Project Civil Engineer
DAR CONSULTING ENGINEERS
Total years of experience :12 years, 9 Months
• Review of Project Master Deliverable Register.
• Review of Drawings.
• Construction of Bullet-proof Buildings.
• Construction of Security Gates.
• Construction of Anti-Vehicle Barriers.
• Construction of Floating Barrier in Sea.
• Changing of Fence to HCIS Class-1 and Class-4.
• Construction of Patrol road.
• Construction of foundations for 30m lighting Poles.
• Construction of Man holes and Foundations for lighting and Cameras.
• Construction of Security Systems like Road blocker, Raising Arm Barrier, Bollards.
• Construction of Crash Rated Arm Barrier.
• Reviewing and responding to Technical Queries by the EPC Contractor.
• Preparation of required documents for the project.
• Review and approval of quality plans and inspection test plans (ITP).
• Review and approval of vendor list.
• Review and approval of FAT, SAT, I-FAT.
• Review and validation of material requisitions.
• Attending weekly, monthly progress meetings whenever requested by client.
• Review of equipment/package data provided by vendor after purchase orders.
• Procurement expedition.
• Participation and expert contribution in engineering reviews and workshop sessions (Lessons Learned, Constructability and Operability, Risk Assessment)
• Review and validation of MOM prepared by EPC Contractor.
• Daily monitoring of site activities to ensure the construction is in line with approved project quality plan and project specification.
• Ensure safety on site.
• Review of Construction Monthly report.
• Field verification of site in terms of required manpower, machinery or equipment.
• Witnessing construction site inspection based on approved ITP and inspection of construction material at site.
• Third party coordination required for the project.
• Attending FAT, SAT as per approved ITP.
• Attending meetings and coordination with contractor to obtain any third party permits.
• Compilation of project data’s such as-built, inspection reports, quality checklists, vendor reports, third party inspection, O&M Manual, training, spare parts list etc.
• Analyze Client’s project related requirements.
• Cost Control during all stages.
• Lead project meetings as necessary for review of progress.
• Review of Method of Statement and Risk assessment.
• Collate and verify all As-built drawings.
• Co-ordination with the Contractor to rectify the defects during the defects liability period if required.
• Support Project department to prepare the gate pass to get gate authority approvals
• Quality Control and Quality assurance in site as per Project Quality Plan.
• Monitor and train junior QA/QC Engineers.
• Preparation of Checklists.
• Responsible for Material Request according to the specification.
• Ensure Safety in all Construction Activities.
• Forecast and plan the work following 2-weeks look ahead.
• Verifying the Planned Progress and Actual Progress.
• Preparation of Request for Inspection (RFI).
• Submission of Material Approvals & Sub-Contractor Approvals.
• Responsible for the Concrete activities in Site.
• Organize, implement & conduct QA/QC programs as per Company’s Policy.
• Coordinate Document Control of QC.
• Preparation of forms need for the project.
• Making Progress Weekly Report.
• Making Daily Man-Power list.
• Conducting Material Inspection.
• Replaying for the Technical Query (TQ) raised by Sub-Contractors.
• Reviewing the Quality Plan and Inspection Test Plan submitted by Sub-Contractor.
• Making Method Statement for various rectification works.
• Replying to NCR given by PMC.
• Making Corrective Action Report (CAR).
• Supervising 3rd party testing & submission of test reports.
• Reviewing the Vendor and take approval from PMC/Client.
• Co-ordination between QMD, MEP and HSE.
• Lead meeting between Quality, Planning, and Cost Control & Site team & make MOM.
• Good knowledge in Structural Works.
• Responsible for the inspections of Excavation, and Structural Backfill.
• Inspection of Termite Control and Vapor Barrier.
• Proficient knowledge in Block work.
• Responsible for Plastering works in site.
• Inspection for Painting works.
• Good Knowledge in Tile Works.
• Good knowledge in Waterproofing (Wet area & Roof area) (Combo and Membrane).
• Good knowledge in Interlock pavers.
• Preparation and submission of all Quality records.
• Knowledge in Ceiling gypsum False Ceiling.
• Capable of understanding Project specifications and related code of standards.
• Responsible for overseeing / audits of subcontractor Quality management systems.
• To ensure all the material delivered to site are inspected and conform to project specification
• Ensuring all the test reports is verified to meet contract requirement.
• Preparation and submission of operation manual.
• Good knowledge in piling works.
• Good Knowledge in Earthworks
• Site Administration & Quality Assurance.
• Supervision for the piling works (DMC & Auger boring) - IS 2911
• DMC we have done piling up to 15m.
• Auger Boring piling up to 30m.
• Supervision for all tests on piling (Load test, NDT, Pull over) -ASTM D-5882.
• Carryout all testing of materials in Site.
• Checking the Materials Delivered to site.
• Review QP and ITP
• Checking Cost Control in each phase of Construction.
• Quantity surveying - quantification using AutoCAD & MS Excel.
• Establishing Client requirement in Site.
• Submit Weekly, Monthly Progress Report.
• Verify As-build drawings.
• Approving Vendors as per the Company Profile and Specification.
• Preparing Bill of Quantity.
• Follow-up with Subcontractor/ site team to monitor project progress and make reports.
• Site visit, Subcontractor visit to ensure the project progress, company investigation etc.
• Attend weekly progress meeting with management and Client to issue potential issues /progress in project
• Conduct BID clarification meeting, Project explanation meeting with Subcontractors.
• Review Subcontractor’s quotation for execution stage in line with our Budget, Planned resource and profitability.
• Coordination with QMD, MEP & HSE department.
• Time management.
• Preparing Daily Man-Power List and verifying it in Site.
• Reviewing Project execution Plan.
• Constructed Road and drainage system approx. 10km.
• Checking Punch list for final hand-over to Client/Customer
• Execution of work according to client drawing.
• Site administration.
• Labor Management.
• Preparation of Daily Progress Report.
• Preparation of Bar Bending Schedule.
• Carryout Excavation as per approved drawing.
• Carryout Backfill with approved material.
• Carryout Compaction to the required level using Vibro Roller
• Construction of foundations & pedestrials for various mechanical structure and E&I equipment.
• Preparation of temporary site set-up building.
• Site Management in co-ordination with Procurement & QC Department.
• Asphalt works.
• Earth works.
• Concrete Works.
• Structural Access Ladder for Control Rooms.
• Structural Pipe Rack for Mechanical Purpose.
• Construction of Duct Banks and Man holes.
• Construction of catch basins.
• Construction of Retaining walls.
• Construction of Boundary wall and fencing
Now doing a course in INTERNATIONAL CONSTRUCTION MANAGEMENT with my job.
I take Bachelor of Technology in Civil Engineering from CALICUT UNIVERSITY, Calicut Kerala