Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Irfan Ali, Electrical engineer

Irfan Ali

Electrical engineer·Mohammed Al Ojaimi Cont. & Esatablishment

Saudi Arabia

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 15 years, 7 months

Electrical engineer

July 2016 - Present

Mohammed Al Ojaimi Cont. & Esatablishment

Dammam, Saudi Arabia

July 2016 - Present

• Leading Electrical, Civil and Mechanical Teams. Co-ordinate with EPC, consultant /client/ Subcontractor and customer. Handling project request (RFI, RFC, RFA, PR, PO etc…)
• Plan & profile, Sag and tension calculation, route with spotted structures.
• Clearance calculation, Conductor/OPGW fittings and joint box fittings and grounding details.
• Underground 1200mm2 and 2000mm2 cables rout/SS entrance.
1. 115KV BSP to Substation No: 2 & 5 (Energized) 10km Monopole OHTL.
2. 115KV BSP to Substation No: 3 (Energized) 12.6km OHTL.
3. 115KV BSP to Substation No: 4 (Ongoing) 3.2km UG.
4. 115KV BSP to Substation Ras ul Mishaib (Energized) 4km OHTL.
• Erection of GIS - BSP 380/115/13.8 KV Power Transformers (502, 67MVA).
• Receiving permit from SEC, raising material request, coordinate with designing team.
• Make Technical Proposal on site and field change notice (FCNs).
• Make a Co-ordination with Civil/Electrical/Mechanical staff in order to complete the work within the time frame. To prepare activity plan or bar chart, activity working schedule and running of project according to given schedule.
• Prepare Request for Inspections, MIR and Quantity take off Sheets. Execution of 380/115/13.8
KV, (UG) 1200mm2, 2000mm2 Cables including (Excavation, Testing, Backfilling, Protection
Tiles, warning Tape) Duct Banks and Unit Substations according to drawing and Standard.
• Consultation with manufacture’s manuals to determine installation, commissioning & startup.
• Follow-up and negotiating NCR related issues with supplier and client
• Inspecting and following of work progress; GIS, HVAC, Fire alarm system and testing commissioning to meet the time plan. Revises site assembly drawings, wiring schematics and related technical drawings, to include updating and as-built works.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Assistant Manager Operations

May 2014 - May 2016

PESCO ( WAPDA) Pakistan

Peshawar, Pakistan

May 2014 - May 2016

• Identify resources needed and assign individual responsibilities, manage day to day operational aspects of project and scope. Review deliverables prepared by team, apply methodology and enforce project.
• Monitor the construction activities of Transmission line such as Erection stringing, Conductor pulling, Sagging, Clipping, installation of spacer damper and vibration.
• DC Auxiliary power supply system. Lying and familiarization with all working drawings.
• Bus bar / cable laying tray system etc.
• MV and LV motor insulation and winding resistance test.
• Testing and commissioning of control panel of 6.6 KV.
• Fair knowledge of fire alarm system.
• Installation of MICC cable, gladding & panel erection
• Installation test of OPGW
• As an Electrical Engineer conduct the inspection during Retrofitting and check The OPGW Pulling, sagging and clipping, coordination between WAPDA & contractor.
• Any discrepancies at work noticed, advise them to a good solution to solve the problem as per approved IFC drawing.
• Received the RFI from the contractor to conduct inspection of work as requested by contractor.
• Documenting all inspections and tests on form as required by the project quality assurance plan.
• Prepare Transmittals and send to WAPDA for Review and Approval.
• Prepare Submittals and send to Contractor. Maintain log sheet for Transmittals and Submittals Review the contractor Drawings.Representation of Company in project site meetings and liaison with the Clients/Consultants.
• Work on all programs received from planning division for each and every project to meet the handover of each project on time. Planned, managed and executed following turnkey works;
• Complete construction of 132KV/11KV/440, AIS substation S/S, 11 Bays.
• Complete construction of 220KV AIS (Two Circuits).
• To deal with engineering staff and man power activity, quality control of the projects.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Electrical engineer

November 2011 - March 2014

BinOmran Trading & Telecommunications

Doha, Qatar

November 2011 - March 2014

• ISP, OSP installation, maintenance and activation.
• Overall coordination liaising with clients and consultants, contractors and vendors regarding execution of job and planning/ scheduling of site activities, technical specification, approval and obtaining statutory clearances.


• Carrying out the inspection and testing of materials in accordance to quality plan & to satisfaction of consultant.
• Weekly & monthly progress report to the management.
• Inspection of switch gear panel installation and cable termination and bus bar torque.
• DC Auxiliary power supply system. Lying and familiarization with all working drawings.
• Bus bar / cable laying tray system etc.
• MV and LV motor insulation and winding resistance test.
• Testing and commissioning of control panel of 6.6 KV.
• Fair knowledge of fire alarm system.
• Installation of MICC cable, gladding & panel erection.
• OSP fiber laying, Splitter splicing and fiber trouble shooting.
• Installation of Huawei equipment’s (ONTs, Routers, FATs, Sub FATs etc) inside customer premises
• Activation of fiber including Migration and configuring of Cisco Router, ONT configuration
• Migration trouble shooting
• Planning, Monitoring and Coordination of teams
• Preparation of routing table
• Using testing equipment like OTDR, VFL light source and power meter
• B2H FAT installation.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Electrical Engineer Internee

April 2010 - April 2011

NTDC

Islamabad, Pakistan

April 2010 - April 2011

• Work with NPCC(NTDC), in LD’s Section
• Here I do the job of available capacity checking of IPP’s
• I have Sound Knowledge of PPA
• Worked on outages and Dispatch instructions
• Presently I am working NTDC 500 KV grid station Rawat Islamabad
• In grid station I worked as a shift engineer as well as on operation & maintenance.
• Worked in P&I (protection & instrumentation) section of 500 KV substation.
• Worked on substation relay protection.
• Worked on circuit breaker open test close test, contact resistance test and dew point test of SF6 insulation
• Worked on yearly maintenance of Circuit breaker of 500/220/132 KV voltage levels.
• Worked on Pneumatic, Hydraulic, spring charged & Air blast types of circuit breakers.
• Capacitance & dissipation tests, bushing insulation test, open circuit test, short circuit test, ratio test etc.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Education

University College of Engineering & Technology Mirpur (A.K) PAK

October 2009

October 2009

Bachelor's degree, Electrical Engineering

Pakistan

GPA (point): 3.2 out of 4

GPA (point): 3.2 out of 4

Skills

Electrical Engineer

Expert

Microsoft Office

Expert

FTTx

Expert

Transmission Lines

Expert

FTTH

Expert

Transmission Line

Expert

Team Lead

Expert

Electrical Engineer

Expert

Microsoft Office

Expert

FTTx

Expert

Transmission Lines

Expert

Languages

English

Native Speaker

Urdu

Native Speaker

Arabic

Intermediate

Memberships

Pakistan Engineering Council

Member

December 2009

Training and Certifications

Certifications
Saudi Council of Engineering cerificate
Jan 2017 - Dec 2019

Recommendations

Feb 2018

Construction managerManager

Mr. Irfan Ali is technically competent Electrical Engineer, Presently working with Mohammad Al Ojaimi in Khafji Saudi Arabia on High Voltage Over Head Transmission Line Projects. He well involved in review of OHTL, evaluation of Bids, coordination and liaison with the client and contractor, monitoring and review of progress, verification of contractor’s claims and contract administration. (2):Team-player; devoted and determined to achieve success. Multi Field Experience of OHTL Review, Survey & Project Management.

Hobbies and interests

Playing Cricket , Swimming & Reading