WTG (Wind Turbine Generator / 3MW)
• Studies, reviews and checks all locations of electrical duck bank in all WTG locations for feeders and sub feeder lines including fiber optic cables.
• Monitors, supervises and inspects routings of cable trench near WTG towers prior to installation of XLPE cables for electrical duck banks.
• Review, checks and inspect all installed bare copper wire in all locations of towers.
• Review and check approved drawings for earthing system Prior for final Inspection Request of installed grounding cable (BCW) from inner layer of the foundation, pedestal and inner ring of the tower, including outside foundation with grounding test pit based on the standard form with specs.
• Monitoring and inspection of excavation of cable trench along south, west, ocean, east drive locations and additional towers in De Luna property.
• Inspection of excavation of cable trench prior to laying of power cable (XLPE), Fiber Optic
Cable and Bare Copper Wire (BCW). Including the depth and width of the cable trench based on the issued approved drawings and specifications.
• Monitors, reviews and inspects sand bedding, sand fill / backfilling to all routings and location of cable trench.
• Performed inspection on product received by supplier or material delivery on site.
• Reviews all schedules of loads based on the approved of the designer and consultants, and specifications.
• Reviews all standards according to the Philippine Electrical Code (PEC, IEC, ANSI) etc.
• Inspection of installed Switch gear in all 50 towers.
• Assign in all testing if power cable (XLPE) prior to termination of MV and HV cable inside the towers.
• Inspects all termination of MV and HV cable based on the submitted Method statement.
• Assign in Electrical and Mechanical Walk down Inspection to all 50 towers.
• Supervised and inspects testing of all power cable, fiber optic and BCW (continuity and megger testing) in all areas.
Yaw Building, Transformer, Shunt Reactor and RMU’s
• Studies, reviews and checks all locations of electrical duck bank of generator, transformer, shunt reactor and RMU’s.
• Monitoring, supervised and inspection of all the routings of grounding cables around the area.
• Reviews and checks locations of all grounding test pit in all locations.
• Inspection of final installation of power cable from RMU, Shunt reactor, transformer and generator to substation room.
• Reviews and checks schematic diagram and load schedule if all cable installed are based on the approved submitted cable size.
• Monitoring and inspection of final megger testing in all locations of all installed wires and cables.
• Perform Testing and commissioning of all installed equipment’s in all area.
OHTL (Over Head Transmission Line - 115KV)
• Studies, reviews and checks all locations of electrical grounding system in every tower (148 towers).
• Monitoring, supervise and inspects installed grounding cable and electrode rod to all pedestal
towers based on the approved drawings.
• Monitoring, supervise and inspects installed ACSR cable including sag and tension, stringing
works to all towers.
• Performed Inspection of approved materials prior to erection of individual towers.
• Review IR’s submitted prior for final inspection of all towers.
• Monitoring, supervise and inspects continuity and megger testing of individual towers.
• Final inspection of sag and tension to all towers, including OPGW and OHGW from switch yard to New Grid Corporation of the Philippines (NGCP).