Mechanical Engineer/Maintenance/Operation
Al Shirawi Electrical And Mechanical Engineering
Total years of experience :9 years, 8 Months
Testing and Commissioning Including HVAC System and CHILLED WATER System
Plan and direct preventive maintenance schedules of various machineries and Instruments to increase machine up time and equipment reliability.
Write maintenance strategies to help with installation and commissioning.
Liaising with Dubai Municipality for Submission of Requirements.
Project management.
Responsible for selection and installation of all HVAC system.
Overlook all the MEP, Firefighting, Plumbing, works of the Building.
Overlook for Defect Liability Period (DLP) as warranty of Client.
Diagnose, maintain and repair mechanical equipment within the premises.
Implementing the planned preventive maintenance and safety programs and follow safety rules according to departmental procedures and instruction.
Ensure good relationship is built with internal and external costumers.
Perform special project and other responsibilities as assigned.
Manage the reactive, preventive and corrective maintenance of MEP SERVICES.
Supervise the team to meet all facilities management functional objectives.to ensure that client requirement and all contract are deliverable and complied.
Periodically review the performance of site and take corrective action to align with the budget goals.
Manage & supervise the maintenance Special service equipment(AMC) like lift, swimming pools, Firefighting authorized and approved as per company standard
Project management for all DULSCO internal Project
-Reviews all mechanical Plan
-Schedule Preventive maintenance of All Dulsco Properties, include Northern Emirates.
-Coordinate to Consultant for new internal projects.
Attend Weekly meetings for all updates of works.
-Review for the selection of FCU, AHU, Extraction Fan,
AJYAL TECHNICAL CONTRACTING June 2013 - June 2015 United Arab Emirates, Dubai (U.A.E.)
DESIGNATION: HVAC ENGINEER
Project- Burjuman Mall
Installation of HVAC System Including Fan coil units(FCU), Fan Coil units(Dx-System), Fresh Air Handling Units(FAHU), Air Handling Units(AHU’s), Make-up Air Unit(MAU), Ecology Unit(EU), Air Curtains, General Extract fans(GEF), Smoke Extract fans(SEF), Staircase Pressurization Fans(SPF).
Installation of CHILLED WATER System Including Water Cooled Chiller (1893TR), Cooling Tower (109.87 m3/s), Primary pump and Condenser Pump.
CLIENT: BURJUMAN
Consultant: Hyder Consulting
Main Contractor: Engineering Contracting Company
Distribute the work through concerned supervisors and Foreman.
Conducting leak test, slope test, pressure test and getting approval from the
Consultant.
Estimate and Costing.
Coordinate directly with project manager and also cooperate with Civil and
Electrical department.
Duct system designing following SMACNA codes.
Responsible for selection and installation of all HVAC system.
Preparing Bill of Quantities and purchase orders and follow up with suppliers.
Submitting request for Inspection (RFI) for the executed works to get approval by the Consultants.
Attending weekly meeting with the client/ consultant.
Coordinate to QA/QC for the inspection of the Materials Inspection Request.
Coordinate to QA/QC for the inspection of the Work Inspection Request
Preparation of Heat Load calculation as per ASHRAE standards.
Design maintenance strategies and procedures and diagnose breakdown problems.
Write maintenance strategies to help with installation and commissioning.
Plan and direct preventive maintenance schedules of various machineries and
increase machine up time and equipment reliability.
Microsoft excel and Microsoft word.
Testing and Commissioning Including HVAC System and CHILLED WATER System
Prepare daily plan Work.
Prepare Shops Drawing For Mechanical Plan.
Re-routing Duct, Chilled water piping and other services, while clashing with Engineer’s approval.
Prepare As-Built drawing as per Site.
Prepare Equipment schedules and Grill Schedules.
Installation of Chilled water pipe As per Resident Engineer Comments.
Installation of Ducting as per Engineer Comments
Binalbagan - Isabela Sugar Company. July 2010- May 2013
(BISCOM. Inc.)
DESIGNATION: Boiler Maintenance Engineer
JOHN THOMPSON AUSTRALIA(JTA-1) BOILER- 250Lb/hr. (water Tube Boiler)
FOSTER WHEELER BOILER- 150Lb/hr. (water Tube Boiler)
DRESSER-RAND STEAM TURBINE(Feed water)- 4500 rpm
WORTHINGTON STEAM TURBINE(Feed water)- 4600 rpm
DRESSER-RAND STEAM TURBINE(Induced draft fan)- 4750 rpm
WORTHINGTON STEAM TURBINE(Induced Draft fan)- 4800 rpm
WORTHINGTON CENTRIFUGAL PUMP- 300 gpm
BAGGAGE HANDLING CONVEYOR (Reliance) - 1000Lb/hr.
SAFETY VALVE(CRANE)- 2152 Lb./hr. Superheated pressure
ASH CONVEYOR(Reliance)- 1755 rpm
DEPARTMENT: BOILER
Responsible for supervising operation, maintenance, installation, repair of
Equipment.
Monitored and maintain the safety of the boiler and all the component parts.
Responsible for implementing operating procedure.
Worked with water tubes boiler operation.
Developed safety and maintenance procedure.
Maintain boiler and auxiliary unit, and detect malfunctions and make repairs.
Maintain and repairs boiler trims, valves, fittings, piping.
Inspected equipment to ensure safety operations.
Planning for schedules of repairing.
Monitored the running condition of steam turbines.
Maintaining mill auxiliary and mill drive.
Implement the lubrication technician for the lubrication of mill roller.
Monitor the high pressure and low pressure, and coordinate to Boiler Chief Engineer.
Monitored and maintain the safety of mill drives.
Maintain and repairs, fabrication, parts of the equipment
Assist the Mill Shift Supervisor for mill operation.
Distribute the daily plan work to mechanics.
Coordinate with the Powerhouse Department for the Load
COLLEGE Year Graduated Bachelor of Science in Mechanical Engineering 2008 UNIVERSITY OF NEG
URL removed due to policy violation. Please contact support for further information.