honorio jr tabios, Project Engineer

honorio jr tabios

Project Engineer

Arabtec Construction WLL

Location
Qatar - Doha
Education
Bachelor's degree, Civil Engineering
Experience
23 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 9 Months

Project Engineer at Arabtec Construction WLL
  • Qatar
  • April 2014 to May 2020

Msheireb Downtown Doha Phase 2 Mixed‐use Hotel/Commercial Buildings/ Shopping Mall / Residential Msheireb Properties Al Waab City - Villas Client : NBK Properties

Company : Period of Services : Appointment : Projects :
Project Description :

Project Engineer at American
  • United Arab Emirates
  • October 2008 to March 2014

Contracting Company W.L.L., Qatar October 2008 to March 2014 Project Engineer The Pearl Qatar (Doha, Qatar), Viva Bahriya 3, 4 & 5, Porto Arabia Parcel 15A, 15B Porto Arabia Parcel 3A, 3B Mixed‐use Luxury Residential and Commercial Buildings

Field Engineer at Rashid Contracting Es
  • Saudi Arabia
  • July 2006 to July 2008

Saudi Aramco Oil Field New Location & Work Over Saudi Arabian Oil Company
• Supervised development of various well pads, utility pads, access roads for oil and gas exploration and work-over drilling of Saudi Aramco.

Project Engineer at Asset Builders Corporation
  • Philippines
  • June 1998 to July 2006

• Antipolo City Government Commercial Complex
• Cagayan Town Center Shopping Mall
• NHA-MRH Malabon Project
• National Electrification Administration Office Building
Company : Period of Services : Appointment : Projects :

Project Engineer at Federal Builders, Inc.
  • Philippines
  • January 1996 to January 1998

• Ever Calamba Shopping Mall
• The Orient Square, Commercial Building
• World Commerce Plaza (Sub-Structure)
• Metropolitan Hospital Overall Job Description : Project Engineer
• Weekly progress report for Snagging and De Snagging.
• Coordination works of MEP for Testing and Commissioning.
• In charge for project close out requirement related to Civil Defense
• Attend Client Progress meeting to discuss the weekly progress and engineering updates.
• Determine and develop construction method statement for the activity including risk assessment and job safety analysis and Inspection Test Plan and Checklist based on specifications of the project, relevant quality standards and Qatar Construction Specification 2014 (QCS 2014).
• Collaborate with the construction team to ensure that actual construction implementation is in compliance with the approved design provided at site, material used are approved and meet the quality standards; and approved construction method statement provided by the Consultant.
• In charge for the site execution either temporary or permanent works with regards to Civil, Structural and Architectural discipline.
• Review Shop Drawing as per the approved Design Drawing for Construction use.
• Prepare Weekly report for the work progress
• Prepare accomplishment report, change order and additional jobs for report billing.
• Prepare/revise working schedules for proposed and/or ongoing projects.
• Assists in monitoring quality of materials required, requested and delivered.
• To assist in preparation of materials list and delivery schedule.
• Review Material submitted by Subcontractor or Supplier as per Project Specification prior to submission to consultant
• Monitor jobsite accomplishments of the sub contractor and contractor.
• Assists in drafting contract's condition for subcontract jobs.
• Assists in preparation of other bid requirement that needs his expertise.
• Prepares & approves the progress of the sub contractors. Check payments estimates for job performed under the contract.
• Assists in settlement of contract claims and discrepancies.
• Coordinate with the accounting department on billing report.
• Prepare and check bar cutting list schedule and schedule of rebar deliveries.
• Prepare concrete construction joint schedule and to coordinate with post-tensioning contractor on stressing schedule.
• Follow up on the performance of the manpower, equipment and materials for site use.
• Design of formworks, scaffoldings and arrange the utilization schedules.
• Responsible for formwork permit to load and the permit to strike (for safety or structural reasons).
• Responsible in the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multi-disciplinary operations. Achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site. Carry out inspection and checking for all quality related procedures in the site.
• Collaborate with the construction team and sub-contractors to ensure that actual construction implementation is following the approved design provided at site, material used are approved and meet the quality standards; and approved construction method statement provided by the Consultant.

Education

Bachelor's degree, Civil Engineering
  • at technological institute of the philippines
  • October 1993

Specialties & Skills

Projectors
Project Management
CONSTRUCTION
ACCOUNTING
CIVIL DEFENSE
COMMISSIONING
OPERATIONS
DRAFT (BOILER)
SETTLEMENT
BILLING
JOB SAFETY ANALYSIS
MECHANICAL ELECTRICAL AND PLUMBING (MEP) SYSTEMS

Languages

French
Expert
English
Expert