Ibrahim Naguib, Senior Mechanical Engineer/ MEP Coordinator

Ibrahim Naguib

Senior Mechanical Engineer/ MEP Coordinator

Dar Al-Handasah Consultants (Shair and Partners)

Location
Qatar - Doha
Education
Bachelor's degree, Mechanical power engineering
Experience
25 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 6 Months

Senior Mechanical Engineer/ MEP Coordinator at Dar Al-Handasah Consultants (Shair and Partners)
  • Qatar - Doha
  • My current job since February 2022

Projects: Katara Twin Tower, Lusail, Qatar Client: Katara Hospitality Projects Description: Lusail Katara Hotels (Twin Towers) and Floating Island at Marina District, Qatar. Supervision of construction for a landmark attraction consisting of 2 twin towers resting on a common podium, and destined to accommodate separate 5-star and 6-star hotels (360 and 149 keys respectively), branded apartments (101 keys) with high end finishing in addition to rooftop cigar lounge/restaurant and large ballrooms. Total built-up area: 292, 500 m², with a total cost estimated at about 3500, 00 million Qatari riyals. Responsibilities:
➢Review MEP contractor shop drawing prior to submittal for service co-ordination and co ordination with other construction elements
➢To advice on any impact on services caused by Architectural changes and raise Query to MEP Manager & design Consultant.
➢Review material/ equipment technical submittals from MEP contractor for specification compliance.

MEP Coordinator/ Team leader. at ECG Engineering Consultants Group S.A., Doha, Qatar
  • Qatar - Doha
  • November 2019 to February 2022

Project: North Gate Mall and Office Buildings, phase 1.
Project Description:

The project consists of a commercial mall and 6 administrative buildings with a total built up area of about 466, 030.66 square meters, with a total cost estimated at about 1600, 00 million Qatari riyals.

The North Gate Mall project is a major new development project on the busy northern road in Doha, the project consists of a shopping center with 280 stores including five major stores, a state-of-the-art Cineplex, and a variety of store types including jewelry, fashion, sports, electronics, and supermarkets. A crystal garden filled with luxury shops and a landscaped terrace with suites and 4000 parking spaces. Imagine that the North Gate is the northern gate of Doha, North Gate aspires to the top of market in Qatar and Middle East.





Responsibility:


- Manage construction supervision team, quality control, hand over and other site operations related to MEP.
- Coordinate with all concerned parties and relevant stakeholders on all construction (and design) issues.
- Attending regular meetings (work progress, coordination, design, etc.) with the client representative, project management, main contractor and subcontractors to discuss all key issues related to the project and effective corrective actions.
- Oversee and monitor Quality Assurance (QA/QC) regarding all technical aspects/ installation of all work for compliance with the plans, specifications, and industry standards.
- Oversee and monitor that all applicable tests and frequent inspections are performed, witnessed, and documented in accordance with approved procedures as per local regulations and international standards.
- Monitor concerned authorities (agencies) approvals.
- Oversee and monitor to obtain the building completion certificate.
- Obtain client’s acceptance/ sign-off for the completed project and the closeout procedures.

MEP Project Manager at ECG Engineering Consultants Group S.A.
  • Qatar - Doha
  • April 2016 to November 2019

Project Description: The project consists of a commercial mall and 6 administrative buildings with a total built up area of about 466, 030.66 square meters, with a total cost estimated at about 1600, 00 million Qatari riyals. The North Gate Mall project is a major new development project on the busy northern road in Doha, the project consists of a shopping center with 280 stores including five major stores, a state-of-the-art Cineplex, and a variety of store types including jewelry, fashion, sports, electronics, and supermarkets. A crystal garden filled with luxury shops and a landscaped terrace with suites and 4000 parking spaces. Imagine that the North Gate is the northern gate of Doha, North Gate aspires to the top of market in Qatar and Middle East. Responsibility:
-Manage construction supervision team, quality control, hand over and other site operations related to MEP.
-Coordinate with all concerned parties and relevant stakeholders on all construction (and design) issues.
-Attending regular meetings (work progress, coordination, design, etc.) with the client representative, project management, main contractor and subcontractors to discuss all key issues related to the project and effective corrective actions.
-Oversee and monitor Quality Assurance (QA/QC) regarding all technical aspects/ installation of all work for compliance with the plans, specifications, and industry standards.
-Oversee and monitor that all applicable tests and frequent inspections are performed, witnessed, and documented in accordance with approved procedures as per local regulations and international standards.
-Monitor concerned authorities (agencies) approvals.
-Oversee and monitor to obtain the building completion certificate.
-Obtain client's acceptance/ sign-off for the completed project and the closeout procedures.

Senior Mechanical Engineer at ECG Engineering Consultants Group S.A., Doha, Qatar
  • Qatar - Doha
  • May 2013 to April 2016

Projects:
1- Four high, 4P+M+22 Floors -Pearl, Doha, Qatar, at a total cost estimated at about 2000 million riyals Qatari.
2- JW Marriott Hotel Tower, Doha, Qatar (3B+G+M_51)
3- Project of ten new government schools (three groups) around Doha and the villages, at a total cost estimated at about 350 million Qatari riyals.
4- A project for restoration and reconstruction of the heritage in the places of large, varied heritage, at a total cost estimated at about 350 million Qatari riyals.

Responsibility:
Responsibilities include: Reviewing mechanical shop drawings, material submittals, Active participation in technical and progress meetings, reviewing of mechanical shop drawing logs, interacting with concerned parties to fulfill project requirements. Reviewing of the Testing and Commissioning submittals of mechanical services, reviewing and approval of As-built drawings, snagging before and during the handing over of the project.

Senior Mechanical Engineer / Mechanical Department Head. at ECG Engineering Consultants Group S.A., Cairo, Egypt.
  • Egypt - Cairo
  • July 2009 to April 2013

Project: Madinaty City, New Cairo, Egypt
Project Description: 4000 million EP consists of:
1- Open air mall 4 - Madinaty sport club
2- Leisure pool 5 - Medical centers
3- villas and apartments comprising 364 apartment buildings in the first area, 109 apartment buildings in the sixth area, 1105 villas in villas area, Madinaty Landmark and all related infrastructure for these areas.

Responsibility:


- Manage construction supervision team, quality control, hand over and other site operations related to MEP.
- Review and approve the material submittals, shop drawings, method of statements for all the activities and final testing -pre commissioning and commissioning’s method of statements.
- Review and approve the material submittals, shop drawings, method of statements for all the activities and final testing -pre commissioning and commissioning’s method of statements
- Supervising and inspecting the delivery of on-site materials, site mockup and the installation inspections as per the approved shop drawing and in compliance with the regulations and manufacturers ‘recommendations.
- Responding to Contractor RFIs of design and coordination issues.
- Coordination and preparation for inspection of local authorities and obtaining their approval.
- Coordination with the project parties to collect the closing documents in order to handing over the project to the client and end user.

Quality Control Engineer. at SAAD Companies Groups, Khobar, Saudi Arabia.
  • Saudi Arabia - Khobar
  • June 2006 to June 2009

Project: SAAD Specialist Hospital - Oncology center.
Project Description: 2000 million SR worth Consists of:
- Saad Specialist Hospital consists 600 beds.
- SSH is located in Al Khobar in the Eastern Province of Kingdom of Saudi Arabia. It is located within few miles away from Dammam and Dhahran.
- SSH was built and constructed according to the highest international standards and it is accredited by Joint Commission International (JCI)

Responsibility:
Responsibilities included: Reviewing the mechanical design and shop drawing to be carried out, performing the QC rules over the erected works, approving the Testing procedures for the Mechanical systems, carried out all the pre-operation tests and commissioning for the mechanical Components.

Client Consultant Technical Office Engineer. at Imam Abdulrahman Bin Faisal University
  • Saudi Arabia - Khobar
  • October 2004 to May 2006

Project: Imam Abdulrahman Bin Faisal university _ PERMANENT CAMPUS PROJECT
Project Description: 6800 million SR worth Consists of

• Utility building and Plants:

 Chilled water Plant water cooled with a total capacity 14, 100 Tons.
 Sewage Treatment Plant (STP) with a peak Flow 7208 m3/day.
 R.O Plant for sweet water production 600 m3/day.
 Storm water Pump station…. etc.

• Site Networks:

 Hydronic piping (Chilled/ Condenser water network, RTRP piping and fitting).
 Plumbing network (Raw water, Firefighting and drinking water)
 LPG Network including storage tanks with a total capacity of 46000 gals, electrical vaporizers, Pumps, PRS and instrumentations.
 Sewage Network.
 Irrigation system network……. etc.

• Buildings:

 Several different College buildings.
 University Hospital.
 Stadium and sport hall.
 Male and female libraries.
 Male and Female Student recreation centers. ….. etc.
 Male and Female student, Lectures Teacher and Prof. housing

Responsibility:
Mechanical Services Division, responsibilities included Reviewing the mechanical design of the project, Performing the auditing tasks over the various consultant offices, which supervise the project contractors (like, Beeah office, Saudi consulting services office \{Saud- consult\}), Establishing the erection checklists for the various mechanical system components installation, Performing the QC rules over the erected works, Auditing the Site Safety Instructions, Approving the tests and commissioning Procedures for the mechanical systems .

Site Projects Engineer. at , Horizon contractor for HVAC Contracting, Cairo, Egypt.
  • Egypt - Cairo
  • July 1998 to April 2004

Position: Site Projects Engineer.
Project: Alexandria National Museum, Egyptian Radio and Television Building and (ABO SHAQRA) 5 Stars Restaurant.


Project Description: 30 million EP Consists of:
I. Alexandria National Museum, Alex., Egypt.
The project consists of four stories building; responsibilities included installations for chilled water system with total cooling capacity of 160 T.R, as well as the testing and air balancing for the system.

II. Egyptian Radio and Television Building, Nile Cornish, Cairo, Egypt.
The project consists of eleven stories building, responsibilities included air balancing works for approximately 54 AHU and 26 Fans (installed by others) to get the required air quantities with the suitable sound level in office spaces and studios.
III. (ABO SHAQRA) 5 Stars Restaurant, Maadi, Cairo, Egypt.
The project consists of three stories building; responsibilities included installation of HVAC works with cooling capacity of 30 T.R., direct expansion system, and kitchen ventilation. For kitchen hoods, etc.).

Responsibility:
Responsibilities included: Site activities such as inspection for installation, material, preparing site inspection, NCR. Interacting with concerned parties to fulfill project requirements, testing and commissioning of mechanical services, reviewing and approval of As-built drawings, snagging before and during the handing over of the project.

Education

Bachelor's degree, Mechanical power engineering
  • at Cairo University, Faculty of Engineering
  • May 1998

mechanical engineering, very good project degree

Specialties & Skills

INSTALLATION
INTERNATIONAL STANDARDS
OPERATIONS
QUALITY CONTROL
CONSTRUCTION
SHOP DRAWING
MECHANICAL ELECTRICAL AND PLUMBING (MEP) SYSTEMS
COMMISSIONING
DRAWING
SUBMITTALS (CONSTRUCTION)

Languages

English
Expert

Memberships

Member of the Egyptian Syndicate of Engineers.
  • "Trust in engineers, their training and qualification during the graduation stages, followed by moni
  • July 1998
Qatar , grade A MMUP
  • Certified engineer
  • July 2017

Training and Certifications

UPDA GRADE A /MME,QATAR (Certificate)
Date Attended:
July 2017

Hobbies

  • Soccer and reading
    Many school and club championships have been achieved, both before university and currently I only practice those sports as a hobby.