Hossam Eldin Said Soliman, MEP Manager

Hossam Eldin Said Soliman

MEP Manager

Saudi technical company

Location
Saudi Arabia
Education
Bachelor's degree, Industrial Electronics & Control
Experience
21 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 9 Months

MEP Manager at Saudi technical company
  • Saudi Arabia - Hail
  • My current job since July 2017

• Evaluate engineering proposals, shop drawings and design comments, and recommend approval or disapproval.
• Attend weekly Project review meetings and report on MEP work.
• Supervision of installation/ testing MV transformers, Emergency generators, MV/LV Switchgear, MV/LV Cables, Cable tray/ladders, duct bank and Low current systems.
• Supervision of installation/ testing HVAC System (AHU's, FCU's, Fans, Duct work and accessories), Fire Fighting Systems (Wet Pipe Suppression System, Foam System (FM 200), Plumbing Systems (Water Supply, Drainage, Storm & Rain Water Drainage System)
• Ensure that the work is done as per the Issued for Construction Specifications and Approved Shop Drawings.
• Ensure the electrical materials delivered on site comply with approved shop drawings and contract specifications
• Verify all Electrical testing required by the contract.

Senior Site Electrical Engineer at NKY Architects & Engineers
  • Saudi Arabia - Riyadh
  • September 2014 to June 2017

Activity:

KAP2 (King Abdullah Project Second Phase). The client is MOI (Ministry of Interior) . The project types are generally building and building infrastructure. There are training camps, governmental offices, residential areas and school buildings in the projects.

Responsibility:

• Evaluate engineering proposals, shop drawings and design comments, and recommend approval or disapproval.
• Attend weekly Project review meetings and report on MEP work.
• Supervision of installation/ testing MV transformers, Emergency generators, MV/LV Switchgear, MV/LV Cables, Cable tray/ladders, duct bank and Low current systems.
• Supervision of installation/ testing HVAC System (AHU's, FCU's, Fans, Duct work and accessories), Fire Fighting Systems (Wet Pipe Suppression System, Foam System (FM 200), Plumbing Systems (Water Supply, Drainage, Storm & Rain Water Drainage System)
• Ensure that the work is done as per the Issued for Construction Specifications and Approved Shop Drawings.
• Ensure the electrical materials delivered on site comply with approved shop drawings and contract specifications
• Verify all Electrical testing required by the contract.

Site Electrical Engineer at PROGER Engineering and Management
  • Saudi Arabia - Riyadh
  • September 2013 to September 2014

•Evaluate engineering proposals, shop drawings and design comments, and recommend approval or disapproval.
•Attend weekly Project review meetings and report on MEP work.
•Ensure compliance with the QA/QC system. Develop and promote a quality mindset within the construction team and with the contractors.
•Document, record and report on meetings, progress of jobs and construction completions from design & validation reports from Project Engineers.
•Incorporate feedback from projects and customers for design clarification and modifications during the development and construction project phases
•Ensure that the work is done as per the Issued for Construction Specifications and Approved Shop Drawings.
•Ensure the electrical materials delivered on site comply with approved shop drawings and contract specifications
•Verify all Electrical testing required by the contract.

Senior Site MEP QA/QC Engineer at CONSOLIDATED CONTRACTORS GROUP S.A.L. Offshore
  • Egypt - Cairo
  • April 2011 to September 2013

Activity:

The Nile Corniche Cairo Project is mixed use development situation off the Nile River in Cairo, Egypt. It comprises Podium (levels 0-7 hotel operated ballroom, meeting rooms and restaurants. Includes Office and retail areas), Tower 1 (levels 3-32 hotel luxury serviced apartments) and Tower 2 (levels 1-18 hotel suites, levels 19-29 hotel serviced apartments and levels 30-35 hotel luxury serviced apartments)

Responsibility:

• Conduct all MEP Inspections as per Approved ITP's, and Approved Shop Drawings.
• Inspect the MEP materials as they are delivered on site to ensure compliance with approved materials submittals
• Installation/ testing MV transformers, Emergency generators, MV/LV Switchgear, MV/LV Cables, MV/LV Bus duct, Cable tray/ladders and Low current systems.
• Installation/ testing HVAC System (AHU's, FCU's, Fans, Duct work and accessories), Chilled Water Circuits, Hot Water Circuits, Condensing Units), Fire Fighting Systems (Wet Pipe Suppression System (Deluge System), Foam System (FM 200), Plumbing Systems (Water Supply, Drainage, Storm & Rain Water Drainage System)
• Ensure compliance with the QNQC system. Develop and promote a quality mindset within the construction team and with the contractors.
• Ensure timely close-out of project documentation/correspondence in close cooperation with the project services group and ensure timely reviews of project deliverables.

Senior Site MEP Eng. (Act as Electrical Manager) at Libyan Consolidated Contractors Company
  • Libya - Tripoli
  • December 2009 to March 2011

Activity:

Tripoli’s Complex Towers, an Iconic Commercial Development, is located on the Al- Safadi Street in Tripoli Libya. It comprises a five Star Hotel (620 keys) high rise tower (43 floors) in addition to high rise office tower (43 floors) providing high quality office spaces.

Responsibility:

• Coordinate Electrical work with General Electricity Company of Libya, GECOL
• Attend weekly Project review meetings and report on electrical work.
• Ensure resources are in place to execute the project control plan as well as analyze cost and schedule variances thereby recommending corrective actions.
• Installation/ testing MV transformers, Emergency generators, MV/LV Switchgear, MV/LV Cables, MV/LV Bus duct, Cable tray/ladders and Low current systems.
• Monitor electrical installation programme and production, and take action as necessary to ensure requirements are met.
• Full understanding of electrical drawings and scope of works.
• Assist with testing and commissioning
• Ensure others carryout their responsibilities under H&S legislation
• Implement project specific strategies for safety, risk, quality, planning, and the environment

Senior Electrical & Instrument Engineer at Orascom Construction Industries
  • Algeria - Oran
  • March 2008 to November 2009

Activity:

The project concerns the construction of Ammonia/Urea Complex Project. Fertilizer Complex 2 x 2, 200 MTPD AMMONIA and 1 x 3, 450 MTPD UREA.

Responsibility:

Installation, Testing, Commissioning and start-up of

• Electrical power supply 19- bay (GIS), Electrical power supply transformations (2*30MVA 60/10KV, 2*50MVA 10/60KV, 2*10 MVA 60/30KV, 6*12.5 MVA 10/5.5KV)
• 2*50MVA Combined Cycle Gas Turbine Generators
• Medium voltage Bus bar ducts, Medium voltage Switchboard, Medium voltage power factor correction
• Distribution transformers (24*2.5MVA 10/0.42KV, 6*1.2MVA 5.5/0.4KV ), Low voltage Bus bar ducts, Low voltage power centers • Low voltage motor control center, Auxiliary
• distribution switchboard, Low voltage power factor correction
• Emergency power supply system and Auxiliary system such as HVAC system, TVCC system, Public address system, Gas and fire alarm and Communication system.
• Ensure compliance with the QA/QC system. Develop and promote a quality mindset within the construction team and with the contractors.

Senior Site MEP Engineer at Orascom Construction Industries
  • Algeria - Algiers
  • February 2007 to March 2008

Activity:

The project concerns the construction of SEA WATER DESALINATION PLANT to produce 200, 000 m3 per day of potable water from seawater and located on the east of port of ALGERIA on the sea front build by OCI & BESIX for HWD.

Responsibility:

Installation, Pre-Commissioning, Commissioning and Start-up of

• Electrical power supply (GIS), Electrical power supply transformations ( step-down transformers 2'40MVA- 60KV/6KV)
• Medium voltage Bus bar ducts, Medium voltage Switchboard, Medium voltage power factor correction
• Distribution transformers (Step-down transformers 2*4MVA-6KV/0.6KV)
• Low voltage Bus bar ducts, Low voltage power centers, Low voltage motor control center, Auxiliary distribution switchboard, Low voltage power factor correction
• 110Vdc rectifier system, Uninterruptible power supply
• Power distribution to users, Direct burial and duct bank of Medium voltage and Low voltage Cables, Grounding protection and Lightning protection
• Emergency power supply system and Auxiliary system such as HVAC system, TVCC system, Infrared security system, Public address system, Clock system, Gas and fire alarm and Communication system.
• Grounding & Lightning protection, Cathodic protection
• Ensure compliance with the QNQC system. Develop and promote a quality mindset within the construction team and with the contractors.

Senior Site MEP QA/QC Engineer at Orascom Construction Industries
  • Afghanistan
  • August 2005 to February 2007

Activity:

The project involves Design Built in an combat zone, Qalat Province, Afghanistan, building over 150 new structures to support 4000 Afghanistan National Army Brigade, Temporary Facilities, Military Barracks, Dining Facilities, Power Plant, Water Treatment, Waste Water Treatment, Helipad, Stone wall, Chain link fence, Utilities etc.,

Responsibility:

• Preparation, approval and implementation of the Quality Control Plane (QCP), Quality Control System (QCS) and Definable Future of Work (DFOW)
• Conduction of Three-Phase of Control; Preparatory Meeting, Initial Phase Inspection, Follow-up Phase Inspection (Preparatory Meetings and Initial Inspections are intended to prevent non-conformances from occurring)
• Inspection of delivered materials as per Project Specs and Relevant standards
• Ensure that all materials and construction are in accordance with the requirements for the completeness, accuracy, constructability in compliance to the requirement to International Building Code (IBC).
• Documentation for material and administrative approvals and backups.
• Carry out and participate in weekly progress and QC Meetings
• Ensure to carry out all work in a safe manner in accordance with site rules and regulations.
• Carry out quality control checks as defined on quality plans as directed by Project Manager.
• Ensure that works are coordinated in an effective manner so that programmed objectives are achieved.

Site Electrical Engineer at Orascom Construction Industries
  • Afghanistan
  • March 2004 to August 2005

Activity:

Typical Project activities as mentioned above.

Responsibility :

• Installation and testing of 8 MVA Prime Power Plant, Water Treatment, Waste Water Treatment, MEP Utilities
• Installation/ testing HVAC System (AHU's, FCU's, Fans, Duct work and accessories), Plumbing Systems (Water Supply and Drainage System)
• Medium voltage power distribution systems up to 15 KV including Medium voltage Switchgear packages and Motor Control Centers, Unit substation transformer ( Step-up and Step-down transformer)
• Low Voltage distribution systems include distribution Boards and Low Voltage Cable, Lighting and External Lighting, etc.
• Light current Network Fire Alarm and Telephone/Data
• Lightning Protection and Grounding
• Responsible for initial startup and testing of new installations systems, etc.

Site Electrical Engineer at Polysius.S.A.S / ABB /Orascom Contracting Company
  • Egypt - Alexandria
  • August 2002 to March 2004

Activity:

Industries (OCI) Installation and Commissioning of Third line for Cement Production. In the areas of Raw Mill, Preheater, Kiln, and Cement Mill plants.

Responsibility:

• Co-ordinate effectively with Technical Division related to the site condition with the approved designs and appropriate decision with their concurrence.
• Erection and installation of the Machineries and Equipment of the Plant as per the Planning schedule to expedite the works to satisfy the client and the consultant.
• Test of the Power, Control and Instrumentation cables. Pre-Commissioning with the allowable test result and troubleshooting immediately wherever required.
• Responsible for initial startup and testing of new installations including cement kilns, clinker coolers, finish grind systems, etc.
• Familiar with Polysius roll presses, vertical roller mills, finish mills, air separators, kiln and auxiliaries.

Responsible for post-commissioning customer service purposes of process optimization.

Education

Bachelor's degree, Industrial Electronics & Control
  • at Menoufia University Faculty of Electronic Engineering
  • July 2002

PLC Programming, Microcontroller chip Programming, MS Offices, Auto CAD

Specialties & Skills

Electrical Design
Quality Management
Commissioning
Construction
Low Current System
MEP Testing
Electrical Consultant
Electrical Manager

Languages

English
Expert
French
Intermediate

Memberships

Saudi Council Of Engineer
  • Electrical Engineer Professional Degree
  • September 2014

Training and Certifications

Project Managment Diploma (PMP) (Certificate)
Date Attended:
September 2012
Valid Until:
November 2012