Jameel Hussain PMP®, Sr. Planning Engineer

Jameel Hussain PMP®

Sr. Planning Engineer

Khatib Alami- Saudi Consolidated Engineering Company

Location
Saudi Arabia - Riyadh
Education
Master's degree, Project Management
Experience
16 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 6 Months

Sr. Planning Engineer at Khatib Alami- Saudi Consolidated Engineering Company
  • Saudi Arabia - Western Province
  • My current job since December 2017

•• Participating in CAPITAL EFFECTIVNESS PROGRAM initiated by SWCC to develop and improve the reporting procedures (Weekly/ Monthly), using Power BI, comprehensive Excel sheets, Risk Register, Stakeholder Register, Issue Register. Participated in different level workshops to train Consultant and Contractor representatives to adopt New SWCC procedures under CAPITAL EFFECTIVNESS PROGRAM.
• Projects interface with 3 consultants (2 x Khatib Alami, ILF) and 4 contractors (2 x MAPA, SSEM, AICC)
• Liaison with A.T. Kearney (Management Consultant Company) for development / implementation of Power BI reporting system across the SWCC.
• Provide project controls techniques to SWCC. Presentations to my Saudi colleagues for Planning Know How Transfer.
• Verify and approve Work Breakdown Structure for the Project.
• Review and analyze Primavera resource loaded baselines / recovery EPC schedules including narrative and supporting Information.
• Analyze critical paths to determine effect of changes on the schedule.
• Develops and implements project scheduling procedures across all three projects to maintain common finish dates for key interfaces between the projects.
• Look ahead presentations to SWCC for 50%, 75% completion phases of the projects, forecast delays and propose corrective / preventive measures.
• Preparation of EOT assessments.
• Support team members to prepare, monitor & track “Risk Registers” & “Lessons Learnt”.
• Review and analyze weekly dashboards, monthly progress reports from consultants for submission to SWCC head office.
• Attend bi-weekly progress meeting and evaluate work performed.u8-8u7pj,
• Performs other responsibilities associated with this position as may be appropriate under the direction of Chairman of the Taif Committee.

Planning Engineer at TYPSA Consulting Engineers and Architects
  • Saudi Arabia - Riyadh
  • September 2015 to November 2017

I) CTW 130, Jubail Internal Railway Networl ( SAR 983M ), (06 months in Corporate office, 18 months at site)
II) CTW 140, Ras al Khair Terminal ( SAR 39M ).(Weekly Site Visits)
III) CTW 120, Jubail to Dammam Link (SAR 827M ),
IV) CTW 320 Wa’ad Shamal Project ( SAR 694M ),
• Monitoring and Controlling of project milestones set by the client.
• Preparation of WBS in accordance with scope of work.
• Preparing Daily, Weekly and Monthly Progress Reports for Client.
• S-curve preparation and analysis.
• Gathering site progress information and incorporating in the Progress reports including Cash flow.
• Analyzing Look ahead programs.
• Critically analyzing the scheduled activities as per Planning schedule submitted and on-going site activities.
• Monitoring and ensuring periodic reporting of Contractor/ subcontractor schedules.

Planner at Railway Project management Company
  • Saudi Arabia - Riyadh
  • October 2013 to August 2015

• Analysing Daily- Weekly- Monthly Progress reports prepeared and submitted by the Contractor.
• Critically reviewing the Planning Schedule prepared and submitted by the contractor.
• Critically analysing the scheduled activities as per Planning schedule submitted and on-going site activities.
• Guiding the contractor about the deviations in critical path.
• Pridicting and Managing the floats in the schedule.

Planning Engineer at Golden Falcons Contracting Company
  • United Arab Emirates - Dubai
  • January 2012 to September 2013

• Planning the project activities, preparing the baseline program using computer software (primavera P6),
• Updating the program in order to check the project progress by comparing the actual progress with planned progress using earned value method
• Preparing look ahead programs
• Preparing project progress reports (daily, weekly, monthly)
• Attend meetings with End User, Client, Project Management, Consultant and Authorities, whenever required
• Attend progress meetings at site; prepare and issue minutes of meeting.
• Contractual correspondence as per the GCC & project specification, conditions of contract.

Planning and Contracts Engineer at Dasu Hydropower Consultants
  • Pakistan - Lahore
  • January 2011 to December 2011

• Planning of Buildings (project offices, residential houses, appurtenant facilities like Hostels, Rest Houses, Schools, Mosques, Hospital, Markets etc)
• Worked on Scheduling and costing of different packages of DASU Hydropower Project
• Worked on different Contract Documents of DASU Hydropower Project.
• Project Planning of Detail Design of the Project various phases.
• Construction Plan for Different Contract packages of Dasu Dam
• Detail Design of Infrastructure Facilities (Water Supply, Sewerage, and Storm Water Drainage) for the Residential Colony of DASU HYDROPOWER PROJECT staff.
• Worked on Detail Sewerage Design of Power House, Transformer Cavern and Main Control building.
• Worked on preparation of Bill of Quantities (BOQ) of infrastructure facilities.
• Worked on preparation of Bill of Quantities (BOQ) of Infrastructure Facilities in Power House, Transformer Cavern and Main Control Building

Manager Planning at M/S Rafique Borthers Construction Company
  • Pakistan - Lahore
  • February 2010 to December 2010

• Scheduling and Costing of running projects of the company on Primavera P6.
• Developed a daily Profit Loss system in M.S Excel, Quality Control Data sheets and Lined up the systematic Check and Procedure in the execution of the Projects, providing Sound foundation for the company to take part in International Competitive Bidding
Preparing look ahead programs
Preparing project progress reports (daily, weekly, monthly)
Attend progress meetings at site; prepare and issue minutes of meeting.
Contractual correspondence as per the GCC & project specification, conditions of contract
Claim analysis for time and associated cost
Plan and monitor deployment schedule of resources
Cost controlling and submission of project expenses reports
Preparation and coordination of contractor’s payments
Certify and approve subcontractor’s payments
Prepare and monitor subcontract agreements

Assistant Engineer at Walled City Lahore Authority
  • Pakistan - Lahore
  • November 2007 to January 2010

• Worked as PROJECT PLANNING ENGINEER at Infrastructure and Rehabilitation Improvement works Project at Muhammadi Mohallah inside Delhi Gate, Lahore including Storm & Waste Water Drainage Designs and Site Supervision.
• Worked as ASSISTANT PLANNING/ COORDINATION ENGINEER with AUERCON INTERNATIONAL CONSULTANTS and ACE (ASSOCIATED CONSULTANT ENGINEERS) on Conceptual and Integrated Infrastructure Design of Royal Trail, Storm water & Waste Water Drainage Project Delhi Gate, Lahore.
• Worked on preparation of PROCUREMENT PROCEDURE under WORLD BANK guidelines for the project. (Hiring of CONSULTANTS, Local and International, CONTRACTORS )
• Worked on Laying of New Sewerage, Storm water & Water Supply System in Kucha Charakh Garan, inside Delhi Gate, Lahore.
• Worked on Planning of Infrastructure Development of the Muhammadi Mohallah inside Delhi Gate.
• Worked as Team Leader in Plot and Building Survey with TOTAL STATION.

Assistant Engineer at Walled City Lahore Authority
  • Pakistan - Lahore
  • November 2007 to January 2010

• Worked as PROJECT PLANNING ENGINEER at Infrastructure and Rehabilitation Improvement works Project at Muhammadi Mohallah inside Delhi Gate, Lahore including Storm & Waste Water Drainage Designs and Site Supervision.
• Worked as ASSISTANT PLANNING/ COORDINATION ENGINEER with AUERCON INTERNATIONAL CONSULTANTS and ACE (ASSOCIATED CONSULTANT ENGINEERS) on Conceptual and Integrated Infrastructure Design of Royal Trail, Storm water & Waste Water Drainage Project Delhi Gate, Lahore.
• Worked on preparation of PROCUREMENT PROCEDURE under WORLD BANK guidelines for the project. (Hiring of CONSULTANTS, Local and International, CONTRACTORS )
• Worked on Laying of New Sewerage, Storm water & Water Supply System in Kucha Charakh Garan, inside Delhi Gate, Lahore.
• Worked on Planning of Infrastructure Development of the Muhammadi Mohallah inside Delhi Gate.
• Worked as Team Leader in Plot and Building Survey with TOTAL STATION.

Education

Master's degree, Project Management
  • at University of Engineering and Technology, Lahore
  • March 2012
Bachelor's degree, Civil Engineering
  • at University of Engineering and Technology Lahore
  • July 2007

Specialties & Skills

AutoCAD
Management
Primavera P6
Site Planning
AutoCAD
MS Office
Primavera

Languages

English
Expert
Arabic
Beginner
Urdu
Native Speaker

Memberships

Pakistan Engineering Council
  • Member
  • October 2012
Saudi Council of Engineers
  • Member
  • May 2015

Training and Certifications

Project Planning and Scheduling (Certificate)
Date Attended:
December 2012
PMP Training (Certificate)
Date Attended:
April 2014
StaadPro (Training)
Training Institute:
Pakistan Engineering Congress College
Date Attended:
November 2006