Production engineer
alfanar
Total years of experience :11 years, 9 Months
Production Engineer at Al Fanar building systems
Precast factory
Complete analysis of production process in order to implement an enterprise resource planning system to manage inventory, track stock and manage the production orders based on material requirements planning.
- Evaluation, implementation and control production process of Pre-cast elements (HCS slabs, Pre-stressed beams, pre- Stressed TT slabs and other elements) in order to increase capacity, optimize costs and resources used.
- Inspecting civil engineering works, organizing and supervising works.
- Optimum control of workforce utilization, facility layout, operational data and production schedules to ensure usage of resources is cost effective.
- Establish programs for the coordination of precast concrete, Production, transportation and installation activities.
Supervision & implementation Construction of 6 residential buildings in the Housing project of The Armed Forces AT Borg AL Arab in Alexandria
Supervision of workers
Preparing accomplishment reports
Preparation of progressive billing, change orders and cost proposals
Coordination with the suppliers and trade sub-contractors
Attend site meetings
Preparation of sub-quotations and evaluation of progress billing of sub-contractors
Monitoring of the project
Planning and scheduling of the activities during the duration of the project
QA/QC
Designing residential buildings
Quantity survivor
Site Engineer
Site Engineer
@ 10th Of Ramadan city