Total Years of Experience: 11 Years, 5 Months
October 2012
To Present
MEP Engineer
at SIAC Industrial Construction and Engineering Company
Location :
Egypt
Specialized in Plumbing, HVAC & Fire Fighting Works
Handle different MEP activities on site
Revise design drawings, shop drawings and specifications for different
Systems (Technical Office Works)
Supervise different activities and handle to the consultant (QC)
Prepare daily, weekly and monthly report concerning site progress
Attending weekly and monthly meetings with all parties
Able to control manpower, and manpower distribution among different activities.
Can analyze the drawing & BOQ items
Can prepare construction schedule & report
Able to prepare materials list
Ensuring equipment and procedures comply with safety regulations.
Solving problems and providing technical advice.
Coordination between several activities
Projects
1-Secon Nile towers and Hilton hotel, Cairo, Egypt (Current)
Consist of:
1. Phase one (Residential Building 22 floors Hotel Apartment)
2. Phase two (Hilton Maadi Hotel 22 floors 250 Rooms )
3. Phase three (Podiums 3 floors have all equipment’s rooms)
Working in the following fields
Firefighting: pump room, seamless pipes (welding‐threaded‐groove), sprinkler system, foam
system, Co2 system, part of fire alarm system.
Plumbing: piping (PPR‐HDPE‐UPVC‐Ductile iron), lift stations, oil interceptor system, grease
interceptor system, swimming pools, fountains, big hotel kitchens, big hotel laundry.
Infrastructures mechanical work
HVAC systems: FANS, FCU, AHU, VRV system, centrifugal chiller, absorption chiller LG, boiler
room include (boilers‐heat exchangers‐storage tank‐pumps‐softener‐expansion tanks)‐cooling
towers, split system
• Owner (Saudi Egyptian company “SECON”)
• Main contactor (SIAC & ARABTECH)
• Consultant (Hill PM& EHAF)
• Subcontractor MEP (SIEMENS).
• Subcontractor kitchens (RATOMAG)
South Helwan Super Critical Power Plant 3*650 MW; Bani Sueif (CP-123) - Egypt
Working in the following fields
Chlorination building Firefighting design and supervision with Veolia Company (part time)
2-South Helwan Super Critical Power Plant 3*650 MW; Bani Sueif (CP-123) - Egypt
Consist of:
1. Office Building, Warehouse Building, Maintenance Building, Guard’s Dormitory Building,
Oil Storage Building
2. Temporary potable water station
3. Project Temporary Infrastructure
Working in the following fields
Firefighting: piping (seamless‐ductile iron underground), sprinkler system, fire hose cabinets
lines, Siamese, fire hydrant lines
Plumbing: piping (PPR‐HDPE‐UPVC‐cast iron sangobhan), lift stations, infrastructures for project
HVAC systems: FANS, Dx‐ package Petra, VAV system, split system
Handle different MEP activities on site
Revise design drawings, shop drawings and specifications for different
Systems (Technical Office Works)
Supervise different activities and handle to the consultant (QC)
Prepare daily, weekly and monthly report concerning site progress
Attending weekly and monthly meetings with all parties
Able to control manpower, and manpower distribution among different activities.
Can analyze the drawing & BOQ items
Can prepare construction schedule & report
Able to prepare materials list
Ensuring equipment and procedures comply with safety regulations.
Solving problems and providing technical advice.
Coordination between several activities
Projects
1-Secon Nile towers and Hilton hotel, Cairo, Egypt (Current)
Consist of:
1. Phase one (Residential Building 22 floors Hotel Apartment)
2. Phase two (Hilton Maadi Hotel 22 floors 250 Rooms )
3. Phase three (Podiums 3 floors have all equipment’s rooms)
Working in the following fields
Firefighting: pump room, seamless pipes (welding‐threaded‐groove), sprinkler system, foam
system, Co2 system, part of fire alarm system.
Plumbing: piping (PPR‐HDPE‐UPVC‐Ductile iron), lift stations, oil interceptor system, grease
interceptor system, swimming pools, fountains, big hotel kitchens, big hotel laundry.
Infrastructures mechanical work
HVAC systems: FANS, FCU, AHU, VRV system, centrifugal chiller, absorption chiller LG, boiler
room include (boilers‐heat exchangers‐storage tank‐pumps‐softener‐expansion tanks)‐cooling
towers, split system
• Owner (Saudi Egyptian company “SECON”)
• Main contactor (SIAC & ARABTECH)
• Consultant (Hill PM& EHAF)
• Subcontractor MEP (SIEMENS).
• Subcontractor kitchens (RATOMAG)
South Helwan Super Critical Power Plant 3*650 MW; Bani Sueif (CP-123) - Egypt
Working in the following fields
Chlorination building Firefighting design and supervision with Veolia Company (part time)
2-South Helwan Super Critical Power Plant 3*650 MW; Bani Sueif (CP-123) - Egypt
Consist of:
1. Office Building, Warehouse Building, Maintenance Building, Guard’s Dormitory Building,
Oil Storage Building
2. Temporary potable water station
3. Project Temporary Infrastructure
Working in the following fields
Firefighting: piping (seamless‐ductile iron underground), sprinkler system, fire hose cabinets
lines, Siamese, fire hydrant lines
Plumbing: piping (PPR‐HDPE‐UPVC‐cast iron sangobhan), lift stations, infrastructures for project
HVAC systems: FANS, Dx‐ package Petra, VAV system, split system
March 2014
To Present
senior mechanical engineer
at SIAC
Location :
Egypt - Cairo
Senior mechanical engineer (MEP)
Share on Facebook
Share on Twitter
Share Via Email