi Aramco Proponent, Project Management, and Area IT per site, EADS Engineer, QC Telecom and Proponent during MCI Walk through.
 liaise with Saudi Aramco Proponent, Project Management, Area IT per location, Airbus-EADS, during Change Remedy, CRM facilitation for Power Termination and E1 activation to put the site ON-AIR
 Liaise with Saudi Aramco Area IT, PMT, PID, Sumitomo QC, EADS Vendor and Tower Crew during Mechanical Completion Inspection activities.
 Prepare MOP for DC power System and Battery Upgrade.
 Liaise with Fabrication shop owner for Provision of shop drawing based on approved. IFC and Field revision drawings approved by SAPMT.
 Report to Construction Manager regarding the progress of Telecom works, Station grounding.
 Report to design manager regarding the progress of Antenna Bracket Fabrication and readiness for shipment to On-shore and Off shore of Saudi Aramco TETRA sites.
 Prepare Schedule for DC power tapping and cut-over works for TETRA base station configuration.
 Collaborate with Sumitomo Area Manager (Tanajib, Hawiyah and Shaybah) and Saudi Aramco PMT in the same area requesting for Change Remedy requests for proposed cut-over schedule and Termination of E1 to put the Base station On-Air.
 Observe and Implement the projects with Work Permit Receiver and Safety Engineer adhering to safety measures when climbing to towers. Used of PPE’s is mandatory implemented.
 Printing of all Sweep test results for BTS and Indoor Repeater Antenna and feed line system.

Company industry:
Civil Engineering
Job role:
Oil and Gas

Senior OSP Telecom Supervisor/ QS

August 2010 - March 2011

MG Exeo Network Inc.

Philippines

August 2010 - March 2011

 Detailed Design for cut-over or half tapping of Secondary Copper cable for new Access Gateway (Huawei Cabinet.).
 Material requisitioner needed for telecom implementation.
 Prepares Single line diagram of all surveyed site with new Huawei AG cabinet Halftapping point of interconnection.
 Cable verification needed for engineering design and proposal of correct cable for half-tapping.
 Site Audit, Quantity Survey and staking of pole to pole distance and cabinet to riser distance to be reflected for As-built plan.
 Prepare and finalize material requisition needed for Installation.
 Calculate detail of materials based on quantity survey.
 Prepare billing based on actual work done purposed stating all the accomplish task done on site.
 Performs inspection of all completed site (Civil and Cable works) if everything were done based on quality standard of Customer.
 Prepare material reconciliation with sub-contractor and Client to meet zero balance with installed and
Returned installation materials.
 Encoding of Request Order (RO) prepared by client warehouse supervisor.

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

May 2010 - June 2010

MG Exeo Network Inc.

Taiwan

May 2010 - June 2010

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos.
 Received Delivery of 1626LM and 1620LM equipment .
 Equipment Inventory
 Bolt-down of 1626LM Compensation Rack and installation of bottom and top rack support.
 Laying and termination of Patch cord from mini ODF (SDH equipment.) to ODF.
 Fiber labeling
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Sr. Telecom – NEC Microwave Transmission Engineer

March 2008 - April 2010

MG Exeo Network Inc.

Philippines

March 2008 - April 2010

 Team Leader/Supervisor for NEC SDH RFI Scanning using Spectrum Analyzer, LNA and Feed Horn Antenna.
 Perform Installation, Testing and Commissioning of SDH Microwave.
 Perform acceptance test with Globe Telecom.
 Quality Assurance/Quality Checking of all installation, checking if standard installation was met.
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

February 2010 - February 2010

MG Exeo Network Inc.

Fiji

February 2010 - February 2010

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Received Delivery of DWDM 1620LM equipment and compensation rack.
 Equipment Inventory
 Installation of1620LM (boltdown and internal and, ODF Fibering of patch cord.)
 Installation of Ladder Racks, Laying and Termination of AC/DC power cable. Alarm,
Grounding, and LAN Cable.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

January 2010 - February 2010

MG Exeo Network Inc.

United States

January 2010 - February 2010

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Received Delivery of 1675LU equipment .
 Equipment Inventory
 Installation of1675LU boltdown and top rack support.
 Laying and Termination of AC/DC power cable. Alarm, Synchronization Cable
Grounding, and LAN Cable.
 Lacing of Break-out cable and termination to ODF and equipment side.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

January 2010 - January 2010

MG Exeo Network Inc.

United States

January 2010 - January 2010

Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Received Delivery of DWDM 1620LM equipment and compensation rack.
 Equipment Inventory
 Installation of1620LM (boltdown and internal fibering of patch cord.)
 Installation of Ladder Racks, Laying and Termination of AC/DC power cable. Alarm,
Grounding, and LAN Cable.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction and Commissioning Engineer

June 2009 - September 2009

MG Exeo Network Inc.

Indonesia

June 2009 - September 2009

Twice Visit Jakarta and one time in Medan Indonesia for installation, Upgrading and Testing
Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Boltdown 2unit-ADM’s 1678 and 3 unit DWDM SLTE1620.
 Laying and Termination of Patch Cord LC-FC, LC-MU and LC-SC
 Testing using 1678MCC2 R2.2
 Inform GBNOC for activity to be done. Non-traffic affecting.
 Cut-over of 1662SM to 1678MCC STM 64 fiber
 Perform up-grading of 1678MCC by inserting modules (STM4, 16 and 64)
 Declaration of boards and modules
 Perform cross connection using craft terminal
 Perform output power test on all fibers.
 Perform Acceptance Test together with customer prior to signing of documents such as Short Transmission Test, ALS Test, Sensitivity, MSP and Output Power Test.
 Set-up SDH analyzer and run 48hrs Confidence Trial Test.
 Perform Integration test with ASN DWDM 1620 Tester. Run SDH Analyzer for 2 days without error.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction and Commissioning Engineer

April 2009 - June 2009

MG Exeo Network Inc.

Singapore

April 2009 - June 2009

 three times visit Singapore
 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Boltdown 4unit-ADM’s 1678 and 6 unit DWDM SLTE1620, 1unit Server Rack and 2 set PC presentation.
 Laying and Termination of Break-out cable and Patch Cord LC-FC, LC-MU and LC-SC
 Installation of HP Server Tack with Router and switches.
 Testing using 1678MCC2 R2.2
 Inform GBNOC for activity to be done. Non-traffic affecting.
 Cut-over of 1662SM to 1678MCC STM 64 fiber
 Perform up-grading of 1678MCC by inserting modules (STM4, 16 and 64)
 Declaration of boards and modules
 Perform cross connection using craft terminal
 Perform output power test on all fibers.
 Perform Acceptance Test together with customer prior to signing of documents such as
Short Transmission Test, ALS Test, Sensitivity, MSP and Output Power Test.
 Set-up SDH analyzer and run 48hrs Confidence Trial Test.
 Perform Integration test with Fujitsu Tester and Alcatel Lucent for SLTE and 1662ADM.Run SDH Analyzer for 48 hours w/o error.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction and Commissioning Engineer

October 2008 - February 2009

MG Exeo Network Inc.

Singapore

October 2008 - February 2009

 two times visit singapore.
 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Boltdown/Installation of Alcatel new generation 1678 MCC1 +1670SM T1, Optinext Rack 1670SM T2 with two LAN Switches, 1678MCC2 + 1670SM T3, Power Feeding Equipments, Fabrication of Ladder Racks, Data Communication Equipment, Cabling and termination of AC/DC Electrical, Optical Coaxial and Twisted Cable. IP Phone, DCN Rack with Two Routers and 6 hubs switches.
 Installation of ALU two ODF Rack by Nexans.
 Installation of DCN Server with Router and switches.
 Set-up PC for Go-global presentation by DCN Expert.
 Installation and commissioning of SSU OSA 5581C GPS-SR with Line Amplifier.
 Assists TESTER in performing output power test.
 Assists TESTER in Simulation of Alarms with NEC
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

July 2008 - September 2008

MG Exeo Network Inc.

Hong Kong

July 2008 - September 2008

 Two times visit Lantau Hong-Kong
 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Boltdown/Installation of 3 units Alcatel new generation 1678 MCC1 +1670SM T1, Optinext Rack 1670SM T2 with two LAN Switches, 1678MCC2 + 1670SM T3, Fabrication of Ladder Racks, Data Communication Equipment, Cabling and termination of AC/DC Electrical, Optical Coaxial and Twisted Cable. IP Phone, DCN Rack with Two Routers and 6 hubs switches.
 Installation of ALU two ODF Rack manufactured by Nexans.
 Set-up PC for go-global presentation to be configured by DCN Expert.
 Laying of Coaxial cable to be terminated to client SSU
 Assists TESTER in performing output power test.
 Assists TESTER in Simulation of Alarms with NEC
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

May 2008 - May 2008

MG Exeo Network Inc.

Singapore

May 2008 - May 2008

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Boltdown/Installation of Alcatel 1678 MCC1
 Installation of Ladder Racks, Laying and Termination of AC/DC power cable. Alarm,
Grounding, LAN Cable and Coaxial cable to SSU.
 Installation of Routers and Hub Switch.
 Laying of Patch cord from 1678MCC to ODF
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

March 2008 - May 2008

MG Exeo Network Inc.

Philippines

March 2008 - May 2008

 Installation of Mitsubishi Equipment WTU, LTU, ODF and IDF. Fabrication of Equipment top Support, Data Communication Equipment, Cabling and termination of AC/DC Electrical, Optical Coaxial and Twisted Cable .
 Quality Assurance/Quality Checking of all installation, checking if standard installation was met.
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

March 2008 - May 2008

MG Exeo Network Inc.

Philippines

March 2008 - May 2008

 Installation of Mitsubishi Equipment WTU, LTU, ODF and IDF. Fabrication of Equipment top Support, Data Communication Equipment, Cabling and termination of AC/DC Electrical, Optical Coaxial and Twisted Cable .
 Quality Assurance/Quality Checking of all installation, checking if standard installation was met.
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Sr. Telecom – NEC Microwave Transmission Engineer

March 2006 - April 2008

MG Exeo Network inc.

Philippines

March 2006 - April 2008

 Team Leader/Supervisor for NEC SDH RFI Scanning using Spectrum Analyzer, LNA and Feed Horn Antenna.
 Perform Installation, Testing and Commissioning of SDH Microwave.
 Perform acceptance test with Globe Telecom.
 Quality Assurance/Quality Checking of all installation, checking if standard installation was met.
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

October 2007 - December 2007

MG Exeo Network Inc.

United States

October 2007 - December 2007

 Driving at Manchester California and Conduct installation.
 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Installation of 39 units Fujitsu SLTE Equipment, TRIB1, TRIB2, COM, TWMA, RWDA, BDCA1, BDCA2, BDCA3, BDCA4, Fixing of Ladder Racks, Data Communication Equipment, Cabling and termination of AC/DC Electrical, Optical Coaxial and Twisted Cable.
 Installation of HP Server Rack with Router and switches.
 Installation of Ladder Racks, Laying and Termination of AC/DC power cable, Alarm,
Grounding and LAN Cable.
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecom Engineer Ericsson BTS, and Microwave Engineer

March 2006 - October 2007

MG Exeo Network Inc.

Philippines

March 2006 - October 2007

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Ericsson standard and customer satisfaction..
 Team Leader in Installation of Telecom works for Ericsson RBS/BTS 2G/3G Equipments such as (RBS 2202, 2102, 2206, 2106, 2106i, 2207, 2107, 2308, 2216).
 Responsible for Testing, Commissioning and Integration of Ericsson 2G equipment using OMT software. (Loading /create IDB, Defining Present RU’s and Defining RBS Transmission interface).
 Team Leader in Installation of Telecom works for Nokia 3G Supreme Optima Equipments.
 Team Leader in Installation of Various rectifier. (Emerson, Eltek, Powerone)
 Team Leader in Installation, Testing, commissioning, and Panning of various Microwave Antenna’s (Mini-Link E, Traffic Node, Siemens Sral Xd, Onecomm-Spacelink, NEC-Pasolink, NERA and Alcatel PDH).
 Perform Test Call using TEMS and perform Simulation of alarms
 BER Testing and Documentation work on site Folder
 Responsible for Installation, Testing, Commissioning and Optimization of XinMinn FSR.
(Optimization Includes Frequency Scanning using Spectrum Analyzer and Net monitor)
 Perform Functionality test such as CSSR, MMS, SMS and Handover test.
 Coordinate with RF Engineer regarding the Statistics/ Key Performance Indicator (KPI) before and after Optimization works that includes changing of BCCH/SDCCH, TCH and defining of neighboring cell for HO.
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

March 2007 - April 2007

MG Exeo Network Inc.

Philippines

March 2007 - April 2007

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Installation of Power Feed equipment removed from another SMW3 station.
 Fabrication of Ladder Racks, Laying and Termination of alarm cable, AC/DC power cable
Grounding Cable, LAN Cable.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

January 2007 - February 2007

MG Exeo Network Inc.

Karachi, Pakistan

January 2007 - February 2007

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 De-Installation of Power Feed equipment removed from another SMW3 station
 Boltdown/Installation of Alcatel 1678 MCC1 and HP Server Rack
 Installation /fabrication of Ladder Racks, Laying and Termination of alarm cable, AC/DC, Optical patch cord .Coaxial and Twisted Cable of Ladder Racks, Laying and Termination of AC/DC power cable. Alarm, Grounding and LAN Cable.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

December 2006 - February 2007

MG Exeo Network Inc.

Karachi, Pakistan

December 2006 - February 2007

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 De-Installation of Power Feed equipment removed from another SMW3 station
 Boltdown/Installation of Alcatel 1678 MCC1 and HP Server Rack
 Installation /fabrication of Ladder Racks, Laying and Termination of alarm cable, AC/DC, Optical patch cord .Coaxial and Twisted Cable of Ladder Racks, Laying and Termination of AC/DC power cable. Alarm, Grounding and LAN Cable.
 Installation of new Fujitsu DCPDB
 Laying of power Cable and Termination.
 Cut-over works
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

December 2006 - December 2006

MG Exeo Network Inc.

Casablanca, Morocco

December 2006 - December 2006

 Installation of new Fujitsu DCPDB
 Laying of power Cable and Termination.
 Cut-over works.
 Quality Assurance/Quality Checking of all installation, checking if standard installation was met.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

June 2006 - September 2006

MG Exeo Network Inc.

Korea (South)

June 2006 - September 2006

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Mitsubishi Standard and customer satisfaction.
 Installation of Mitsubishi Equipment WTU, LTU, ODF and IDF. Fabrication of Equipment top Support, Data Communication Equipment, Cabling and termination of AC/DC Electrical, Optical Coaxial and Twisted Cable.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

. Telecom Engineer Huawei BTS, and Microwave Engineer

May 2005 - September 2006

MG Exeo Network Inc.

Philippines

May 2005 - September 2006

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Huawei Standard. and customer satisfaction.
 Team Leader in Installation of Telecom works for Huawei BTS 312
 Team Leader in Installation, Testing, commissioning, and Panning of various Microwave
Antenna’s such as NERA and Ceragon.
 BER Testing and Documentation work on site Folder
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Sr. Telecom Construction Engineer - ZTE

February 2005 - September 2006

MG Exeo network Inc.

Philippines

February 2005 - September 2006

 Team Leader in Installation of Telecom works for ZTE CDMA2000
 Quality Assurance/Quality Checking of all installation, checking if standard installation was met.

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

May 2006 - June 2006

MG Exeo Network Inc.

Taiwan

May 2006 - June 2006

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Boltdown/Installation of Alcatel 1678 MCC1
 Installation of Ladder Racks, ADC Trunking, Laying and Termination of AC/DC power cable. Alarm,
Grounding, LAN Cable and
 Laying of Break-out and Patch cord from 1678MCC to ODF
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

October 2005 - October 2005

MG Exeo Network Inc.

India

October 2005 - October 2005

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France for the progress of work and related activities.
 E-mail to Alcatel-Lucent the weekly report the actual work done with photos and pending deliveries.
 Boltdown/Installation of Alcatel 1678 MCC1
 Installation of Ladder Racks, ADC Trunking, Laying and Termination of AC/DC power cable. Alarm,
Grounding, LAN Cable and Laying of Patch cord from 1678MCC to ODF
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecommunication Construction Engineer

January 2005 - May 2005

MG Exeo Network Inc.

Karachi, Pakistan

January 2005 - May 2005

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Alcatel-Lucent Standard.
 Coordination with Alcatel France and supervisor installer for the progress of work and related activities.
 E-mail to supervisor installer the actual work done with photos and pending deliveries.
 Boltdown/Installation of ALU ADM’s 1678MCC1, 1670SM, DWDM - 1620LM, HP Server,
(PFE- CTC, CC1, CC2), ESU, DDF, IDF and ODF Rack.
 Fabrication/Installation of Ladder Racks, ,
 Laying and termination of power cable, From ESU to Server Rack, DWDM’s, and ADM’s
 Laying and termination of power cable, From DCPDB to ESU.
 Laying and termination of LAN, From ADM’s to Server Rack, DWDM
 Laying of Patch cord from 1678MCC to ODF, IDF, 1670SM and 1620LM
 Laying and termination of Coaxial cable from ADM’s to DDF.
 Installation of Computers and Printer for Configuration of Server Expert.
 Control of Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

. Telecom Engineer - Ericsson BTS, and Microwave Engineer

September 2004 - February 2005

MG Exeo network Inc.

Philippines

September 2004 - February 2005

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance Ericsson Standard and customer satisfaction
 Team Leader in Installation of Telecom works for Ericsson RBS/BTS 2G equipment .RBS 2206
 Team Leader in Installation of Emerson Rectifier
 Team Leader in Installation, Testing, commissioning, and Panning of MW Antenna (Mini-Link E)
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

. Telecom Engineer - Ericsson BTS, and Microwave Engineer

June 2002 - April 2003

MG Exeo Network Inc.

Philippines

June 2002 - April 2003

 Completed the installation with Quality Assurance/Quality Checking of all installation and checking if standard installation was met in accordance to Ericsson Standard and customer satisfaction.
 Team Leader in Installation of Telecom works for Ericsson RBS/BTS 2G equipment .RBS 2202
 Team Leader in Installation of Ericsson BBS2202
 Team Leader in Installation, Testing, commissioning, and Panning of Microwave Antenna
(Mini-Link E.) TMR9202
 Documentation - as-built

Company industry:
Telecommunications
Job role:
Engineering

Telecom Engineer Material Controller/Supervisor

April 2002 - May 2002

MG Exeo Network Inc.

Philippines

April 2002 - May 2002

 Material Controller for dispatching/Shipment of various installation materials needed in Airport project.
 Quality Control and checking of fabricated materials based on approved drawing by Japananese Consultant.
 Request different supplier and fabrication shop for customization of installation materials needed on various site.
 Pick-up some imported materials from Toshiba Tomen airport office for shipment various aiiport site.
 Turn-over other job and responsibilities to other personnel when transferred to GSM project as supervisor for implementation.

Company industry:
Telecommunications
Job role:
Engineering

Sr. Supervisor Telecom Site Acquisition

November 2001 - April 2002

MG Exeo Network Inc.

Philippines

November 2001 - April 2002

 Perform/Site acquisition for Possible Cell Site Location based on search ring radius
 Conduct Post and Pre permitting works.
 Apply Permit to municipal and City Hall for construction permit of Cell site (Roof top and Green field site
 Perform RF Survey and Technical Site Survey Report.
 Perform RF Engineering Survey/Design for GSM such as conducting ocular survey, technical survey for new cell site, microsites and repeaters..
 Perform detailed design on rooftop and green field sites.

Company industry:
Telecommunications
Job role:
Engineering

Sr. Telecom RF Engineer

March 2000 - October 2000

MG Exeo Network Inc.

Philippines

March 2000 - October 2000

 Plot Coordinates based on issued search ring by Lucent Transmission Engineer. Ocular survey of possible cell sites includes whose activity to be done are as follows. (a) Validate and verify map studies made back at the office; (b) Check the feasibility of putting up a cell site on the location identified during the initial map survey; (c) Identify the major highway and thoroughfares where most people would pass by; (d) Identify the major trading and commercial centers of an area of interest; (e) Check the presence of possible blocking, e.g., high rise structure which are not evident and reflected on regular terrain maps; (f) Identify possible lots, building or structure for a site location which can be acquired by the Site Acquisition Group; (g) Validate the coverage and Received Signal Level (RSL) in the area of interest; (h) Check for possible point of facility interconnection; (I) Provide a higher degree of accuracy in the issuance of Search Ring Map (SAM).
 Prepare field survey/RF engineering report, Confirmation of candidate site capability if it comply with the design criteria such as deciding the exact location of antenna per sector (Pole Mounted, Parapet type, Wall Mounted, equipment hut and tower location. Perform Civil work evaluation if the building can hold the structures, Identify Cable route of power and feeder cable going to cabin/equipment hut. Taking of photos view per sector at 45o orientation to view the coverage area and possible obstruction including Line of Sight for Microwave Link.
 Receive commendation from Company president for being the no.1 subcontractor.
 Perform Survey for tower location of WBS and WTS.
 Plot Coordinates and location of surveyed area.

Company industry:
Telecommunications
Job role:
Engineering

Sr. OSP Communication Engineer

March 1998 - March 2000

MG Exeo Network Inc.

Philippines

March 1998 - March 2000

PLDT ZBP II Project/X6 Additional Project


 Conduct weekly meeting with sub-contractor in discussing the progress of work and some issuses on permitting problems for installation of basepad and Head Guy, and side Guy.
 Supervised 3 teams and sub-contractor in conducting engineering studies to support networks: design conduit systems, buried and aerial facilities.; Proactively identify and design distribution for relief and modernization of existing Facilities.;
 Perform design analysis of OSP feeder and distribution facilities.
Carefully reviews and checks the plan if the customer standard engineering design criteria was met.
 Performs/ Designing and Planning of Fundamental Plan, , Fundamental Conduit Plan.
 Performs Supervised 3 teams and sub-contractor in conducting Detailed design of Primary and Secondary Network Cable plan and Geographical Plan.
 Estimate Bill of Quantities per primary and Secondary cable.
 Perform Quantity survey and prepare Billing based on Actual QS.
 Perform re-engineering or Site Instruction notices (SI) and cut-over plan for new implementation works.
 Prepare quotation for the Design of OSP Network.

Company industry:
Telecommunications
Job role:
Engineering

Sr. OSP Communication Engineer

April 1997 - March 1998

MG Exeo Network Inc.

Philippines

April 1997 - March 1998

PILTEL EO 109 Project


 Conduct weekly meeting with sub-contractor in discussing the progress of work and some issuses on permitting problems for installation of basepad and Head Guy, and side Guy.
 Supervised 3 teams and sub-contractor in conducting engineering studies to support networks: design conduit systems, buried and aerial facilities.; Proactively identify and design distribution for relief and modernization of existing Facilities.;
 Perform design analysis of OSP feeder and distribution facilities.
Carefully reviews and checks the plan if the customer standard engineering design criteria was met.
 Performs/ Designing and Planning of Fundamental Plan, , Fundamental Conduit Plan.
 Performs Supervised 3 teams and sub-contractor in conducting Detailed design of Primary and Secondary Network Cable plan and Geographical Plan.
 Estimate Bill of Quantities per primary and Secondary cable.
 Perform Quantity survey and prepare Billing based on Actual QS.
 Perform re-engineering or Site Instruction notices (SI) and cut-over plan for new implementation works.
 Prepare quotation for the Design of OSP Network.

Company industry:
Telecommunications
Job role:
Engineering

Sr. OSP Communication Engineer

June 1994 - April 1997

MG Exeo Network Inc.

Philippines

June 1994 - April 1997

PLDT X5, X5C, X6 Project

 Conduct weekly meeting with sub-contractor in discussing the progress of work and some issuses on permitting problems for installation of basepad and Head Guy, and side Guy.
 Supervised 3 teams and sub-contractor in conducting engineering studies to support networks: design conduit systems, buried and aerial facilities.; Proactively identify and design distribution for relief and modernization of existing Facilities.;
 Perform design analysis of OSP feeder and distribution facilities.
Carefully reviews and checks the plan if the customer standard engineering design criteria was met.
 Performs/ Designing and Planning of Fundamental Plan, , Fundamental Conduit Plan.
 Performs Supervised 3 teams and sub-contractor in conducting Detailed design of Primary and Secondary Network Cable plan and Geographical Plan.
 Estimate Bill of Quantities per primary and Secondary cable.
 Perform Quantity survey and prepare Billing based on Actual QS.
 Perform re-engineering or Site Instruction notices (SI) and cut-over plan for new implementation works.
 Prepare quotation for the Design of OSP Network.

Company industry:
Telecommunications
Job role:
Engineering

Assistant Engineer

June 1993 - April 1994

Philippine Long Distance telephone Company

Philippines

June 1993 - April 1994

 Performs acceptance test (Testing and Commissioning on newly installed OSP facilities);
 Tests all vacant and working pairs at MDF using Wheatstone Bridge, Dynatel 955 to 965 and Multi-tester;
 Supervises sectionalize testing of distribution or trunking cable and make evaluation
 Supervises Line Man/Cable Splicer in conducting installation test and correction of grounding.
 Prepares monthly budget/actual expenses consumed by Outside & Inside plant personnel. (Actual budget was based on liquidation of expenses.

Company industry:
Telecommunications
Job role:
Engineering

Education

MFI Polyclinic Institute Inc. (Formerly Meralco Foundation, Inc.)

October 2017

October 2017

Diploma, CCNA2 Routing and Switching Essentials

Philippines

Short Course on CISCO CCNA2 Routing and Switching: Routing and Switching essentials.
View attachment

MFI Polyclinic Institute Inc. (Formerly Meralco Foundation, Inc.)

June 2017

June 2017

Diploma, CCNA CISCO I

Philippines

Short Course on CISCO CCNA1 Routing and Switching: Introduction to Network.
View attachment

Pamantasan ng Makati

March 2001

March 2001

Master's degree, Public Administration

Philippines

Completed Academics only

FEATI University

October 1992

October 1992

Bachelor's degree, BSECE

Philippines

GPA (percentage): 67%

GPA (percentage): 67%

Dean's Lister Professional Electronics and Communication Engineer Board Passer

International Electronics and Technical Institute

March 1988

March 1988

Diploma, Electronics

Philippines

Electronics Service Technician Repair any Electronics Devices

Makati Polytechnic Community College

March 1986

March 1986

High school or equivalent, Secondary Level

Philippines

High School Level

Skills

Quality Assurance
Expert
Quality Assurance
Expert
Microwave
Expert
Microwave
Expert
Testing
Expert
Testing
Expert
Commissioning
Expert
Commissioning
Expert
Installation
Expert
Installation
Expert
Auto Cadd
Intermediate
Auto Cadd
Intermediate
MS Visio
Intermediate
MS Visio
Intermediate
MS Excel
Intermediate
MS Excel
Intermediate
MS Word
Intermediate
MS Word
Intermediate
MS Powerpoint
Intermediate
MS Powerpoint
Intermediate
Quality Assurance
Expert
Quality Assurance
Expert
Microwave
Expert
Microwave
Expert
Testing
Expert
Testing
Expert
Commissioning
Expert
Commissioning
Expert
Installation
Expert
Installation
Expert

Languages

Filipino
Expert
English
Intermediate

Memberships

IECEP

Member

April 1994

Training and Certifications

Training
Introduction to SDH, Hands-on up-grading of 1678MCC using acceptance procedure
Alcatel Training Center, Ormes France – April 6-14, 2009
Apr 2009
Introduction to ALU 1675 Lambda Unite Testing and acceptance procedure.
Alcatel Training Center, Nozay Villarceux
Jun 2010
Basic Occupational Safety and Health for Construction Site Safety Officer (BOSH)
Safeways Safety and Consultancy Services
Jul 2011
Show credentials
TETRA System Overview
Border Guard Training Institute Riyadh
Oct 2016