هشام حسين, Sr. Resident Engineer

هشام حسين

Sr. Resident Engineer

AE7

البلد
الإمارات العربية المتحدة - دبي
التعليم
دبلوم عالي, Project Management
الخبرات
32 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :32 years, 4 أشهر

Sr. Resident Engineer في AE7
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ ديسمبر 2015

Designation : Sr. Resident Engineer
Responsibility : Contract Administration including acting as the Engineer under FIDIC, lead a multi-disciplinary site based team and management of tenders, tender evaluations for Provisional Sum and Prime Cost items.
Major Projects

1- Maydan Sobha Community-Phase II, Mohamed Bin Rashid City, District 1 ( 2, 376, 000, 000.00 Dhs)
The project is residential community consist of 250 luxury G+1 villas and 35 luxury mansions with total built up area of 285, 520 m2, crystal lagoon, beach facilities buildings, retails center, nursery building in addition to external work such as hard and soft landscape works, street lighting etc..

Senior Resident Engineer في NAGA Designer and Planners
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ يناير 2014
Resident Engineer في Construction Project Management& Engineering Consultancy
  • الإمارات العربية المتحدة - دبي
  • فبراير 2014 إلى نوفمبر 2015

Responsibility :
Contract Administration including acting as the Engineer under FIDIC.
lead a multi-disciplinary site based team
Management of the site technical team
Major Projects

AKOYA DAMAC B+G+9 Residential and Service Apartments Buildings (400, 000, 000 Dhs)
The project is consisting of 6 residential buildings B+G+9 and 4 buildings service apartments B+G+9 in the community of Akoya Damac with total built up area of 110, 000m2

Resident Engineer في KHATIB &ALAMI (C.E.C)
  • الإمارات العربية المتحدة
  • يناير 2003 إلى يناير 2014

Responsibility :
Contract Administration including acting as the Engineer under FIDIC.
lead multi-disciplinary site based team
Management of the site technical team

Major Projects

1- Dar Wasl Residential Development (333, 000, 000 Dhs)
The project is residential community consisting of 87 Retails, 112 Apartment, 166 Townhouses and health club with the related landscape, road total built up area 150, 008 m2
2- Dubai Downtown 1KM Pedestrian Bridge Project &Infrastructure Works (400, 000, 000 Dhs)
The bridge provide air conditioned bridge between Dubai downtown metro station and Dubai mall Bridge is 1KM long .services deviation, new infrastructure networks, Piling works, steel structure are included .
3- Remram Housing Community Phase I (700, 000, 000Dhs)
The project is residential community consist of 20 buildings G+7 in addition to the service blocks
(Mosque, two health club) with total built -up area of 212, 660m2 landscape and hardscape works are included.
4- Green Community Motor City (860, 000, 000 Dhs)
The project is residential community consist of 286 luxury villas G+1, four identical buildings G+ 5, five recreation centers, commercial center with total built-up area of 270, 000m2 plus main artificial lake, two secondary lakes all external works such as landscaping, irrigation systems, infrastructure, roads are included
5- Dubai Festival City Al-Badia Resort phase II residential (160, 000, 000 Dhs)
The project is residential community with total built-up area of 46, 500 m2 is two residential buildings each building is five stories structure consisting of basement level, ground plus four upper floors of 1BR/2BR/3BR apartments in addition to 28 townhouses two and three stories. All external works such as landscaping and irrigation systems, mechanical & electrical infrastructure, roads and external lighting are included
6-UP Town Mirdif - Garden Apartments (85, 000, 000 Dhs)
The project is a residential building G+3 floors with built-up area 28, 000 m2, parking area to serve 180cars, 101 No’s of 2 bedrooms flats with the full required accommodations such as swimming pool
Children’s pool, Jacuzzi, landscaping and the common facilities

QC/QA Manager في AL-HUDA ENGINEERING WORKS
  • قطر
  • يناير 2002 إلى يناير 2003

Responsibility : Establish the company quality plan in order to achieve the ISO Certificate, prepare the quality plan for the projects in the tender stages, work as main contractor QC manager responsible for the civil and architect work in the project mentioned herein below
Major Project
1- Khalifa Sports Academy ( 250, 000, 000 QR)
Khalifa sports academy composed of five main buildings for associated sports and leisure facilities area in addition to five playgrounds and landscaping area

Quality Control Manager في EGYDAN PROJECTS MANAGEMENT EGYPT “Danish Company
  • يناير 1999 إلى يناير 2002

Responsibility : Manage a the supervision team, review the contractor’s method statements, sequence of
Work, quality plan .involved in testing and inspecting the civil and architectural works on site, verify the contractor compliance with the time schedule as well as the progress on site manage the project handling over process.
Major Projects
1 -Dreamland Sheraton hotel (200, 000, 000 L.E)
Dreamland Sheraton hotel consist of 230 residential rooms, swimming pool, underground tank grand court and park place surrounded by huge landscape area
2- Shopping Resort Project (60, 000, 00 L.E)
Shopping resort and park place projects consist of trade centers, markets, restaurants, theme places surrounded by landscaping areas

QC Engineer في BESIX CONSTRUCTORS “Belgium Company
  • مصر - القاهرة
  • يناير 1998 إلى يناير 1999

Responsibility : the responsibility include inspection of all the Civil works such as formwork, rebar and concrete placement for superstructure and core walls.
Major Projects
1- Cairo Maridine Hotel Tower ( 240, 000, 000 USD)
The project is multistory building 142-M height (870 residential rooms), conferences center, trade center multistory garage and three theatres.

QC Engineer في RAYTHEON - EBASCO ENGINEERS & CONSTRUCTORS “American Company
  • يناير 1992 إلى يناير 1998

Responsibility : The position is construction Q.C engineer responsible for inspection and overall verification of civil construction activities. These activities include drilled caissons, formwork, rebar, embeds, steelwork, architectural works (precast concrete wall panels, masonry, reflected ceiling, etc...) and quality control for materials
Major Projects
1- 1200 MW EL-Kurimat Thermal Power Station Project (800, 000, 000 USD)
EL-KUREIMAT power station is composed of two power generating units, each unit 600 MW.
Each power unit consists of a turbine generator pedestal, turbine generator building, boiler, chimney and a shared control building. In addition, several other structures (water intake and discharge structures, circulating water pipe system, water treatment building, administration building, etc…)
2- USA Embassy Extension Project (80 MILLION USD)
The project consist of administration building (basement+7floors), ambassador residence (basement+3floors) vehicle and pedestrian sally ports, underground tank in addition landscape areas

الخلفية التعليمية

دبلوم عالي, Project Management
  • في American University -Cairo -Egypt
  • يناير 2001

Project Management was granted after attending six semesters-long courses, 270 hours of practical training and factual projects submission in the following fields: Quality Control , Project Planning And Control Techniques , Management Of Project Resource Project Budgeting And Financial Control , Project Bids And Contracts , Feasibility Studies .

بكالوريوس, Civil Engineering
  • في Cairo UniversityAmerican University
  • مايو 1992

Specialties & Skills

Managerial Skills
Quality Control
Contracts
Project Management
Quality Systems
ARCHITECTURE
CONTRACT MANAGEMENT
ENGINEERING
LIGHTING
MECHANICAL
MICROSOFT WORKS
NETWORKING
PROJECT MANAGEMENT
QUALITY CONTROL

اللغات

العربية
متمرّس
الدنماركية
متمرّس
الانجليزية
متمرّس