Issam  AbuSalowmm, Project Manager

Issam AbuSalowmm

Project Manager

Memar Hajer Construction Contracting .

Location
Saudi Arabia - Riyadh
Education
Bachelor's degree, Civil Engineering
Experience
18 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 2 Months

Project Manager at Memar Hajer Construction Contracting .
  • Saudi Arabia
  • My current job since December 2022

The Projects was Handled & Delivered:

✱ Extension of Sheraton Dammam Hotel | Client: Dammam Hotels Company | Design Consultant: IDA International Design Associates.
✱ The Stage - Marriot ‘Renaissance’ Hotel, Riyadh, KSA | Client: Al Saedan Company for Real Estates | Architect Design Consultant: Syden Design
Interior Design Consultant: Kristina Zanic Interiors | Total Area of Hotel 25, 000 M2, 248 Keys | Total Area of Commercial Spaces 18, 000 M2.
✱ Luxury Private Residence Villa | Client: Dr.KAF | Designer: Naga Architect (Tarek Naga Architect) | Construction and Fit Out Works.
✱ Private Villas | Multi Client | Design Consultant: Luxury Stones.

Essential Duties and Responsibilities:

♦ Plan, Schedule and Track Project Timelines and Milestones.
♦ Develop and Deliver Progress Reports, Communication with The Client, and Any Required Documentation to Client.
♦ Approve Design, Drawing, Details Before Sending to The Client and Attain Approvals Prior To Commencement of Works on Site.
♦ Follow Up and Receive Approvals from All Concerned Authorities to Commence Works on Site.
♦ Direct and Manage Project Development from Commencement to Completion as Per Work Schedule.
♦ Manage Project Daily and Ensure Proper Requirement of Manpower, Materials, Tools for Daily Progress and To Ensure the Completion of Project on Time.
♦ Prepare the Work Schedule in Coordination with The Operations Manager/Site Supervisor/Subcontractors and Ensure Completion as Per Schedule.
♦ Prepare BOQ And Provide Suppliers Prices, Specifications, Etc. To Complete The BOQ.
v Inform the Estimations Team on The Additional Works, Progress, Delays on Site and Take Necessary Action to Resolve the Same at The Earliest.
♦ Discuss with the Team and Finalize the Subcontractors and Manage Smooth Working Atmosphere Between Various Subcontractors on Site.
♦ Effectively Communicate Project Expectations to Team Members in A Timely and Clear Pattern.
♦ Identify and Resolve Issues and Conflicts Within the Project Team and Manage Project Dependencies and Critical Path.
♦ Conduct Project Completion Reports and Create a Recommendations Report in Order to Identify Successful and Unsuccessful Project Elements.
♦ Ensures Project Documents Are Updated, Completed, And Stored Appropriately.

Construction Manager at Havelock One Interiors W.L.L
  • Saudi Arabia - Riyadh
  • September 2020 to December 2022

Havelock One Interiors is a leading Turnkey Fit-out and Manufacturing in the Middle East, established in 1998, Provide Specialize Interior Contracting and Manufacturing of Bespoke Joinery, Metal Works and Elaborate Shop-Fittings for Hospitality, Retail, F&B, Commercial, Entertainment, Luxury Residence & Government. Being Driven by The Aspiration to Deliver Exceptional Quality Through the Power of Thoughtful Precision.

The Projects was Handled & Delivered:

✱ St. Regis Marriot Hotel at VIA Riyadh Development | Client: SELA | Main Fit Out Works Contractor: BAUMAT | Archi. Design Consultant: Dar AlOmran. Interior Design consultant: Kristina Zanic Interiors.
Bringing The Extraordinary Hotel to Life by Delivering the Manufactory and Installation of Bespoke Joinery For 83 Guest Rooms, Royal Suites, And All Public Areas, In Addition Execution Interior Fit Out for The Lavish Spa Debut in Same Development Area.
✱ Villa Mamas Restaurant - Bujairi F&B Terrace, Diriyah Gate, Riyadh, KSA. | PMC: Compass Project Consulting | Design Consultant: VERHALL Studio.
✱ Diriyah Gate Development Authority (DGDA) Head Offices, Bespoke Renovation works for many Spaces inside the Building.
✱ Mandarin Oriental Hotel (Tendering Study Project) |Client: Alkhozama Properties | Design Consultant: Adam Tihany, New Yor

Project Manager at IDWorks Global.
  • Saudi Arabia - Riyadh
  • May 2016 to May 2020

IDWorks Global is an International Design & Build Firm, Practicing Focusing on Maximizing Organizational Objectives & Profits by Creating Efficient Workplaces, with nine Offices Across the GCC, Australia and Asia (Philippine), ID Works Has Grown to Become the Region’s Leading Innovative Workplace Design & Build Practice with A Particular Focus on Workplace Wellness & Corporate Office Interiors.

Involved in Delivery the Listed Below Projects:
✱HITA Health IT Administration Building in King Faisal Specialist Hospital & Research Center (KFSHRC) -Riyadh | Renovation Fit Out Project.
✱ REDSEA Global | Digital City-Riyadh |Area 2000 m^2, 2 Floors | Core and Shells Turnkey Fit Out Project.
✱ MUFG Tokyo Bank | Digital City -Riyadh | MEP Consultant: CUNDALL | Turnkey Fit Out Project.
✱ BAIN & Company KSA main Office | Digital City - Riyadh | Area 120 m^2. | Turnkey Fit Out Project.
✱ Saudi Telecom Company STC Solutions -Data Centre | Digital City, - Riyadh | Total Area 2, 000 m^2 | Turnkey Fit Out Project.
✱ SAMA- Saudi Arabia Monetary Agency in KAFD Project | Total Area 7, 000 m^2, 7 Floors | Core and Shells Turnkey Fit Out Project.
✱ Contacts Centers Company CCC Bespoke Interior Fit Out for Riyadh Main Facilities, | Total Area 11, 500 m^2. | Bespoke Turnkey Fit Out Project.

Construction Manager at Saudi Bin Ladin Group
  • Saudi Arabia - Riyadh
  • February 2010 to March 2016

■ Facade Site Manager
✱ Package PPA-30, Zone 3 and Zone 4
Essential Duties and Responsibilities:
♦ Liaison with Architects, Façade Sub-Contractor, Consultants in daily progress issues at each Building Tower.
♦ Ensuring the Site Work Is Carried Out as Per the Project Shop Drawings, Specification and Standards.
♦ Coordinate and Follow Up the Visual Mock-Ups, Performance Mockups Tests, Inspections and Handing Over.
♦ Planning, Progress, Implementation and Evaluation of Day to Day.
♦ Coordination, Supervision, Engineering Secondary Steel Work and Handing Over for Façade Subcontractor.
♦ Prepare Weekly Report for Each Tower Need It for Façade Work, to Start and Approach to Handing Over to The Façade Sub-Contractor.
♦ Supervision of Execution Complex 3D As-Built Surveys of The Sub- and Super-Structure.
♦ Follow up the Progress of Concrete and steel structure, Curtain-Walling and Cladding works at each Tower Building. Working with Façade Subcontractors: Permasteelisa Gartner, P. Scheldebouw, Tosoni, Alurage, Lindner/Schmidlin, Martifer, Enviai, Al-Ghurair

■ Construction Manager
✱ Package PPA-30, this Package concludes Full Construction for 30 Tower Building, Building Tower
5.03 and Building Tower 3.10
Essential Duties and Responsibilities:
♦ Following up Day by Day the Construction Activities in Tower Building Plot 5.03 & 3.10 In KAFD.
♦Verify, Reviewing and Execute as per approved latest Architectural Shop Drawings.
♦ Contact with Site Subcontractors to Arrange and Coordinate the daily Site Activities.
♦ Manage and implement the Executed Finishing Components Inspections Site.
♦ Coordination with Parcel Managers for Many Constructions and Finishing Issues and Giving Action and Solution.
♦ Solve the major and minor Site Problems that Exposed During the Construction Process.
♦ Coordinate with Mechanical, Electrical site team to mitigate any problem could show up through work progress.
♦Coordination and follow-up of Implementation of HSE issues in assist with Zone Safety Manager.


■ Site Manager
✱ PPA10 -this Package concludes Full Construction for 4 Tower Building at Plot 4.07&4.08, Plot 2.09
and Plot 2.14, Each Tower Contain 5 Basement, GF & Mezzanine as Retail Floors, Offices Floors,
Single Mechanical Floor, Residential Floors.
Essential Duties and Responsibilities:
♦ Following up Day by Day the Construction Activities in Tower Building 4.07 & 4.08, 2.09, 2.14 In KAFD.
♦ Verify, Reviewing and Execute as per approved latest Architectural Shop Drawings.
♦ Contact with Site Subcontractors to Arrange and Coordinate the daily Site Activities.
♦ Manage and implement the Executed Finishing works through Site inspections.
♦ Coordination with Parcel Managers for Many Constructions and Finishing Issues and Giving Action and Solution.
♦ Solve the major and minor Site Problems that Exposed During the Construction Process.
♦Coordinate with Mechanical, Electrical site team to mitigate any problem could show up through work progress.

Assistant Project Manager at Rio Limited Company
  • Saudi Arabia - Medina
  • August 2008 to December 2009

Involved in Delivery the Below List Project:
✱ Construction of Madinah Municipality Building in Al-Madinah Al-Munawara, KSA
Client: SA Ministry of Municipal and Rural Affairs.

Duties & Responsibilities:
Manage, Supervise and Lead the Project Site Day to Day.
♦ Calculate the Quantities of Pavements, Reinforcement Concrete, In the whole of Project.
♦ Inspection of Concrete Works, Excavations, Embankments, Pavements Layers.
♦ Co-Ordination among Project Engineers, Consultant and Subcontractors for Every Activity.
♦ Ensure That Quality of Works Comply with the Required Standard and Specification.
♦ Prepare Weekly/Monthly Accomplishment Report.
♦ Coordination with the Project Manager for Many Constructions and Finishing Issues and Giving Action and Solution.
♦ Solve the major and mentor Site Problems that Exposed During the Construction Process.

Construction Supervisor at Trans Arab Countries Engineering Corporation (TARENCO)
  • Jordan - Amman
  • June 2003 to September 2005

Involved in Delivery the Below Project:
✱ Jordan Ministry of Health (MOH) Head Office Building, Amman- Jordan. | Consultant: Bitar Consultant Office.
The Building Consisting of Ten Floors, Plus Three Basements with A Full Height Central Atrium Covered in A Grand Skylight. This Building Houses the Scattered Administrations of MOH In a Single Facility, The Project Is Constructed Over 30, 000 Sqm. A Site with Full Landscape Design. This Is Not Only the Largest Government Building to Be Constructed in Jordan, But Also the Set Example for The Similar Buildings to Follow. The Work Included Bespoke Interior Decoration and Furnishing for The Whole Building.

Project Coordinator at | Geograph for Engineering Services
  • Jordan - Karak
  • May 2002 to September 2002

Involved in the Listed Below Projects:
✱ Multiple Residential Areas in Amman and Irbid
✱ Andalusia Villas Complex in Madaba, Jordan
✱ Hilton Dead Sea Resort & Spa in Dead Sea, Jordan
✱Panorama Dead Sea Resort Complex in Madaba, Jordan.
General Duties and Responsibilities:
♦ Undertaking and Supervising Technical Site Surveys at Each Construction Project from Conception to Completion.
♦ Supervise and follow up for the Execution Works of box Culvert, Pipes Culverts, Sewer Pipes Infrastructure Networks.
♦ Calculate each Project Quantities of Excavation, Backfilling, Pavements Suitable Materials, Concrete Quantities.
♦ Handover Completed Finished Road Layers, Reinforced Box & Pipes Concrete Culvert works for the Project Consultant.
♦ Stakeout Points for Concrete Core walls, Slabs, Columns and Leveling Works for Concrete Slabs.

Education

Bachelor's degree, Civil Engineering
  • at Al-balqa' Applied University
  • June 2008

Extensive Studying Courses in Discipline, Concrete Structure, Steel Structure, Design Management, Project Mangement and Quantities Surveying.

Diploma, Construction Surveying
  • at Wadi Seer Training Centre | UNRWA
  • June 2003

Extensive Studying Courses in Discipline, Construction Surveying, Land Surveying and Quantities Surveying.

Specialties & Skills

Presentation & Communication Skills.
Planning, Problems Solving and Decision Maker.
Team Working and Building Skills.
Stakeholders Interface and Creating Good Relationships.
Problem Solving and Decision-Making Abilities.
Leading and Motivate the Project Teams.

Languages

English
Expert
Arabic
Native Speaker
German
Beginner

Memberships

Saudi Council of Engineers (SCE)
  • Member
  • January 2010
Jordanian Engineering Association (JEA)
  • Member
  • July 2008

Training and Certifications

Preparation for PMP Exam (Training)
Training Institute:
Knowledge Square Centre -Riyadh
Date Attended:
January 2024
Duration:
48 hours

Hobbies

  • Writing ,Sketching,Walking,Cycling