SITE ENGINEER (ASPHALT LAYING)
AIMSGROUP
Total years of experience :22 years, 5 Months
Project : Construction of roads, utility crossings & street lighting in Industrial area.
MESAIEED, DOHA QATAR.
Client : QATAR PETROLEUM.
JOB DETAILS:
Working as a Section In charge and executing road works such as embankment filling with
earth reinforcement system (interlocking modular wall), Sub grade, sub base, Aggregate
base course, Bituminous base course and bituminous wearing course, All the construction utilities, Hume pipe culvert and box culvert. A) Liaison with client
B) Day to day target fixing and achieving
C) Resources allocation
D) Planning, monitoring and scheduling
E) Quality, safety norms maintaining, preparation of weekly and monthly reports,
F) Recording measurments and certification of sub aggencies bills.
Project : Rehabilitation and up gradation of Surat Manor toll way project
National Highway No. 8 ( Package 1 )
Client : National Highway Authority of India
PROFESSION
A) CTUSG : Cement treated upper sub grade (Soil stabilization)
B) CSUC : Cement stabilized upper sub base
C) WMM : Wet mix macadam
D) ASPHALT LAYING : DBM, BC, WC
E) RENFORCED EARTH : Placing of Geogrid, Geo textile with Modular Block
F) RESOURCE MANAGEMENT : Allocation of Machinery & Manpower
Working as a Site Engineer looking execution of road works and monitoring as follows
Platform layer, Drainge layer, Embankment, Surcharge.
Construction of Asphalt Road from Lehban in Willayat Saham to
Kehnat in willayat Ibri
Client
Working as a Site Incharge and executing road works such as embankment filling with
earth reinforcement system (interlocking modular wall), Sub grade, sub base, Aggregate
base course, Bituminous base course and bituminous wearing course, All the construction
utilities, Hume pipe culvert and box culvert.
A) Liaison with client
B) Day to day target fixing and achieving
C) Resources allocation
D) Planning, monitoring and scheduling
E) Quality, safety norms maintaining, preparation of weekly and monthly reports,
F) Recording measurments and certification of sub aggencies bills.
A) Planing, Monitoring and Execution of works in road construction like Excavation,
Embankment filling, Lower sub grade & sub base, Cement treated upper sub grade,
Granular sub base, Cement stabilized upper sub base, Wet mix mecadam, Kerb laying,
(In situ), Dense Bituminous macadam and bituminous wearing course with Crumpled
rubber modified bituminous as per technical specification of MOST.
B) Optimum utilization of machinerys and man power
-