Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

imad abuasi

Senior Project Manager

Aecom

Location:
Saudi Arabia
Education:
Bachelor's degree, Civil Engineering
Experience:
34 years, 9 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  34 Years, 9 Months   

October 2018 To Present

Senior Project Manager

at Aecom
Location : Saudi Arabia - Riyadh
ZATCA PMO Program
Lead the management and delivery of a EPMO program wide projects specifically in KSA Eastern Region (Al Batha Land Port and Salwa Land Port) to achieve the 2030 Vision within ZATCA (Zakat, Tax and Customs Authority).

Responsibilities:
- Maintain and provide consistency of service delivery across the EPMO programme for my assigned region (Eastern Region Land Border Crossings).
- Provide leadership and direction for the functional areas of EPMO, including knowledge transfer.
- Guide, inspire, motivate, and encourage a high performing team environment.
- Provide expertise to ZATCA for developing the EPMO processes and procedures necessary for the delivery of the agreed upon strategy.
- Lead and manage the project team through all projects’ phases consistent with established project delivery processes to the meet the scope, schedule, and budget.
- Oversees establishment of Project Charters, Project Execution Plan, Project Stakeholders Engagement Plan, Project Delivery Strategy Plan, Quality Assurance/Quality Control Plan, and other documents as required.
- Ensure that a formal risk management process utilizing agreed risk register and management process.
- Engage with all aspects of recruitment interviews for approval of the Construction Supervision Consultant team on site and monitoring performance of the personnel.
- Develop organizational breakdown structures and human resourcing requirements, formal routes of reporting, and team development appraisals.
- Support preparation of the SOW, BoQ, and Milestones for the projects and other related RFP documents and attended meetings with Stakeholders to include their necessary requirements in the SOW of the projects prior to tendering.
- Managed prequalification evaluations for selecting external consultants and contractors to be added to the qualified list to bids reflecting previous and current projects scopes, financial statements, and expertise requirements.
- Managed technical evaluations for selecting tenders.
- Review and approve proposed design changes, addendums, and claims arising from awarded construction contracts.
- Assign site project managers and site engineers to projects and maintain functional responsibility of site managers and site teams.
- Maintain projects delivery schedule and monthly reports.
- Assess the capability of ZATCA existing engineering staff and assigning appropriate roles and responsibilities.

Key projects:
- Albatha Land Border Crossing Region:
- Albatha Land Port Essential Facelifting Project. (SAR 204M).
- Albatha Land Port Water Main Pipelines Network. (SAR 33M).
- Albatha Land Port Residential City Wastewater & STP Refurbishment Works (SAR11M).
- Albatha Land Port Firefighting and Alarm Systems (SAR16.5M).
- Albatha Land Border Crossing New Housing Project (SAR 136M).
- Al Batha Land Port Landscaping (SAR 3M).
- Albatha WTP Refurbishment project (SAR 20M).
- Al Batha Land Border Crossing Detailed Design for Cargo Prototype (SAR 12M).
- Other projects.
- Salwa Land border Crossing:
- Salwa Land Border Crossing Enablement Works (3 phases SAR187M).
- Salwa Temporary Housing for world Cup additional employees (SAR 36M).
- Salwa Land Port Welcome Centre, needed for additional capacity for World Cup (Sar 103M).
- Refurbishment Works for WTPs and a 120km water Pipeline (SAR 98M).
- Housing for 400 family units and 200 single units in Salwa Land Border Crossing (SAR 362 M).
Other projects.
October 2017 To October 2018

Construction Manager

at Aecom
Location : Saudi Arabia - Riyadh
Study & Preparation of Project Documents for the Design & Execution of 600 Dams - MEWA, KSA, (Tabuk, Madinah, Makkah, Asir, Abha, Jizan, and other regions).
Client: Ministry of Environment, Water, and Agriculture

The program included: Hydrological Studies, analysis of Potential 600 dams’
locations. Mobilization of multiple geotechnical resources for soil investigation. Liaise with local government ministry representatives in various KSA regions. Collect all available data. AECOM was undertaking the conceptual design. RFP’s will be prepared for packages which will comprise of comprehensive tender documents, prepare a pre-qualification document, tender evaluation criteria and evaluation matrix.


Responsibilities:
- Visiting proposed dam sites in remote areas in various regions in KSA (Tabuk, Madinah, Makkah, Hail, Qassim, etc.) to provide detailed assessment of the proposed dam locations, utilities, access to sites, existing developments, farms, settlements, water wells, overhead powerlines, or transmission towers.
- Ensure all safety and security issues for the visiting team are being managed and the safety plan and site visit journey plan are in place and are being followed.
- Participated in preparing and checking the Site Visit Reports.
December 2016 To October 2017

Construction Manager

at AECOM
Location : Saudi Arabia - Riyadh
Waad Al Shamal “Northern Promise” 450 km Pipeline Project
Client: National Water Company.

The Waad Al Shamal project consists of the design and execution of treated water transmission 450km pipelines to the project of King Abdullah Waad AL Shamal City Industrial Development. The pipelines are running from Sakakah, Arar and Turaif cities in North of Saudi Arabia to Waad Al Shamal Development Industrial city. The network is composed of several installations of Pumps Stations, Surge Towers, and Storage Tanks.

Responsibilities:
- AECOM’s Team Leader on sites to take custody of the project and evaluate actual progress of the works after the client terminated the contract of previous contractor and consultant teams on the project due to severe delays.
- Prepared a complete termination field survey report to assist the client in processing final payment for the contractor.
- Prepared Survey of Existing WWTPs report.
May 2015 To December 2016

Department Lead and Senior Utility Engineer

at AECOM
Location : Saudi Arabia - Jeddah
Jeddah Public Transportation Program (JPTP)
Client: Metro Jeddah Company / Jeddah Governorate

The program included Metro Transit System (Orange, Red, Blue, and Green Metro rail lines), Commuter Rail linking North and South Jeddah, LRT and Tram, Marine Transportation Lines (Ferries and Water taxi services), Buses Network, AL-Muntalaq Public Transportation Station, Obhur Suspension Bridge and other secondary bridges, and Parks and Rides facilities.
AECOM Pre-PMO contract: To support the planning and the design work for the Jeddah Public Transportation Program in its initial phase.
Job Task: Dept. Eng. Lead (Design Packages 3 and 8),
Job Task: Technical Coordinator (Design Packages 3 and 8)
Job Task: Senior Utilities Eng. (Multi Design Packages - 2, 3, 5, 6, 8, and 9)
Package 2: Metro Rails System (Orange, Red, Blue, & Green lines).
Package 3: Commuter Rail Services
Package 5: Bus Services (BRT, Feeder Buses, and Long-Distance Coaches)
Package 6: Marine Services (Ferries and Water Taxis)
Package 8: Obhur Creek Iconic Bridge and Secondary Bridges and Interchanges.
Package 9: Park and Ride Automated Multi-Levels Facilities

Responsibility:
• Reviewed dry and wet utilities drawings and diversion studies prepared by the Preliminary Design Consultant for the packages and commented on them.
• Reviewed collected utilities data provided by local authorities.
• Reviewed various Alignment Descriptive reports.
• Reviewed alignments drawings and commented on them.
• Managed, coordinated, and supported the review process for the assigned design packages between AECOM (in kingdom design team) and the various selected AECOM international senior technical directors / reviewers in (UK, Paris, Hong Kong, Madrid, UAE, Riyadh) to expedite closing multi discipline engineering documents packages and filtering the engineers’ comments.
• Ensured the generation of engineering design deliverables prepared by the PED Consultant.
• Attended Engineering Department Meetings.
• Ensured appropriate checking and review of all documents (reports and drawings) before releasing / closing them.

Key projects:
• Obhur Creek Iconic Bridge and Secondary Bridges and Interchanges.
December 2014 To May 2015

Construction Manager

at AECOM
Location : Saudi Arabia - Jeddah
King Abdullah Bin Abdul Aziz Public Education Development Program
(Schools Construction Program)
Client: Tatweer Buildings Company TBC / MOE

Responsibility:
• Member of a committee (TBC, MOE, AECOM) to survey sites in various cities like Jeddah, Rabigh, Khulais, and Makkah to be developed for new schools’ projects to determine if the sites have any obstructions, fill material, and the availability of utilities.
• Member of a committee (TBC, MOE, AECOM) to examine old existing vacant or occupied schools to determine if they need to be demolished and replaced or if they need repairs (in Makkah, Jeddah, and Khulais).
• Participated in assisting the client in supervising local contractor and local consultant for new schools’ projects packages in various districts in Makkah city.
August 2011 To December 2014

Construction Manager

at Aecom
Location : Saudi Arabia - Jeddah
Jeddah Storm Water Drainage Program (JSDP)-
Makkah Governorate Amara Province,
Saudi Aramco

- Wadi Quraa Channels and Wadi Muraygh Dam (Feb. 2013 - Dec. 2014)
47 km long open channels and Dam
Duties and Tasks: Package Lead and Senior Civil Engineer,
(Field Engineering Support Department)

Responsibilities:
• Worked with the design engineers (in house and in UK) and managers by providing efficient, reliable, and responsive service to them when reviewing and checking design drawings, shop drawings, and resolving field issues. My job included but was not limited to the following: Carried out site investigation and prepared reports as required by the design team, reviewed revised drawings, checked IFB, IFAs drawings, Contractor’s shop drawings, assisted in responding to TCQs, and communicated to Leed Office in UK regarding changes and updates.
• Attended Interface meetings with Ministry Of Transportation, Saudi Railway Organization, Saudi Electric Company, and National Water Company to resolve conflict issues such as lowering culverts, widening of roads, discussing channels alignments, constructing pedestrian bridges, and relocation or protection of utilities.
• Attended meetings to identify utility conflicts with various utility providers.
• Prepared Interface Arabic Written Agreements and Arabic letters.
• Worked with young Saudi Engineers and assigned various related field coordination tasks to them to resolve conflicts issues on the 47km long project.
• The Design Team takes benefit from having a fluent technically competent Arabic speaker to assist as and when required. I help the team to translate all letters that we receive from the stakeholders to provide response quickly. This has been critical during the land acquisition process.

- Ghulail Dam: (March 2012 - February 2013)
Scope of work: Constructing Main Dam (250M long, 10M high) and Wing Dam (990M long, 6M high), constructing Access Roads, and providing a catchment Inundation water storage area with a 1M m3 volume.
Duties: Construction Manager

Responsibilities:
- Monitoring progress of construction and initiate corrective steps if required, to ensure schedule dates are met.
- Raised potential Time Cost impact and report of variation to JSDP Project Manager.
- Participated in the weekly progress meeting, daily staff meetings (in house), and daily meetings with the contractor and update the management with status.
- Made sure all the staff on site follow QA/QC procedures and follow safety procedures.
- Worked closely with the contractor’s managers to open new work fronts, anticipate issues before occurrence, and provided solutions to utilize equipment and manpower to expedite progress ahead of schedule.
- Ensured that the latest drawings & documents are available to project field personnel.
- Supervised a team of Area engineers, Construction Supervisors, and Projects engineers and made sure they work closely as one team with QC and Safety Teams and requested them to update me on their daily accomplishment and what value they add to the project.
- Managed completing exception items for the project and verified all red marking and as built drawings.

- Critical Hot Spots Areas (The JSDP urgent Works Projects)
12 Flood Areas in Jeddah-
Duration of the Urgent works: 110 days
Duties: Construction Manager

Responsibilities:
My responsibility was supervising work at three critical flood areas: 1, 1A, and 6 (Underpass at King Abdullah and Andalus, Al Corniche at Al Hamra Street, and Al-Salman Underpass near the Royal Salam Palace).
Duties: Supervised the construction of storm water drainage lines (gravity and pressurized), manholes, catch basins, perpendicular road drainage system, Swales, rebuilding Pumps Station, slow down chamber, out fall chamber, relocating of utilities, and Asphalting roads
April 1992 To August 2011

Associate Project Manager

at New York City Department of Environmental Protection - Bureau of Eng. Design and Cons.
Location : United States - New York
New York City Department of Environmental Protection,
Bureau of Engineering Design and Construction,
New York, USA

I took the role of on-site Associate Project Manager of the projects assigned to me. I had excellent leadership and communication skills on the construction sites to deal with various levels namely: field engineers, inspectors, testing engineers, design services engineers, mechanical and electrical engineers, surveyors, geologists, auditors, prime contractors, subcontractors, local government agencies, and private construction management consultants. I directly managed a big team of 9 members depending on the stages of the project. To efficiently take care of various projects sites and the activities of the big team, I structured the whole process and imparted training to members so that all activities are carried out as per the structure and I ensured that I get daily updates of tasks from my team. The scope of the projects that I worked on included: Pre-Construction work, excavation and earthwork, mass concrete work, steel reinforcement, installation of 48-inch, 60-inch, and 96-inch diameter pipes, cofferdams and underground distribution chambers, installation of plumbing, H.V.A.C. equipment, and underground construction including tunnels using Tunnel Boring Machines (TBM), and water supply shafts. I gained enough years of construction management experience that made me experienced in the heavy construction and infrastructure sector. The values of the projects that I worked on were ($ 26 Million, $ 190 Million, $145 Million, and $68 Million, $668 Million, and $92 Million).
June 1989 To April 1992

Assistant Project Engineer

at Turner Construction Company
Location : United States - New York
Turner Construction Company, New York City, NY, U.S.A
Assistant Project Engineer

The Sutton Department Stores Project (small mall project):
104-106 and 110-114 Delancey Street, South Manhattan.
Construction of two new commercial buildings directly adjacent to the underground (F) train subway line and Delancey Street subway station and surrounded by old commercial buildings.

Responsibilities:

• Inspected and supervised work performed by all subcontractors including excavation, foundation, (sheeting - shoring), underpinning, stairs, drywall, masonry, and plumbing.
• Reviewed and processed all shop drawings between all subcontractors and architect and design engineers.
• Negotiated scope changes and prepared change orders.
• Prepared CPM charts, extension of time and delays reports, and daily construction reports.
• Reviewed payment application and prepared monthly projected budget reports.
• Reviewed scope of work with subcontractors prior to
• signing contracts to make sure they understand their obligation.
• Checked the subcontractors’ experience record prior to issuing contracts to make sure the best is hired.
• Followed up with the expeditor on all required permits on the job to make sure we get the permits on time.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
June 1989

Bachelor's degree, Civil Engineering

at Pratt Institute
Location : United States - New York
Bachelor of Engineering in Civil Engineering
Brooklyn, New York

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

Arabic

Native Speaker

English

Expert

Loading
Loading...
Loading...