Senior Structural Bridge Engineer/ RE
CDMSMITH
Total years of experience :18 years, 2 Months
RTA Project R1020 : Upgrade of Dubai - AL Ain Road (two package- Contract 1A and 1B )
-RTA Project R1048 : Improvement of EXPO 2020 Roads Network, Dubai, UAE
- Midfield Terminal Complex (MTC), New Abu Dhabi International Airport.
Project Value : About U$D 6 Billion
Client : Saudi Railways Organization (SRO), Ministry of Transport.
Project Location : Kingdom of Saudi Arabia
Project Duration : Three Years
Project Description : Construction of the civil works for a High Speed Railway (360 km/h) electrified
passenger double line with a length of 450 km from Makkah to Madinah with all other
associated works. It contains more than 125 bridge between rail bridges, road bridges,
camel crossings and Wadi bridges and about 832 box & vehicle Culverts
Job Responsibility : - Supervising and Executing the Project as per Contract Conditions, Specifications,
drawings and relevant codes.
- Review and approve all submittals including shop drawing, materials, RFI and
calculation, Contractors time schedule, conducting regular site progress, coordination
Bi-weekly meetings,
- Provide technical leadership, Coordinate & monitor activities to my team (Civil
Engineers, Materials Engineer, Land Surveyors and Quantity Surveyors)
- Liaise with all parties for site safety.
Project Name
( 6 )
: Construction of Bridges at Regional Ring Road First sector from Suez to Ismailia
Desert Road
Project Value : U$D 65 Million
Client : General Authority for Roads, Bridges, Ministry of Transportation, Egypt.
Project Location : Cairo - Egypt
Project Duration : Two Years
Project Description : Construction of 22kms from Regional Ring Road consist of 2 freeway 41.2 m width &
2 service road 11.5 m width /each, Earth works vol. 3.500.000 m3, Sub base and base
layers, Three layers of hot asphalt mix (premix Macadam, binder and surface wearing
5
course), Road marking, Guard rail, Cat eyes, Newjersy walls, and Sign boards, Stone
Bitching, containing 4 Bridges & 2 Tunnels (50.000 m3 Rienf. Conc., 13.000 ton Rienf.
Steel)
- One Bridge over Railway, width 41.2 m, Length 440 m, 3.5 km Ramps, 11 Composite
Steel Span about 5000 tons, 19 Conc. Box section simple & continues Span, Bored
Piles Dim. 1.5 & 1 m totally 8020 Lm,
- Three Bridges intersect highway, width 41.2 m, average length 210 m/ each, 11.5
km Ramps, 8 Composite Steel span about 3000 tons, Conc. Box section simple &
continues Spans, Bored Piles Dim. 1m totally 3200 Lm
- Two Tunnel under highway, width 30 m, Length 41.2m (2 opining)
Job Responsibility : - Supervising and Executing the Project as per Contract Conditions, Specifications,
drawings and relevant codes.
- Responsible for Civil works, quality control, payment certification, variation orders.
- Reviewing and giving approvals for all submittals including shop drawing, materials
and calculation, Contractors time schedule, conducting regular site progress,
coordination meetings,
- Provide technical leadership, Coordinate & monitor activities to my team (Civil
Engineer, Materials Engineer, Land Surveyors and Quantity Surveyors)
- Liaise with all parties for site safety.
www.sbg.com.sa
Position : Bridge
1-EL-Warak Bridge length is 2.2 km and 45 m width, 4 Ramps consist of 6 navigation vents each one 120 m, 1.5m piles in River Nile and used Balanced Cantilever Method (post tensioned Pre-stressed Bridge).
2-Mosstorod Bridge length is 1.5 km and 26m width, 7 Ramps, 40m navigation vent on Ismallia Canal.
Grade: Excellent. -PMP® (
Grade: Excellent.
.