Mohammed Al Ojaimi Cont. & Esatablishment

البلد
المملكة العربية السعودية - الدمام
التعليم
بكالوريوس, Electrical Engineering
الخبرات
13 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 5 أشهر

Electrical engineer في Mohammed Al Ojaimi Cont. & Esatablishment
  • المملكة العربية السعودية - الدمام
  • أشغل هذه الوظيفة منذ يوليو 2016

• Leading Electrical, Civil and Mechanical Teams. Co-ordinate with EPC, consultant /client/ Subcontractor and customer. Handling project request (RFI, RFC, RFA, PR, PO etc…)
• Plan & profile, Sag and tension calculation, route with spotted structures.
• Clearance calculation, Conductor/OPGW fittings and joint box fittings and grounding details.
• Underground 1200mm2 and 2000mm2 cables rout/SS entrance.
1. 115KV BSP to Substation No: 2 & 5 (Energized) 10km Monopole OHTL.
2. 115KV BSP to Substation No: 3 (Energized) 12.6km OHTL.
3. 115KV BSP to Substation No: 4 (Ongoing) 3.2km UG.
4. 115KV BSP to Substation Ras ul Mishaib (Energized) 4km OHTL.
• Erection of GIS - BSP 380/115/13.8 KV Power Transformers (502, 67MVA).
• Receiving permit from SEC, raising material request, coordinate with designing team.
• Make Technical Proposal on site and field change notice (FCNs).
• Make a Co-ordination with Civil/Electrical/Mechanical staff in order to complete the work within the time frame. To prepare activity plan or bar chart, activity working schedule and running of project according to given schedule.
• Prepare Request for Inspections, MIR and Quantity take off Sheets. Execution of 380/115/13.8
KV, (UG) 1200mm2, 2000mm2 Cables including (Excavation, Testing, Backfilling, Protection
Tiles, warning Tape) Duct Banks and Unit Substations according to drawing and Standard.
• Consultation with manufacture’s manuals to determine installation, commissioning & startup.
• Follow-up and negotiating NCR related issues with supplier and client
• Inspecting and following of work progress; GIS, HVAC, Fire alarm system and testing commissioning to meet the time plan. Revises site assembly drawings, wiring schematics and related technical drawings, to include updating and as-built works.

Assistant Manager Operations في PESCO ( WAPDA) Pakistan
  • باكستان - بيشاور
  • مايو 2014 إلى مايو 2016

• Identify resources needed and assign individual responsibilities, manage day to day operational aspects of project and scope. Review deliverables prepared by team, apply methodology and enforce project.
• Monitor the construction activities of Transmission line such as Erection stringing, Conductor pulling, Sagging, Clipping, installation of spacer damper and vibration.
• DC Auxiliary power supply system. Lying and familiarization with all working drawings.
• Bus bar / cable laying tray system etc.
• MV and LV motor insulation and winding resistance test.
• Testing and commissioning of control panel of 6.6 KV.
• Fair knowledge of fire alarm system.
• Installation of MICC cable, gladding & panel erection
• Installation test of OPGW
• As an Electrical Engineer conduct the inspection during Retrofitting and check The OPGW Pulling, sagging and clipping, coordination between WAPDA & contractor.
• Any discrepancies at work noticed, advise them to a good solution to solve the problem as per approved IFC drawing.
• Received the RFI from the contractor to conduct inspection of work as requested by contractor.
• Documenting all inspections and tests on form as required by the project quality assurance plan.
• Prepare Transmittals and send to WAPDA for Review and Approval.
• Prepare Submittals and send to Contractor. Maintain log sheet for Transmittals and Submittals Review the contractor Drawings.Representation of Company in project site meetings and liaison with the Clients/Consultants.
• Work on all programs received from planning division for each and every project to meet the handover of each project on time. Planned, managed and executed following turnkey works;
• Complete construction of 132KV/11KV/440, AIS substation S/S, 11 Bays.
• Complete construction of 220KV AIS (Two Circuits).
• To deal with engineering staff and man power activity, quality control of the projects.

Electrical engineer في BinOmran Trading & Telecommunications
  • قطر - الدوحة
  • نوفمبر 2011 إلى مارس 2014

• ISP, OSP installation, maintenance and activation.
• Overall coordination liaising with clients and consultants, contractors and vendors regarding execution of job and planning/ scheduling of site activities, technical specification, approval and obtaining statutory clearances.


• Carrying out the inspection and testing of materials in accordance to quality plan & to satisfaction of consultant.
• Weekly & monthly progress report to the management.
• Inspection of switch gear panel installation and cable termination and bus bar torque.
• DC Auxiliary power supply system. Lying and familiarization with all working drawings.
• Bus bar / cable laying tray system etc.
• MV and LV motor insulation and winding resistance test.
• Testing and commissioning of control panel of 6.6 KV.
• Fair knowledge of fire alarm system.
• Installation of MICC cable, gladding & panel erection.
• OSP fiber laying, Splitter splicing and fiber trouble shooting.
• Installation of Huawei equipment’s (ONTs, Routers, FATs, Sub FATs etc) inside customer premises
• Activation of fiber including Migration and configuring of Cisco Router, ONT configuration
• Migration trouble shooting
• Planning, Monitoring and Coordination of teams
• Preparation of routing table
• Using testing equipment like OTDR, VFL light source and power meter
• B2H FAT installation.

Electrical Engineer Internee في NTDC
  • باكستان - إسلام أباد
  • أبريل 2010 إلى أبريل 2011

• Work with NPCC(NTDC), in LD’s Section
• Here I do the job of available capacity checking of IPP’s
• I have Sound Knowledge of PPA
• Worked on outages and Dispatch instructions
• Presently I am working NTDC 500 KV grid station Rawat Islamabad
• In grid station I worked as a shift engineer as well as on operation & maintenance.
• Worked in P&I (protection & instrumentation) section of 500 KV substation.
• Worked on substation relay protection.
• Worked on circuit breaker open test close test, contact resistance test and dew point test of SF6 insulation
• Worked on yearly maintenance of Circuit breaker of 500/220/132 KV voltage levels.
• Worked on Pneumatic, Hydraulic, spring charged & Air blast types of circuit breakers.
• Capacitance & dissipation tests, bushing insulation test, open circuit test, short circuit test, ratio test etc.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في University College of Engineering & Technology Mirpur (A.K) PAK
  • أكتوبر 2009

Specialties & Skills

Electrical Engineer
Microsoft Office
Transmission Lines
Transmission Line
Team Lead

اللغات

الانجليزية
اللغة الأم
الأوردو
اللغة الأم
العربية
متوسط

العضويات

Pakistan Engineering Council
  • Member
  • December 2009

التدريب و الشهادات

Saudi Council of Engineering cerificate (الشهادة)
تاريخ الدورة:
January 2017
صالحة لغاية:
December 2019

الهوايات

  • Playing Cricket , Swimming & Reading