Resident Engineer for
Consulting
Total years of experience :6 years, 8 Months
Amman-Jordan
ww.cecsajdi.com
Appointed as a Resident Engineer for Construction works of Beira Storm Water Drainage System for Macurungo West area (Phase 1) / Beira City -Mozambique
The following main targets/goals have been achieved and conducted at the end of the project: Secondary S.W reinforced concrete channels 671 m length. Tertiary S.W reinforced concrete channels 5350 m length. Quaternary S.W reinforced concrete channels 1200 m length. Sewer network system 9300 m length. Pumping station. Roads 10000 m length.
Amman-Jordan
www.cec.com.jo
Appointed as Project Manager for Artisanal Fisheries Development Projects / The Gambia - Banjul City
The following main targets/goals have been achieved and conducted at the end of the project: Construction of fish market:
CV
Auction Hall-Steel Structure 900 m2. Administrative Block 300 m2. Retail Stalls-Steel Structure 700 m2.
Utilities and Allied Structures: Two ice Plant Machines and Three Chill rooms. Two Elevated Water Tanks and One Underground Water Tank. Roads and Yards. Water network (Ductile Galvanized and High-density polyethylene pipes with diferent diameters). Sewage network with diferent diameters. Storm water network with diferent diameter.
Construction of Community Fishing Centers at Bintang-Tendaba and Albreda: Double Seal Coat Roads at Bintang and Tendaba villages12Km Length with pipe box culverts and Irish crossing. Sanitary Facilities at Bintang-Tendaba and Albreda villages. Rehabilitation of Fisheries Buildings at Bintang-Tendaba and Albreda villages.
Appointed as Designing & Supervision Engineer - Highways & Bridges Designing Abu Al Hedan and Abu Al Zeegan reinforced concrete bridges, 24m length for each. Appointed with the staf of Dar Al Handasah Consultants who supervised the works of Alhasa - Ma'an main road as a site engineer, the total length of the road was equal to 80 km, the road included box, pipe culverts and three reinforced concrete bridges, the approximate cost of implementation the road was 70 million JD.