Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Jagadish Gadiraju, Thru Tubing Systems

Jagadish Gadiraju

Thru Tubing Systems ·Thru Tubing Systems MENA

Kuwait

Higher diploma, Petroleum And Gas Engineering

Work experience

Total years of experience: 13 years, 8 months

Thru Tubing Systems

September 2022 - Present

Thru Tubing Systems MENA

Al Ahmadi, Kuwait

September 2022 - Present

Provide Technical Clarification and Sales to the clients form MENA Regional and Central Asia.

thur tubing solutions via wireless and SL services

Company industry:
Oil & Gas
Job role:
Sales

Senior Wireline Field Engineer

August 2021 - Present

Senergy Holding

Al Ahmadi, Kuwait

August 2021 - Present

Work as Senior Wireline Field Engineer, running Cased hole wireline services.

services include : PLT, ILT, PNC, Corrosion Log, CBL Log, RCT Jobs.

Software: Warrior 8, Antares for PNC,

Tools : Sondex, GoWell, Antares

Company industry:
Oil & Gas
Job role:
Engineering

Wireline Filed Engineer

January 2018 - February 2021

Eastern United Petroleum Services

Al Ahmadi, Kuwait

January 2018 - February 2021

Work and perform the Casedhole wireline logging services in Kuwait for KOC field and Wafra Field.

services include: PLT, ILT, Cossosion Log, CBL Log, Caliber Log, PNC, RCT, Set Bridge Plug using Neonest setting tool.

Also perform the Log with CT deployment for the Highly Deviated Wells for PLT, ILT and PNC service.

manage the Wireline Crew and pre and post check the service tools prior and post completion of the Jobs.

Company industry:
Oil & Gas
Job role:
Engineering

Jr.Wire Line Engineer

January 2017 - January 2018

Eastern United Petroleum Services

Al Ahmadi, Kuwait

January 2017 - January 2018

Learn the basic wire line operations form rig up and rig down. learn Casedhole wirline services including GR, PNC, PLT, ILT, Corrosion Log, CBL Log, RCT and other services.

Company industry:
Oil & Gas
Job role:
Engineering

Driller/Asst Driller

January 2015 - August 2015

Deep Water Drilling

Mumbai, India

January 2015 - August 2015

Work as Driller Asst, in Bombay high.

manage the drilling operations and drilling crew.

Company industry:
Oil & Gas
Job role:
Oil and Gas

assistant driller

July 2011 - January 2015

Aban Offshore Ltd.

Kish, Iran

July 2011 - January 2015

started as GET (Graduate Engineer Trainer) from Campus Placement. and pormotes to Asst.Driller in year 2012.

looks after the Drilling operations, which includes BHA, Mud systetms in put room and pump room., Shale shaker area. manage inventory and prepare the prior operations for the drilling operations. also prepare the Kill sheet for the drilling operations for well contact operations.

Keeping Safety in mind and operations.

Company industry:
Oil & Gas
Job role:
Oil and Gas

Intern Mechanical/Design Engineer

February 2011 - July 2011

Microsol International LL FZE, Fujairah

Fujairah, United Arab Emirates

February 2011 - July 2011

Internship: MICROSOL INTERNATIONAL LL FZE, FUJAIRAH

Feb 2011 - July 2011

 Currently as a Mechanical engineer, I have been allotted project dealing with Design of automated tube loader (paddle-slider system). This project deals with the designing of 4-stack diffusion furnace used in manufacturing of solar cells with concept design and review till concept is finalized, Resource planning: cost estimation and BOM required, Procurement of materials, Installation of machine, Testing and trouble shooting.

 Also dealing with the project related to Design and development of Basket unloader, were simple mechanism for unloading wafers from Teflon baskets are to be designed.

________________________________________________________________________________________________________________________

Trainee Engineer: SHARJAH CEMENT & INDUSTRIAL DEVELOPMENT CO.

July 2009- August 2009

 The Trainee Programme involved understanding about the Cement manufacturing process from procurement of raw material, raw milling, pyroprocessing, cooling of cement clinker, storage of cement clinker, grinding, packing and loading.
 Understood technical submittals for vibration analysis and dye penetration.

________________________________________________________________________________________________________________________

Internship: REITZ MIDDLE EAST

June 2009 - July 2009

 I have done internship in REITZ MIDDLE EAST, Saif Zone, Sharjah, UAE for two months were I was given project to improve and include better solutions for industrial fans from Centrifugal to Axial Fans
 Understood the working principle of centrifugal and axial fans and to review Drawings and visual inspection of completed jobs.

Company industry:
Mechanical Engineering
Job role:
Teaching and Academics

Education

Heriot-Watt University Dubai

August 2017

August 2017

Higher diploma, Petroleum And Gas Engineering

United Arab Emirates

BIRLA INSTITUTE OF TECHNOLOGIES AND SCIENCES(BITS-Pilani)

August 2011

August 2011

Bachelor's degree, Mechanical Enggineer

United Arab Emirates

Project Project: Techfest 2009-10 Worked on the project “Experiment Investigation on Hovercraft functioning” in Techfest 2009-10(BITS-Dubai).Have demonstrated the working and functioning of hovercraft with 3rd position in category of working model & consolation position in the category of non-working model. Project: Design and Fabrication of Stirling Engine. Worked on a project “Design and Fabrication of stirling engine” in 2010-2011 to build and design straightforward working Stirling engine in college workshop. Project: Failure Analysis of cement factory kiln. Worked on “Failure Analysis on cement kiln” related to cement kiln was performed. Data related to failures were collected from a cement factory in UAE. Data was analyzed using FMEA, FTA and reliability block diagram. ________________________________________________________________________________________________________________________ Co-Curricular Activities: • Took part in BITS, PILANI-DUBAI Technofest-2009 with 3rd position in category of working model and consolation position in category on non working model. • Took part in ENGINUITY 2009 (National level inter college tech fest) and secured 1st position in category of Model Making. • Participated in APOGEE 2010(xxviii International Technical Festival) at BITS, PILANI-RAJASTHAN INDIA in categories of Junkyard Wars, Track-O-Mania and Astro Workshop.

Skills

Testing

Expert

Factory

Expert

Manufacturing

Expert

Fabrication

Expert

Materials

Expert

Proe

Beginner

AutoCAD

Intermediate

Solid works

Beginner

MS Office

Intermediate

Testing

Expert

Factory

Expert

Manufacturing

Expert

Fabrication

Expert

Materials

Expert

Languages

English

Expert

Hindi

Intermediate

Tamil

Beginner

Urdu

Intermediate

Arabic

Beginner

Memberships

ASME-American Society of Mechanical Engineering

Student Member

February 2010