Total Years of Experience: 15 Years, 1 Months
August 2011
To Present
Project Control Manager
at Huawei
Location :
Saudi Arabia - Riyadh
Responsible for tracking the project with their different stages in order to maintain the project tracker & reports, that actually helps to predict the forecast which leads to have good eye on project rollout. Some major responsibilities are
Maintaining the project tracker on daily, weekly & monthly basis.
Identifying the GAP with description & forecast.
Having close eye on project stopper.
Escalating the core issues & maintaining the rollout plan.
Dealing with different departments in order to get the current status.
Preparing the reports & presentable slides to update the higher management.
Query Tracking
Maintaining the project tracker on daily, weekly & monthly basis.
Identifying the GAP with description & forecast.
Having close eye on project stopper.
Escalating the core issues & maintaining the rollout plan.
Dealing with different departments in order to get the current status.
Preparing the reports & presentable slides to update the higher management.
Query Tracking
March 2010
To April 2011
Transmission/BSS Engineer
at Mobiserve Holding
Location :
Pakistan - Islamabad
Responsible for monitoring the TXN/BSS network performance of given sites cluster on daily basis in close collaboration with NOC teams on Mobilink Project, with given responsibilities,
24/7 collaboration with Mobilink NOC teams to ensure maximum network availability.
Team management in order to ensure the availability of an individual to tackle the TT.
Planning monthly PM activity of Indoor/outdoor units to prevent major fault that leads to outage.
Responsible for complete site maintenance Including Electrical/Mechanical & Transmission.
Rectifying queries with the help of Alcatel BTS terminal and taking care of all kind of alarms (Sector Down, VSWR, FLT Combiner, FLT TRE, Fan Faulty, Intruder, Genset On, Low Voltage, Rect. Major, Temperature, ).
Rectifier (Modules, Battery Backup Check, LVD Bypass & MCU Setting)
Transmission - NEC Microware links Health Check (4E1, 16E1 & 48E1) activity to diagnose the faulty channels and loosen connection to avoid links disconnection through Abis. Incase of path loss, path verification activity is performed just in case site is down due to Abis break. Incase of fluctuation & alarms on MW links, responsible of dish alignment
Feeder Cables connectivity throughout BTS and RE Antennas being checked to avoid VSWR Alarm.
Gensets (John deer 31KVA, Perkins 20KVA, 27KVA, 30KVA) monthly oil & filters check activity.
Electricity supply is being checked by ATS Panel (i-e Magnetic Contactor, Delay Timers, UVT Relay etc) in order to avoid major breakdown.
Electrical (ATS Panel, Distribution Panel)
Mechanical (Genset Auto Setting Disturbed, Radiator Chock, Oil Finished, Heat up, Air locked, module faulty, control panel)
Min Acceptable NAR 99%
24/7 collaboration with Mobilink NOC teams to ensure maximum network availability.
Team management in order to ensure the availability of an individual to tackle the TT.
Planning monthly PM activity of Indoor/outdoor units to prevent major fault that leads to outage.
Responsible for complete site maintenance Including Electrical/Mechanical & Transmission.
Rectifying queries with the help of Alcatel BTS terminal and taking care of all kind of alarms (Sector Down, VSWR, FLT Combiner, FLT TRE, Fan Faulty, Intruder, Genset On, Low Voltage, Rect. Major, Temperature, ).
Rectifier (Modules, Battery Backup Check, LVD Bypass & MCU Setting)
Transmission - NEC Microware links Health Check (4E1, 16E1 & 48E1) activity to diagnose the faulty channels and loosen connection to avoid links disconnection through Abis. Incase of path loss, path verification activity is performed just in case site is down due to Abis break. Incase of fluctuation & alarms on MW links, responsible of dish alignment
Feeder Cables connectivity throughout BTS and RE Antennas being checked to avoid VSWR Alarm.
Gensets (John deer 31KVA, Perkins 20KVA, 27KVA, 30KVA) monthly oil & filters check activity.
Electricity supply is being checked by ATS Panel (i-e Magnetic Contactor, Delay Timers, UVT Relay etc) in order to avoid major breakdown.
Electrical (ATS Panel, Distribution Panel)
Mechanical (Genset Auto Setting Disturbed, Radiator Chock, Oil Finished, Heat up, Air locked, module faulty, control panel)
Min Acceptable NAR 99%
Share on Facebook
Share on Twitter
Share Via Email